M40 Southbound, Jct 11 to Jct 10, hard shoulder closure.
PlannedM40 Southbound, Jct 11 to Jct 10, hard shoulder closure.
- Start time
- Sun, Aug 23, 2026 6:00 AM
- Expected end
- Mon, Aug 24, 2026 10:59 PM
- Duration
- 1 day 16 hours 59 minutes
- Road
- M40 – M40 Southbound Between J11 And J10
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 21, 2026 4:26 PM
- Last updated
- Sun, Aug 23, 2026 1:07 AM
- Cleared
- Mon, Aug 24, 2026 10:59 PM
- Latest update: M40 Southbound, Jct 11 to Jct 10, hard shoulder closure.
- Coordinates
- 52.010915, -1.278147
- Latitude span
- 52.008684 – 52.013975
- Longitude span
- -1.281687 – -1.275794
- Bounding box centre
- 52.011330, -1.278741
- Location descriptions
-
- M40 southbound between J11 and J10
- Feed validity status
- Planned
- Overall feed start
- Sun, Aug 23, 2026 6:00 AM
- Overall feed end
- Mon, Aug 24, 2026 10:59 PM
- Feed window length
- 1 day 16 hours 59 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {AB58F95C-373D-40F4-9A33-CDE8DB29B79A}
- Linear Element Type
- B Carriageway
- From Distance
- 22 m
- To Distance
- 382 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.013975 -1.281687 52.011367 -1.278588
Segment 2
5 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {B5791E5F-8AF8-459B-9C00-C85B1FEE4799}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 354 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.011367 -1.278588 52.01123 -1.278424 52.010379 -1.277476 52.009402 -1.276472 52.008684 -1.275794
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.281687, 52.013975
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.281687,
52.013975
],
[
-1.278588,
52.011367
],
[
-1.278588,
52.011367
],
[
-1.278424,
52.01123
],
[
-1.277476,
52.010379
],
[
-1.276472,
52.009402
],
[
-1.275794,
52.008684
]
]
]
}
View road section coordinates
[
[
[
-1.281687,
52.013975
],
[
-1.278588,
52.011367
],
[
-1.278588,
52.011367
],
[
-1.278424,
52.01123
],
[
-1.277476,
52.010379
],
[
-1.276472,
52.009402
],
[
-1.275794,
52.008684
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jul 21, 2026 4:26 PM
- Record versioned
- Sun, Aug 23, 2026 1:07 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure.
Planned Roadworks National HighwaysExpected to clear in 3 hours 42 minutes
M40 Southbound, Jct 11 to Jct 10, hard shoulder, lane 1 and 2 closure.
M40 Southbound, Jct 11 to Jct 10 hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysCleared 1 hour 17 minutes ago
M40 Southbound, Jct 11 to Jct 10 hard shoulder, lane 1 and 2 closure
M40 Southbound, Jct 5 to Jct 4 lane 1 closure
Cleared Roadworks National HighwaysCleared 1 hour 17 minutes ago
M40 Southbound, Jct 5 to Jct 4 lane 1 closure
M40 Westbound Jct 1a to M25 Clockwise and Anti-Clockwise Jct 16 Link Road Closure
Cleared Roadworks National HighwaysCleared 21 hours 12 minutes ago
M40 Westbound Jct 1a to M25 Clockwise and Anti-Clockwise Jct 16 Link Road Closure
M40 southbound Jct 10 entry slip road closure
Cleared Roadworks National HighwaysCleared 21 hours 27 minutes ago
M40 southbound Jct 10 entry slip road closure
M40 Southbound, Jct 16 to Jct 15, Lane 3 and 2 closure.
Cleared Roadworks National HighwaysCleared 21 hours 27 minutes ago
M40 Southbound, Jct 16 to Jct 15, Lane 3 and 2 closure.