M40 Southbound Jct 10 to Jct 9 hard shoulder closure
ClearedM40 Southbound Jct 10 to Jct 9 hard shoulder closure
- Start time
- Sun, Apr 26, 2026 9:02 AM
- Expected end
- Mon, Apr 27, 2026 10:59 PM
- Duration
- 1 day 13 hours 57 minutes
- Road
- M40 – M40 Southbound Between J10 And J9
- Category
- Road Maintenance
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sun, Apr 26, 2026 4:13 PM
- Last updated
- Mon, Apr 27, 2026 6:21 AM
- Cleared
- Mon, Apr 27, 2026 10:59 PM
- Latest update: M40 Southbound Jct 10 to Jct 9 hard shoulder closure
- Coordinates
- 51.930135, -1.201780
- Latitude span
- 51.928489 – 51.933479
- Longitude span
- -1.201838 – -1.201707
- Bounding box centre
- 51.930984, -1.201773
- Location descriptions
-
- M40 southbound between J10 and J9
- Feed validity status
- Active
- Overall feed start
- Sun, Apr 26, 2026 9:02 AM
- Overall feed end
- Mon, Apr 27, 2026 10:59 PM
- Feed window length
- 1 day 13 hours 57 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M40 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {3845C451-118E-4BE1-B410-0A748C8AAE64}
- Linear Element Type
- B Carriageway
- From Distance
- 776 m
- To Distance
- 1,302 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.933479 -1.201739 51.931883 -1.201716 51.931182 -1.201707 51.929816 -1.201774 51.928753 -1.201822
Segment 2
3 coordinate pairs- Description
- M40 southbound between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E13C270-C586-435B-B084-A82D5D315F3F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 29 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.928753 -1.201822 51.928728 -1.201823 51.928489 -1.201838
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.201739, 51.933479
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.201739,
51.933479
],
[
-1.201716,
51.931883
],
[
-1.201707,
51.931182
],
[
-1.201774,
51.929816
],
[
-1.201822,
51.928753
],
[
-1.201822,
51.928753
],
[
-1.201823,
51.928728
],
[
-1.201838,
51.928489
]
]
]
}
View road section coordinates
[
[
[
-1.201739,
51.933479
],
[
-1.201716,
51.931883
],
[
-1.201707,
51.931182
],
[
-1.201774,
51.929816
],
[
-1.201822,
51.928753
],
[
-1.201822,
51.928753
],
[
-1.201823,
51.928728
],
[
-1.201838,
51.928489
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sun, Apr 26, 2026 4:13 PM
- Record versioned
- Mon, Apr 27, 2026 6:21 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 14 hours 56 minutes
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 northbound Warwick services entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 12 minutes
M40 northbound Warwick services entry slip road closure
M40 Southbound Jct 15 to Jct 11 lane 3 closure
Planned Roadworks National HighwaysStarts in 13 hours 12 minutes
M40 Southbound Jct 15 to Jct 11 lane 3 closure
M40 northbound Jct 10 entry slip road closure
Planned Roadworks National HighwaysStarts in 13 hours 12 minutes
M40 northbound Jct 10 entry slip road closure
M40 Southbound Jct 5, lane 3 and lane 2 closures
Planned Roadworks National HighwaysStarts in 13 hours 12 minutes
M40 Southbound Jct 5, lane 3 and lane 2 closures
M40 Southbound Jct 4 to Jct 2 lane 3 closure
Planned Roadworks National HighwaysStarts in 13 hours 12 minutes
M40 Southbound Jct 4 to Jct 2 lane 3 closure