M40 Southbound Jct 11 to Jct 10 hard shoulder closure
ClearedM40 Southbound Jct 11 to Jct 10 hard shoulder closure
- Start time
- Fri, May 1, 2026 6:00 AM
- Expected end
- Fri, May 1, 2026 10:59 PM
- Duration
- 16 hours 59 minutes
- Road
- M40 – M40 Southbound Between J11 And J10
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jan 21, 2026 5:22 PM
- Last updated
- Fri, May 1, 2026 4:28 PM
- Cleared
- Fri, May 1, 2026 10:59 PM
- Latest update: M40 Southbound Jct 11 to Jct 10 hard shoulder closure
- Coordinates
- 52.000197, -1.269859
- Latitude span
- 51.998615 – 52.001913
- Longitude span
- -1.270723 – -1.269140
- Bounding box centre
- 52.000264, -1.269932
- Location descriptions
-
- M40 southbound between J11 and J10
- Feed validity status
- Planned
- Overall feed start
- Fri, May 1, 2026 6:00 AM
- Overall feed end
- Fri, May 1, 2026 10:59 PM
- Feed window length
- 16 hours 59 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {69655B28-996A-4685-A037-A8AB12DE6250}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 173 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.000118 -1.269805 51.999478 -1.269495 51.998615 -1.26914
Segment 2
3 coordinate pairs- Description
- M40 southbound between J11 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {20E310D3-93A9-4AD8-9607-86F2A1D9EE57}
- Linear Element Type
- B Carriageway
- From Distance
- 728 m
- To Distance
- 937 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.001913 -1.270723 52.000938 -1.270185 52.000118 -1.269805
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -1.269805, 52.000118
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.269805,
52.000118
],
[
-1.269495,
51.999478
],
[
-1.26914,
51.998615
],
[
-1.270723,
52.001913
],
[
-1.270185,
52.000938
],
[
-1.269805,
52.000118
]
]
]
}
View road section coordinates
[
[
[
-1.269805,
52.000118
],
[
-1.269495,
51.999478
],
[
-1.26914,
51.998615
],
[
-1.270723,
52.001913
],
[
-1.270185,
52.000938
],
[
-1.269805,
52.000118
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jan 21, 2026 5:22 PM
- Record versioned
- Fri, May 1, 2026 4:28 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 11 to Jct 10 hard shoulder closure
Planned Roadworks National HighwaysExpected to clear in 1 day 16 hours
M40 Southbound Jct 11 to Jct 10 hard shoulder closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 16 hours 21 minutes
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 northbound Warwick services entry slip road closure
Planned Roadworks National HighwaysStarts in 14 hours 37 minutes
M40 northbound Warwick services entry slip road closure
M40 Southbound Jct 15 to Jct 11 lane 3 closure
Planned Roadworks National HighwaysStarts in 14 hours 37 minutes
M40 Southbound Jct 15 to Jct 11 lane 3 closure
M40 northbound Jct 10 entry slip road closure
Planned Roadworks National HighwaysStarts in 14 hours 37 minutes
M40 northbound Jct 10 entry slip road closure
M40 Southbound Jct 5, lane 3 and lane 2 closures
Planned Roadworks National HighwaysStarts in 14 hours 37 minutes
M40 Southbound Jct 5, lane 3 and lane 2 closures