M40 Southbound Jct 10 to Jct 9, hardshoulder closure
ClearedM40 Southbound Jct 10 to Jct 9, hardshoulder closure
- Start time
- Fri, Jul 24, 2026 7:00 AM
- Expected end
- Fri, Jul 24, 2026 4:00 PM
- Duration
- 1 hour 50 minutes 2 seconds
- Road
- M40 – M40 Southbound Between J10 And J9
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 20, 2026 1:27 PM
- Last updated
- Fri, Jul 24, 2026 8:32 AM
- Cleared
- Fri, Jul 24, 2026 8:50 AM
- Latest update: M40 Southbound Jct 10 to Jct 9, hardshoulder closure
- Coordinates
- 51.929277, -1.201798
- Latitude span
- 51.928602 – 51.931008
- Longitude span
- -1.201831 – -1.201715
- Bounding box centre
- 51.929805, -1.201773
- Location descriptions
-
- M40 southbound between J10 and J9
- Feed validity status
- Planned
- Overall feed start
- Fri, Jul 24, 2026 7:00 AM
- Overall feed end
- Fri, Jul 24, 2026 4:00 PM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M40 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {3845C451-118E-4BE1-B410-0A748C8AAE64}
- Linear Element Type
- B Carriageway
- From Distance
- 1,051 m
- To Distance
- 1,302 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.931008 -1.201715 51.929816 -1.201774 51.928753 -1.201822
Segment 2
3 coordinate pairs- Description
- M40 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E13C270-C586-435B-B084-A82D5D315F3F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 16 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.928753 -1.201822 51.928728 -1.201823 51.928602 -1.201831
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -1.201715, 51.931008
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.201715,
51.931008
],
[
-1.201774,
51.929816
],
[
-1.201822,
51.928753
],
[
-1.201822,
51.928753
],
[
-1.201823,
51.928728
],
[
-1.201831,
51.928602
]
]
]
}
View road section coordinates
[
[
[
-1.201715,
51.931008
],
[
-1.201774,
51.929816
],
[
-1.201822,
51.928753
],
[
-1.201822,
51.928753
],
[
-1.201823,
51.928728
],
[
-1.201831,
51.928602
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 20, 2026 1:27 PM
- Record versioned
- Fri, Jul 24, 2026 8:32 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 19 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
M40 Southbound Jct 14 to Jct 13 hardshoulder closure.
Planned Roadworks National HighwaysExpected to clear in 2 days 13 hours
M40 Southbound Jct 14 to Jct 13 hardshoulder closure.
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
Planned Roadworks National HighwaysExpected to clear in 1 day 13 hours
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
M40 southbound, Jct 7 to Jct 6, hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 13 hours 18 minutes
M40 southbound, Jct 7 to Jct 6, hard shoulder closure
M40 Southbound Jct 5 to Jct 4 lane 3 closure
Planned Roadworks National HighwaysStarts in 11 hours 34 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 11 hours 34 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure