M4 Jct 7 southbound Huntercoombe Spur lane 1 closure
ActiveM4 Jct 7 southbound Huntercoombe Spur lane 1 closure
- Start time
- Mon, Oct 26, 2026 8:40 PM
- Expected end
- Tue, Oct 27, 2026 6:00 AM
- Duration
- 9 hours 20 minutes
- Road
- M4 – Link Road From A4 To M4 J7
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 26, 2026 8:40 PM
- Last updated
- Mon, Oct 26, 2026 10:35 PM
- Cleared
- Tue, Oct 27, 2026 6:00 AM
- Latest update: M4 Jct 7 southbound Huntercoombe Spur lane 1 closure
- Coordinates
- 51.517304, -0.654462
- Latitude span
- 51.516727 – 51.518278
- Longitude span
- -0.654525 – -0.654425
- Bounding box centre
- 51.517503, -0.654475
- Location descriptions
-
- link road from A4 to M4 J7
- Feed validity status
- Active
- Overall feed start
- Mon, Oct 26, 2026 8:40 PM
- Overall feed end
- Tue, Oct 27, 2026 6:00 AM
- Feed window length
- 9 hours 20 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- link road from A4 to M4 J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {6E3938D7-C8E7-4122-9B68-2906EFEA9ED4}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 184 m
- To Distance
- 261 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.518278 -0.654525 51.517594 -0.654481
Segment 2
4 coordinate pairs- Description
- link road from A4 to M4 J7
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {ECA8589A-42C0-4F3C-A9A7-F528C6E7F85D}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 96 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.517594 -0.654481 51.516891 -0.654436 51.516738 -0.654426 51.516727 -0.654425
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- -0.654525, 51.518278
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.654525,
51.518278
],
[
-0.654481,
51.517594
],
[
-0.654481,
51.517594
],
[
-0.654436,
51.516891
],
[
-0.654426,
51.516738
],
[
-0.654425,
51.516727
]
]
]
}
View road section coordinates
[
[
[
-0.654525,
51.518278
],
[
-0.654481,
51.517594
],
[
-0.654481,
51.517594
],
[
-0.654436,
51.516891
],
[
-0.654426,
51.516738
],
[
-0.654425,
51.516727
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 26, 2026 8:40 PM
- Record versioned
- Mon, Oct 26, 2026 10:35 PM
- Coordinate source
- Geometry
Driving on the M4? See every live closure, roadwork and planned restriction on this road.
M4 live closuresRelated incidents
M4 eastbound lane 1 closure (59/3 to 57/3)
Active Roadworks National HighwaysExpected to clear in 6 hours 57 minutes
M4 eastbound lane 1 closure (59/3 to 57/3)
M4 eastbound hard shoulder + lane 1 and lane 2 closure (106/2 to 104/9)
Active Roadworks National HighwaysExpected to clear in 6 hours 57 minutes
M4 eastbound hard shoulder + lane 1 and lane 2 closure (106/2 to 104/9)
M4 eastbound Jct 18 to Jct 17 single lane running (166/8 to 161/0)
Active Roadworks National HighwaysExpected to clear in 6 hours 57 minutes
M4 eastbound Jct 18 to Jct 17 single lane running (166/8 to 161/0)
M4 eastbound lane 3 closure (81/1 to 80/4)
Active Roadworks National HighwaysExpected to clear in 6 hours 57 minutes
M4 eastbound lane 3 closure (81/1 to 80/4)
M25 Clockwise Jct 15 exit slip road lane 2 closure
Cleared Roadworks National HighwaysCleared 1 hour 2 minutes ago
M25 Clockwise Jct 15 exit slip road lane 2 closure
M25 Anti-clockwise Jct 15 exit slip road Lane 1 closure
Cleared Roadworks National HighwaysCleared 1 hour 2 minutes ago
M25 Anti-clockwise Jct 15 exit slip road Lane 1 closure