M40 Southbound, Jct 11 to Jct 10, hard shoulder closure.
ClearedM40 Southbound, Jct 11 to Jct 10, hard shoulder closure.
- Start time
- Sun, Aug 23, 2026 9:17 AM
- Expected end
- Mon, Aug 24, 2026 10:59 PM
- Duration
- 1 day 18 minutes 2 seconds
- Road
- M40 – M40 Southbound Between J11 And J10
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Aug 24, 2026 8:13 AM
- Last updated
- Mon, Aug 24, 2026 9:02 AM
- Cleared
- Mon, Aug 24, 2026 9:35 AM
- Latest update: M40 Southbound, Jct 11 to Jct 10, hard shoulder closure.
- Coordinates
- 52.010915, -1.278147
- Latitude span
- 52.008684 – 52.013975
- Longitude span
- -1.281687 – -1.275794
- Bounding box centre
- 52.011330, -1.278741
- Location descriptions
-
- M40 southbound between J11 and J10
- Feed validity status
- Active
- Overall feed start
- Sun, Aug 23, 2026 9:17 AM
- Overall feed end
- Mon, Aug 24, 2026 10:59 PM
- Feed window length
- 1 day 13 hours 42 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {AB58F95C-373D-40F4-9A33-CDE8DB29B79A}
- Linear Element Type
- B Carriageway
- From Distance
- 22 m
- To Distance
- 382 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.013975 -1.281687 52.011367 -1.278588
Segment 2
5 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {B5791E5F-8AF8-459B-9C00-C85B1FEE4799}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 354 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.011367 -1.278588 52.01123 -1.278424 52.010379 -1.277476 52.009402 -1.276472 52.008684 -1.275794
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.281687, 52.013975
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.281687,
52.013975
],
[
-1.278588,
52.011367
],
[
-1.278588,
52.011367
],
[
-1.278424,
52.01123
],
[
-1.277476,
52.010379
],
[
-1.276472,
52.009402
],
[
-1.275794,
52.008684
]
]
]
}
View road section coordinates
[
[
[
-1.281687,
52.013975
],
[
-1.278588,
52.011367
],
[
-1.278588,
52.011367
],
[
-1.278424,
52.01123
],
[
-1.277476,
52.010379
],
[
-1.276472,
52.009402
],
[
-1.275794,
52.008684
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Aug 24, 2026 8:13 AM
- Record versioned
- Mon, Aug 24, 2026 9:02 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 11 to Jct 10 hard shoulder closure
Planned Roadworks National HighwaysExpected to clear in 6 hours 3 minutes
M40 Southbound Jct 11 to Jct 10 hard shoulder closure
M40 Southbound, Jct 5 to Jct 4, hard shoulder closure.
Planned Roadworks National HighwaysExpected to clear in 8 hours 3 minutes
M40 Southbound, Jct 5 to Jct 4, hard shoulder closure.
M40 Southbound, Jct 9 to Jct 6 lane 3 closure
Planned Roadworks National HighwaysStarts in 11 hours 18 minutes
M40 Southbound, Jct 9 to Jct 6 lane 3 closure
M40 Northbound Jct 8a exit slip road closure
Planned Roadworks National HighwaysStarts in 11 hours 18 minutes
M40 Northbound Jct 8a exit slip road closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 10 hours 3 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and lane 2 closure
Planned Roadworks National HighwaysStarts in 10 hours 3 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and lane 2 closure