M40 Northbound Jct 6 to Jct 7, hardshoulder closure
PlannedM40 Northbound Jct 6 to Jct 7, hardshoulder closure
- Start time
- Mon, Apr 6, 2026 6:00 AM
- Expected end
- Tue, Apr 7, 2026 10:59 PM
- Duration
- 1 day 16 hours 59 minutes
- Road
- M40 – M40 Northbound Between J6 And J7
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jan 21, 2026 4:54 PM
- Last updated
- Tue, Apr 7, 2026 10:43 PM
- Cleared
- Tue, Apr 7, 2026 10:59 PM
- Latest update: M40 Northbound Jct 6 to Jct 7, hardshoulder closure
- Coordinates
- 51.720162, -1.036802
- Latitude span
- 51.719531 – 51.720871
- Longitude span
- -1.040202 – -1.034197
- Bounding box centre
- 51.720201, -1.037200
- Location descriptions
-
- M40 northbound between J6 and J7
- Feed validity status
- Planned
- Overall feed start
- Mon, Apr 6, 2026 6:00 AM
- Overall feed end
- Tue, Apr 7, 2026 10:59 PM
- Feed window length
- 1 day 16 hours 59 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M40 northbound between J6 and J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {6944CBD4-7AAF-4D27-BF9F-23E3108D0158}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 273 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.720113 -1.036443 51.720396 -1.037748 51.72059 -1.038685 51.720871 -1.040202
Segment 2
4 coordinate pairs- Description
- M40 northbound between J6 and J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {5331831B-AA47-4128-84C4-F1CAB03C33D4}
- Linear Element Type
- A Carriageway
- From Distance
- 1,177 m
- To Distance
- 1,345 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.719531 -1.034197 51.719683 -1.034745 51.720001 -1.035953 51.720113 -1.036443
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.036443, 51.720113
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.036443,
51.720113
],
[
-1.037748,
51.720396
],
[
-1.038685,
51.72059
],
[
-1.040202,
51.720871
],
[
-1.034197,
51.719531
],
[
-1.034745,
51.719683
],
[
-1.035953,
51.720001
],
[
-1.036443,
51.720113
]
]
]
}
View road section coordinates
[
[
[
-1.036443,
51.720113
],
[
-1.037748,
51.720396
],
[
-1.038685,
51.72059
],
[
-1.040202,
51.720871
],
[
-1.034197,
51.719531
],
[
-1.034745,
51.719683
],
[
-1.035953,
51.720001
],
[
-1.036443,
51.720113
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Jan 21, 2026 4:54 PM
- Record versioned
- Tue, Apr 7, 2026 10:43 PM
- Coordinate source
- Geometry
Related incidents
M40 Northbound Jct 8a to Jct 10 lane 3 closure.
Planned National HighwaysM40 Northbound Jct 8a to Jct 10 lane 3 closure.
M40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure
Planned National HighwaysM40 southbound, Jct 12 to Jct 10, lane 3 and 2 closure
M40 Southbound Jct 7 to Jct 5 lane 3 and lane 2 closures
Planned National HighwaysM40 Southbound Jct 7 to Jct 5 lane 3 and lane 2 closures
M40 southbound, Jct 11 to Jct 10, lane 3 and 2 closure
Planned National HighwaysM40 southbound, Jct 11 to Jct 10, lane 3 and 2 closure
Lanes 2 and 3 closure southbound
Planned National HighwaysLanes 2 and 3 closure southbound
M40 Northbound Jct 4 to Jct 5 hard shoulder closure
Planned National HighwaysM40 Northbound Jct 4 to Jct 5 hard shoulder closure