M40 Northbound, Warwick Services exit slip road closure.

Planned

M40 Northbound, Warwick Services exit slip road closure.

Start time
Fri, Jun 5, 2026 9:15 PM
Expected end
Sat, Jun 6, 2026 5:00 AM
Duration
7 hours 45 minutes
Road
M40 – M40 Northbound At The Warwick Services Between J12 And J13
Category
Road Maintenance
Direction
Northbound
Carriageway
Dual Carriageway
Reason
Repair Work
Active
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Dec 19, 2025 10:59 AM
Last updated
Fri, Jun 5, 2026 10:02 PM
Cleared
Sat, Jun 6, 2026 5:00 AM
  • Latest update: M40 Northbound, Warwick Services exit slip road closure.
Coordinates
52.215995, -1.498654
Latitude span
52.215369 – 52.216493
Longitude span
-1.500422 – -1.496635
Bounding box centre
52.215931, -1.498529
Location descriptions
  • M40 northbound at the Warwick services between J12 and J13
  • M40 northbound at the Warwick services slip road between J12 and J13
Feed validity status
Planned
Overall feed start
Fri, Jun 5, 2026 9:15 PM
Overall feed end
Sat, Jun 6, 2026 5:00 AM
Feed window length
7 hours 45 minutes
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
carriagewayClosures (Carriageway Closures)
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
M40 northbound at the Warwick services between J12 and J13
Carriageway
Dual Carriageway
Lanes Restricted
4 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
North Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M40
Linear Element Model
The Network Model
Linear Element Id
{E401B5B9-EAF4-463E-9D3D-1C76703E1F08}
Linear Element Type
A Carriageway
From Distance
21 m
To Distance
105 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.215369 -1.496635
52.215737 -1.4977

Segment 2

4 coordinate pairs
Description
M40 northbound at the Warwick services slip road between J12 and J13
Lanes Restricted
2 lanes restricted
Operational Lanes
0 operational lanes
Direction On Section
North Bound
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M40
Linear Element Model
The Network Model
Linear Element Id
{53502FB6-F488-82CB-EAF6-6AF7FC472A3B}
Linear Element Type
A Carriageway Exit Slip
From Distance
0 m
To Distance
204 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
52.215737 -1.4977
52.216173 -1.49926
52.21646 -1.500209
52.216493 -1.500422
Geometry type
MultiLineString
Geometry points
6
First coordinate pair
-1.496635, 52.215369
Road section segments
1
Road section points
6
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -1.496635,
                52.215369
            ],
            [
                -1.4977,
                52.215737
            ],
            [
                -1.4977,
                52.215737
            ],
            [
                -1.49926,
                52.216173
            ],
            [
                -1.500209,
                52.21646
            ],
            [
                -1.500422,
                52.216493
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -1.496635,
            52.215369
        ],
        [
            -1.4977,
            52.215737
        ],
        [
            -1.4977,
            52.215737
        ],
        [
            -1.49926,
            52.216173
        ],
        [
            -1.500209,
            52.21646
        ],
        [
            -1.500422,
            52.216493
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Repair Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Carriageway Closures
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Fri, Dec 19, 2025 10:59 AM
Record versioned
Fri, Jun 5, 2026 10:02 PM
Coordinate source
Geometry

Related incidents

M40 Northbound Jct 8a to Jct 10 lane 3 closure.

Planned National Highways
Bicester M40 · M40 Northbound Between J8A And J9
Starts 6 Jun 2026, 21:15 Expected 7 Jun 2026, 05:00

M40 Northbound Jct 8a to Jct 10 lane 3 closure.

Category: Road Maintenance
View update

M40 Southbound Jct 1A to Jct 1 lane 3 closure

Planned National Highways
South Bucks M40 · M40 Southbound Within J1A After M25 J16 Clockwise Access
Starts 6 Jun 2026, 21:15 Expected 7 Jun 2026, 05:00

M40 Southbound Jct 1A to Jct 1 lane 3 closure

Category: Road Maintenance
View update

M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.

Planned National Highways
Bicester M40 · M40 Southbound Within J11
Starts 6 Jun 2026, 20:00 Expected 7 Jun 2026, 05:00

M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.

Category: Road Maintenance
View update

Lane 2 and 3 closure southbound

Planned National Highways
Royal Leamington Spa M40 · M40 Southbound Between J16 And J15
Starts 6 Jun 2026, 20:00 Expected 7 Jun 2026, 05:00

Lane 2 and 3 closure southbound

Category: Road Maintenance
View update

M40 Southbound, Jct 4 to Jct 3, hard shoulder, lane 1 and 2 closure.

Planned National Highways
Chiltern M40 · M40 Southbound Between J4 And J3
Starts 6 Jun 2026, 19:00 Expected 7 Jun 2026, 05:00

M40 Southbound, Jct 4 to Jct 3, hard shoulder, lane 1 and 2 closure.

Category: Road Maintenance
View update

M40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure

Planned National Highways
Bicester M40 · M40 Southbound Within J10
Starts 6 Jun 2026, 20:00 Expected 7 Jun 2026, 05:00

M40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure

Category: Construction Work
View update