M40 Northbound, Warwick Services Entry Slip Closure
ClearedM40 Northbound, Warwick Services Entry Slip Closure
- Start time
- Fri, May 15, 2026 7:00 PM
- Expected end
- Sat, May 16, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M40 – M40 Northbound At The Warwick Services Slip Road Between J12 And J13
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sun, Sep 28, 2025 2:43 PM
- Last updated
- Fri, May 15, 2026 9:08 PM
- Cleared
- Sat, May 16, 2026 5:00 AM
- Latest update: M40 Northbound, Warwick Services Entry Slip Closure
- Coordinates
- 52.216015, -1.498712
- Latitude span
- 52.215494 – 52.216490
- Longitude span
- -1.500404 – -1.496999
- Bounding box centre
- 52.215992, -1.498702
- Location descriptions
-
- M40 northbound at the Warwick services slip road between J12 and J13
- M40 northbound at the Warwick services between J12 and J13
- Feed validity status
- Planned
- Overall feed start
- Fri, May 15, 2026 7:00 PM
- Overall feed end
- Sat, May 16, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 northbound at the Warwick services slip road between J12 and J13
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {53502FB6-F488-82CB-EAF6-6AF7FC472A3B}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 203 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.215737 -1.4977 52.216173 -1.49926 52.21646 -1.500209 52.21649 -1.500404
Segment 2
2 coordinate pairs- Description
- M40 northbound at the Warwick services between J12 and J13
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {E401B5B9-EAF4-463E-9D3D-1C76703E1F08}
- Linear Element Type
- A Carriageway
- From Distance
- 50 m
- To Distance
- 105 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.215494 -1.496999 52.215737 -1.4977
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -1.497700, 52.215737
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.4977,
52.215737
],
[
-1.49926,
52.216173
],
[
-1.500209,
52.21646
],
[
-1.500404,
52.21649
],
[
-1.496999,
52.215494
],
[
-1.4977,
52.215737
]
]
]
}
View road section coordinates
[
[
[
-1.4977,
52.215737
],
[
-1.49926,
52.216173
],
[
-1.500209,
52.21646
],
[
-1.500404,
52.21649
],
[
-1.496999,
52.215494
],
[
-1.4977,
52.215737
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sun, Sep 28, 2025 2:43 PM
- Record versioned
- Fri, May 15, 2026 9:08 PM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
Planned Roadworks National HighwaysExpected to clear in 5 hours 17 minutes
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
Planned Roadworks National HighwaysExpected to clear in 5 hours 17 minutes
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
M40 Northbound Jct 11 exit slip road lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 5 hours 17 minutes
M40 Northbound Jct 11 exit slip road lane 1 closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 23 hours 16 minutes
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 5 hours 17 minutes
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Cleared Roadworks National HighwaysCleared 11 hours 42 minutes ago
M40 Northbound Jct 6 to Jct 7 hard shoulder closure