M40 northbound, Jct 11 entry slip road, lane 1 closure
ClearedM40 northbound, Jct 11 entry slip road, lane 1 closure
- Start time
- Sat, Jul 18, 2026 7:00 PM
- Expected end
- Sun, Jul 19, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M40 – M40 J11 Northbound Access
- Category
- Road Maintenance
- Direction
- Northbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected, 1 of 3 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Jul 8, 2026 9:51 AM
- Last updated
- Sun, Jul 19, 2026 4:35 AM
- Cleared
- Sun, Jul 19, 2026 5:00 AM
- Latest update: M40 northbound, Jct 11 entry slip road, lane 1 closure
- Coordinates
- 52.076597, -1.317004
- Latitude span
- 52.072877 – 52.081583
- Longitude span
- -1.321902 – -1.314512
- Bounding box centre
- 52.077230, -1.318207
- Location descriptions
-
- M40 J11 northbound access
- M40 northbound between J11 and J12
- Feed validity status
- Planned
- Overall feed start
- Sat, Jul 18, 2026 7:00 PM
- Overall feed end
- Sun, Jul 19, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
12 coordinate pairs- Description
- M40 J11 northbound access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {938AF257-8ACB-4C57-916A-2F55207A8F6F}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 441 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.073372 -1.314513 52.073383 -1.314513 52.073437 -1.314512 52.073527 -1.314525 52.073563 -1.314539 52.073753 -1.314639 52.074385 -1.315067 52.074728 -1.31528 52.075278 -1.315637 52.075811 -1.315979 52.076785 -1.31665 52.077074 -1.316791
Segment 2
4 coordinate pairs- Description
- M40 J11 northbound access
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {731CDC82-1F7C-409F-8585-7189C6A5F03E}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 3 m
- To Distance
- 60 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.072877 -1.314711 52.073258 -1.314535 52.073319 -1.314516 52.073372 -1.314513
Segment 3
13 coordinate pairs- Description
- M40 northbound between J11 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {65F235D7-33B3-44C7-9E44-EE1A6351AA10}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 612 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
52.077074 -1.316791 52.077363 -1.317078 52.077662 -1.317351 52.078349 -1.318026 52.07853 -1.318213 52.079054 -1.318775 52.079452 -1.319221 52.07967 -1.319466 52.080621 -1.320633 52.081198 -1.321383 52.081309 -1.321527 52.081527 -1.321824 52.081583 -1.321902
- Geometry type
- MultiLineString
- Geometry points
- 29
- First coordinate pair
- -1.314513, 52.073372
- Road section segments
- 1
- Road section points
- 29
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.314513,
52.073372
],
[
-1.314513,
52.073383
],
[
-1.314512,
52.073437
],
[
-1.314525,
52.073527
],
[
-1.314539,
52.073563
],
[
-1.314639,
52.073753
],
[
-1.315067,
52.074385
],
[
-1.31528,
52.074728
],
[
-1.315637,
52.075278
],
[
-1.315979,
52.075811
],
[
-1.31665,
52.076785
],
[
-1.316791,
52.077074
],
[
-1.314711,
52.072877
],
[
-1.314535,
52.073258
],
[
-1.314516,
52.073319
],
[
-1.314513,
52.073372
],
[
-1.316791,
52.077074
],
[
-1.317078,
52.077363
],
[
-1.317351,
52.077662
],
[
-1.318026,
52.078349
],
[
-1.318213,
52.07853
],
[
-1.318775,
52.079054
],
[
-1.319221,
52.079452
],
[
-1.319466,
52.07967
],
[
-1.320633,
52.080621
],
[
-1.321383,
52.081198
],
[
-1.321527,
52.081309
],
[
-1.321824,
52.081527
],
[
-1.321902,
52.081583
]
]
]
}
View road section coordinates
[
[
[
-1.314513,
52.073372
],
[
-1.314513,
52.073383
],
[
-1.314512,
52.073437
],
[
-1.314525,
52.073527
],
[
-1.314539,
52.073563
],
[
-1.314639,
52.073753
],
[
-1.315067,
52.074385
],
[
-1.31528,
52.074728
],
[
-1.315637,
52.075278
],
[
-1.315979,
52.075811
],
[
-1.31665,
52.076785
],
[
-1.316791,
52.077074
],
[
-1.314711,
52.072877
],
[
-1.314535,
52.073258
],
[
-1.314516,
52.073319
],
[
-1.314513,
52.073372
],
[
-1.316791,
52.077074
],
[
-1.317078,
52.077363
],
[
-1.317351,
52.077662
],
[
-1.318026,
52.078349
],
[
-1.318213,
52.07853
],
[
-1.318775,
52.079054
],
[
-1.319221,
52.079452
],
[
-1.319466,
52.07967
],
[
-1.320633,
52.080621
],
[
-1.321383,
52.081198
],
[
-1.321527,
52.081309
],
[
-1.321824,
52.081527
],
[
-1.321902,
52.081583
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Jul 8, 2026 9:51 AM
- Record versioned
- Sun, Jul 19, 2026 4:35 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Southbound, Jct 8a exit slip road lane one closure
Planned Roadworks National HighwaysExpected to clear in 8 hours 3 minutes
M40 Southbound, Jct 8a exit slip road lane one closure
M40 Southbound Jct 14 to Jct 13 hardshoulder closure.
Planned Roadworks National HighwaysExpected to clear in 2 days 13 hours
M40 Southbound Jct 14 to Jct 13 hardshoulder closure.
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
Planned Roadworks National HighwaysExpected to clear in 1 day 13 hours
M40 Southbound, Jct 9 to Jct 8a, hard shoulder closure.
M40 southbound, Jct 7 to Jct 6, hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 13 hours 2 minutes
M40 southbound, Jct 7 to Jct 6, hard shoulder closure
M40 Southbound Jct 5 to Jct 4 lane 3 closure
Planned Roadworks National HighwaysStarts in 11 hours 18 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 closure
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure
Planned Roadworks National HighwaysStarts in 11 hours 18 minutes
M40 Southbound Jct 5 to Jct 4 lane 3 and 2 closure