M40 Northbound, Jct 9 to Jct 10 Hard shoulder closure
ClearedM40 Northbound, Jct 9 to Jct 10 Hard shoulder closure
- Start time
- Wed, Oct 29, 2025 8:40 PM
- Expected end
- Fri, Oct 31, 2025 11:59 PM
- Duration
- 2 days 3 hours 19 minutes
- Road
- M40 – M40 Northbound Between J9 And J10
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 30, 2025 10:09 AM
- Last updated
- Fri, Oct 31, 2025 5:30 AM
- Cleared
- Fri, Oct 31, 2025 11:59 PM
- Latest update: M40 Northbound, Jct 9 to Jct 10 Hard shoulder closure
- Coordinates
- 51.928935, -1.202075
- Latitude span
- 51.926682 – 51.931010
- Longitude span
- -1.202210 – -1.201976
- Bounding box centre
- 51.928846, -1.202093
- Location descriptions
-
- M40 northbound between J9 and J10
- Feed validity status
- Active
- Overall feed start
- Wed, Oct 29, 2025 8:40 PM
- Overall feed end
- Fri, Oct 31, 2025 11:59 PM
- Feed window length
- 2 days 3 hours 19 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M40 northbound between J9 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {8469FB31-7D5A-48CF-8C01-5852FD4E11F5}
- Linear Element Type
- A Carriageway
- From Distance
- 1,003 m
- To Distance
- 1,250 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.926682 -1.20221 51.927435 -1.202151 51.928902 -1.202071
Segment 2
4 coordinate pairs- Description
- M40 northbound between J9 and J10
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {570C6579-79A5-443A-BAB0-E31788E728DB}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 234 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.928902 -1.202071 51.929799 -1.202022 51.929817 -1.202022 51.93101 -1.201976
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.202210, 51.926682
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.20221,
51.926682
],
[
-1.202151,
51.927435
],
[
-1.202071,
51.928902
],
[
-1.202071,
51.928902
],
[
-1.202022,
51.929799
],
[
-1.202022,
51.929817
],
[
-1.201976,
51.93101
]
]
]
}
View road section coordinates
[
[
[
-1.20221,
51.926682
],
[
-1.202151,
51.927435
],
[
-1.202071,
51.928902
],
[
-1.202071,
51.928902
],
[
-1.202022,
51.929799
],
[
-1.202022,
51.929817
],
[
-1.201976,
51.93101
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Oct 30, 2025 10:09 AM
- Record versioned
- Fri, Oct 31, 2025 5:30 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 1 day 8 hours
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
Planned Roadworks National HighwaysStarts in 5 hours 31 minutes
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
Planned Roadworks National HighwaysStarts in 5 hours 31 minutes
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 14 hours 31 minutes
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
M40 Northbound Jct 11 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 4 hours 1 minute
M40 Northbound Jct 11 exit slip road lane 1 closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Cleared Roadworks National HighwaysCleared 2 hours 28 minutes ago
M40 Northbound Jct 6 to Jct 7 hard shoulder closure