M4 southbound Jct 7 lane closure on Huntcombe Spur
PlannedM4 southbound Jct 7 lane closure on Huntcombe Spur
- Start time
- Mon, Aug 17, 2026 8:00 PM
- Expected end
- Tue, Aug 18, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M4 – Link Road From A4 To M4 J7
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Mar 5, 2026 3:48 PM
- Last updated
- Mon, Aug 17, 2026 4:00 AM
- Cleared
- Tue, Aug 18, 2026 5:00 AM
- Latest update: M4 southbound Jct 7 lane closure on Huntcombe Spur
- Coordinates
- 51.517304, -0.654462
- Latitude span
- 51.516727 – 51.518278
- Longitude span
- -0.654525 – -0.654425
- Bounding box centre
- 51.517503, -0.654475
- Location descriptions
-
- link road from A4 to M4 J7
- Feed validity status
- Planned
- Overall feed start
- Mon, Aug 17, 2026 8:00 PM
- Overall feed end
- Tue, Aug 18, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- link road from A4 to M4 J7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {ECA8589A-42C0-4F3C-A9A7-F528C6E7F85D}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 96 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.517594 -0.654481 51.516891 -0.654436 51.516738 -0.654426 51.516727 -0.654425
Segment 2
2 coordinate pairs- Description
- link road from A4 to M4 J7
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {6E3938D7-C8E7-4122-9B68-2906EFEA9ED4}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 184 m
- To Distance
- 261 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.518278 -0.654525 51.517594 -0.654481
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -0.654481, 51.517594
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.654481,
51.517594
],
[
-0.654436,
51.516891
],
[
-0.654426,
51.516738
],
[
-0.654425,
51.516727
],
[
-0.654525,
51.518278
],
[
-0.654481,
51.517594
]
]
]
}
View road section coordinates
[
[
[
-0.654481,
51.517594
],
[
-0.654436,
51.516891
],
[
-0.654426,
51.516738
],
[
-0.654425,
51.516727
],
[
-0.654525,
51.518278
],
[
-0.654481,
51.517594
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Mar 5, 2026 3:48 PM
- Record versioned
- Mon, Aug 17, 2026 4:00 AM
- Coordinate source
- Geometry
Driving on the M4? See every live closure, roadwork and planned restriction on this road.
M4 live closuresRelated incidents
M25 Clockwise Jct 15 to Jct 16 and M4 Eastbound and westbound link road closure to M25 Anti-clockwise
Planned Roadworks National HighwaysStarts in 11 hours 15 minutes
M25 Clockwise Jct 15 to Jct 16 and M4 Eastbound and westbound link road closure to M25 Anti-clockwise
M4 Eastbound Jct 5 to Jct 4B Lane 1 closure
Planned Roadworks National HighwaysStarts in 11 hours 15 minutes
M4 Eastbound Jct 5 to Jct 4B Lane 1 closure
M4 eastbound Jct 7 entry slip road closure
Planned Roadworks National HighwaysStarts in 10 hours 15 minutes
M4 eastbound Jct 7 entry slip road closure
M4 eastbound Jct 21 to 20 - lane closures
Planned Roadworks National HighwaysStarts in 10 hours 15 minutes
M4 eastbound Jct 21 to 20 - lane closures
M4 eastbound lane 3 and 2 closure (82/7 to 80/1)
Planned Roadworks National HighwaysStarts in 9 hours 15 minutes
M4 eastbound lane 3 and 2 closure (82/7 to 80/1)
Single lane running
Planned Roadworks National HighwaysStarts in 9 hours 15 minutes
single lane running