M40 Northbound Jct 8a exit slip road closure
PlannedM40 Northbound Jct 8a exit slip road closure
- Start time
- Tue, Aug 25, 2026 9:15 PM
- Expected end
- Wed, Aug 26, 2026 5:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M40 – M40 J8 Northbound Exit
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Jan 8, 2026 1:13 PM
- Last updated
- Tue, Aug 25, 2026 2:25 AM
- Cleared
- Wed, Aug 26, 2026 5:00 AM
- Latest update: M40 Northbound Jct 8a exit slip road closure
- Coordinates
- 51.739384, -1.105175
- Latitude span
- 51.738107 – 51.739908
- Longitude span
- -1.106725 – -1.102574
- Bounding box centre
- 51.739008, -1.104650
- Location descriptions
-
- M40 J8 northbound exit
- M40 westbound exit at J8
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 25, 2026 9:15 PM
- Overall feed end
- Wed, Aug 26, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M40 J8 northbound exit
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {E7B462CB-F600-4E92-BF16-C38378D1DF24}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 1,950 m
- To Distance
- 2,230 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.738107 -1.102574 51.738545 -1.103496 51.738616 -1.103624 51.739238 -1.104756 51.73942 -1.1051 51.739648 -1.105487 51.739739 -1.105659
Segment 2
5 coordinate pairs- Description
- M40 westbound exit at J8
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {173C6999-29FF-43C4-A706-767671F667E1}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 78 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.739739 -1.105659 51.739872 -1.106117 51.739908 -1.106357 51.739907 -1.10654 51.739863 -1.106725
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -1.102574, 51.738107
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.102574,
51.738107
],
[
-1.103496,
51.738545
],
[
-1.103624,
51.738616
],
[
-1.104756,
51.739238
],
[
-1.1051,
51.73942
],
[
-1.105487,
51.739648
],
[
-1.105659,
51.739739
],
[
-1.105659,
51.739739
],
[
-1.106117,
51.739872
],
[
-1.106357,
51.739908
],
[
-1.10654,
51.739907
],
[
-1.106725,
51.739863
]
]
]
}
View road section coordinates
[
[
[
-1.102574,
51.738107
],
[
-1.103496,
51.738545
],
[
-1.103624,
51.738616
],
[
-1.104756,
51.739238
],
[
-1.1051,
51.73942
],
[
-1.105487,
51.739648
],
[
-1.105659,
51.739739
],
[
-1.105659,
51.739739
],
[
-1.106117,
51.739872
],
[
-1.106357,
51.739908
],
[
-1.10654,
51.739907
],
[
-1.106725,
51.739863
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Jan 8, 2026 1:13 PM
- Record versioned
- Tue, Aug 25, 2026 2:25 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound Jct 12 to Jct 11 lane 3 closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 51 minutes
M40 Southbound Jct 12 to Jct 11 lane 3 closure
M40 northbound, Jct 11 entry slip road, lane 1 closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 51 minutes
M40 northbound, Jct 11 entry slip road, lane 1 closure
M40 Southbound, Jct 9 to Jct 6 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 18 hours 6 minutes
M40 Southbound, Jct 9 to Jct 6 lane 3 and 2 closure
M40 Eastbound Jct 2 to Jct 1 lane closure
Planned Roadworks National HighwaysStarts in 17 hours 51 minutes
M40 Eastbound Jct 2 to Jct 1 lane closure
M40 Southbound Jct 12 to Jct 11 lane 3 closure
Planned Roadworks National HighwaysStarts in 16 hours 51 minutes
M40 Southbound Jct 12 to Jct 11 lane 3 closure
M40 northbound, Jct 11 entry slip road, lane 1 closure
Planned Roadworks National HighwaysStarts in 15 hours 51 minutes
M40 northbound, Jct 11 entry slip road, lane 1 closure