M40 northbound Warwick services entry slip road closure
ClearedM40 northbound Warwick services entry slip road closure
- Start time
- Wed, Jun 10, 2026 9:15 PM
- Expected end
- Thu, Jun 11, 2026 5:00 AM
- Duration
- 2 hours 45 minutes 2 seconds
- Road
- M40 – M40 Northbound At The Warwick Services Between J12 And J13
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jun 25, 2025 6:28 AM
- Last updated
- Wed, Jun 10, 2026 11:31 PM
- Cleared
- Thu, Jun 11, 2026 12:00 AM
- Latest update: M40 northbound Warwick services entry slip road closure
- Coordinates
- 52.215995, -1.498654
- Latitude span
- 52.215369 – 52.216493
- Longitude span
- -1.500422 – -1.496635
- Bounding box centre
- 52.215931, -1.498529
- Location descriptions
-
- M40 northbound at the Warwick services between J12 and J13
- M40 northbound at the Warwick services slip road between J12 and J13
- Feed validity status
- Planned
- Overall feed start
- Wed, Jun 10, 2026 9:15 PM
- Overall feed end
- Thu, Jun 11, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M40 northbound at the Warwick services between J12 and J13
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {E401B5B9-EAF4-463E-9D3D-1C76703E1F08}
- Linear Element Type
- A Carriageway
- From Distance
- 21 m
- To Distance
- 105 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.215369 -1.496635 52.215737 -1.4977
Segment 2
4 coordinate pairs- Description
- M40 northbound at the Warwick services slip road between J12 and J13
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {53502FB6-F488-82CB-EAF6-6AF7FC472A3B}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 204 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.215737 -1.4977 52.216173 -1.49926 52.21646 -1.500209 52.216493 -1.500422
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -1.496635, 52.215369
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.496635,
52.215369
],
[
-1.4977,
52.215737
],
[
-1.4977,
52.215737
],
[
-1.49926,
52.216173
],
[
-1.500209,
52.21646
],
[
-1.500422,
52.216493
]
]
]
}
View road section coordinates
[
[
[
-1.496635,
52.215369
],
[
-1.4977,
52.215737
],
[
-1.4977,
52.215737
],
[
-1.49926,
52.216173
],
[
-1.500209,
52.21646
],
[
-1.500422,
52.216493
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Jun 25, 2025 6:28 AM
- Record versioned
- Wed, Jun 10, 2026 11:31 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
A404 Northbound entry slip road closure
Planned Roadworks National HighwaysStarts in 5 hours 37 minutes
A404 Northbound entry slip road closure
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
Planned Roadworks National HighwaysStarts in 4 hours 22 minutes
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 4 hours 22 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Cleared Roadworks National HighwaysCleared 10 hours 37 minutes ago
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and lane 2 closure
Cleared Roadworks National HighwaysCleared 12 hours 7 minutes ago
M40 Southbound Jct 5 to Jct 4 lane 3 and lane 2 closure
M40 Southbound, Jct 12 to Jct 11, lane 3 and 2 closure.
Cleared Roadworks National HighwaysCleared 15 hours 52 minutes ago
M40 Southbound, Jct 12 to Jct 11, lane 3 and 2 closure.