M40 Eastbound Jct 1A Exit slip road Lane 1 closure
ClearedM40 Eastbound Jct 1A Exit slip road Lane 1 closure
- Start time
- Mon, Nov 3, 2025 10:00 PM
- Expected end
- Tue, Nov 4, 2025 5:30 AM
- Duration
- 7 hours 30 minutes
- Road
- M40 – Link Road From M40 J1A Southbound To M25 J16
- Category
- Road Maintenance
- Direction
- Southbound
- Lanes affected
- 1 of 2 lanes affected, 1 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Nov 3, 2025 9:56 PM
- Last updated
- Tue, Nov 4, 2025 4:14 AM
- Cleared
- Tue, Nov 4, 2025 5:30 AM
- Latest update: M40 Eastbound Jct 1A Exit slip road Lane 1 closure
- Coordinates
- 51.562603, -0.540979
- Latitude span
- 51.562575 – 51.562629
- Longitude span
- -0.542224 – -0.540249
- Bounding box centre
- 51.562602, -0.541237
- Location descriptions
-
- link road from M40 J1A southbound to M25 J16
- link road from M40 J1A southbound to M25 J16 clockwise
- Feed validity status
- Active
- Overall feed start
- Mon, Nov 3, 2025 10:00 PM
- Overall feed end
- Tue, Nov 4, 2025 5:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- link road from M40 J1A southbound to M25 J16
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {AAABB295-C159-4347-BC57-EA229FD540BD}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 154 m
- To Distance
- 281 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.562576 -0.542224 51.562575 -0.541956 51.562598 -0.541003 51.562599 -0.54096 51.562613 -0.540642 51.562616 -0.540397
Segment 2
2 coordinate pairs- Description
- link road from M40 J1A southbound to M25 J16 clockwise
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M40
- Linear Element Model
- The Network Model
- Linear Element Id
- {F6B850E4-6C4F-4F87-8DC2-F27FD6043D66}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 10 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.562616 -0.540397 51.562629 -0.540249
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -0.542224, 51.562576
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.542224,
51.562576
],
[
-0.541956,
51.562575
],
[
-0.541003,
51.562598
],
[
-0.54096,
51.562599
],
[
-0.540642,
51.562613
],
[
-0.540397,
51.562616
],
[
-0.540397,
51.562616
],
[
-0.540249,
51.562629
]
]
]
}
View road section coordinates
[
[
[
-0.542224,
51.562576
],
[
-0.541956,
51.562575
],
[
-0.541003,
51.562598
],
[
-0.54096,
51.562599
],
[
-0.540642,
51.562613
],
[
-0.540397,
51.562616
],
[
-0.540397,
51.562616
],
[
-0.540249,
51.562629
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Nov 3, 2025 9:56 PM
- Record versioned
- Tue, Nov 4, 2025 4:14 AM
- Coordinate source
- Geometry
Driving on the M40? See every live closure, roadwork and planned restriction on this road.
M40 live closuresRelated incidents
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Active Roadworks National HighwaysExpected to clear in 1 day 6 hours
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
Planned Roadworks National HighwaysStarts in 3 hours 39 minutes
M40 Southbound Jct 6 to Jct 4 lane 2 and 3 closure
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
Planned Roadworks National HighwaysStarts in 3 hours 39 minutes
M40 Southbound Jct 12 to Jct 10 lane 1 and lane 2 closures.
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
Cleared Roadworks National HighwaysExpected to clear in 12 hours 39 minutes
M40 Southbound Jct 2 to Jct 1a hard shoulder, lane 1 and 2 closure
M40 Northbound Jct 11 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 2 hours 9 minutes
M40 Northbound Jct 11 exit slip road lane 1 closure
M40 Northbound Jct 6 to Jct 7 hard shoulder closure
Cleared Roadworks National HighwaysCleared 4 hours 20 minutes ago
M40 Northbound Jct 6 to Jct 7 hard shoulder closure