M4 eastbound Jct 12 exit slip lane 1 closure
PlannedM4 eastbound Jct 12 exit slip lane 1 closure
- Start time
- Tue, Aug 25, 2026 7:00 PM
- Expected end
- Wed, Aug 26, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M4 – M4 J12 Eastbound Exit
- Category
- Construction Work
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 1 lanes affected, 1 of 2 lanes affected, 1 of 3 lanes affected
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Aug 6, 2026 11:56 AM
- Last updated
- Tue, Aug 25, 2026 8:13 AM
- Cleared
- Wed, Aug 26, 2026 5:00 AM
- Latest update: M4 eastbound Jct 12 exit slip lane 1 closure
- Coordinates
- 51.440916, -1.067806
- Latitude span
- 51.439830 – 51.443029
- Longitude span
- -1.070830 – -1.065717
- Bounding box centre
- 51.441430, -1.068274
- Location descriptions
-
- M4 J12 eastbound exit
- M4 eastbound between J13 and J12
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 25, 2026 7:00 PM
- Overall feed end
- Wed, Aug 26, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M4 J12 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {02527A8E-1623-4ACD-BDBA-DF722F3269BC}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 284 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.44187 -1.06956 51.44139 -1.068768 51.440733 -1.067694 51.440138 -1.066647 51.440107 -1.066598
Segment 2
6 coordinate pairs- Description
- M4 J12 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {47DB4B5F-22E1-5715-1972-8CF183C03CAD}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 71 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.440107 -1.066598 51.439946 -1.066341 51.439908 -1.066204 51.439854 -1.066004 51.439845 -1.065932 51.43983 -1.065717
Segment 3
4 coordinate pairs- Description
- M4 eastbound between J13 and J12
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M4
- Linear Element Model
- The Network Model
- Linear Element Id
- {2613A219-9BE8-4994-92B8-BEF3C826D63A}
- Linear Element Type
- B Carriageway
- From Distance
- 2,172 m
- To Distance
- 2,329 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.443029 -1.07083 51.442677 -1.070448 51.442432 -1.070182 51.44187 -1.06956
- Geometry type
- MultiLineString
- Geometry points
- 15
- First coordinate pair
- -1.069560, 51.441870
- Road section segments
- 1
- Road section points
- 15
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.06956,
51.44187
],
[
-1.068768,
51.44139
],
[
-1.067694,
51.440733
],
[
-1.066647,
51.440138
],
[
-1.066598,
51.440107
],
[
-1.066598,
51.440107
],
[
-1.066341,
51.439946
],
[
-1.066204,
51.439908
],
[
-1.066004,
51.439854
],
[
-1.065932,
51.439845
],
[
-1.065717,
51.43983
],
[
-1.07083,
51.443029
],
[
-1.070448,
51.442677
],
[
-1.070182,
51.442432
],
[
-1.06956,
51.44187
]
]
]
}
View road section coordinates
[
[
[
-1.06956,
51.44187
],
[
-1.068768,
51.44139
],
[
-1.067694,
51.440733
],
[
-1.066647,
51.440138
],
[
-1.066598,
51.440107
],
[
-1.066598,
51.440107
],
[
-1.066341,
51.439946
],
[
-1.066204,
51.439908
],
[
-1.066004,
51.439854
],
[
-1.065932,
51.439845
],
[
-1.065717,
51.43983
],
[
-1.07083,
51.443029
],
[
-1.070448,
51.442677
],
[
-1.070182,
51.442432
],
[
-1.06956,
51.44187
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Aug 6, 2026 11:56 AM
- Record versioned
- Tue, Aug 25, 2026 8:13 AM
- Coordinate source
- Geometry
Driving on the M4? See every live closure, roadwork and planned restriction on this road.
M4 live closuresRelated incidents
M4 eastbound Jct 17 to Jct 16 - lane closure
Planned Roadworks National HighwaysExpected to clear in 6 hours 35 minutes
M4 eastbound Jct 17 to Jct 16 - lane closure
M4 eastbound lane 4 and 3 closure (54/6 to 49/8)
Planned Roadworks National HighwaysStarts in 11 hours 5 minutes
M4 eastbound lane 4 and 3 closure (54/6 to 49/8)
M4 westbound Jct 17 exit and entry slip roads lane closures
Planned Roadworks National HighwaysStarts in 10 hours 35 minutes
M4 westbound Jct 17 exit and entry slip roads lane closures
M4 eastbound Jct 18 to Jct 17 lane closure 154/2-152/5
Planned Roadworks National HighwaysStarts in 10 hours 35 minutes
M4 eastbound Jct 18 to Jct 17 lane closure 154/2-152/5
M4 jct 19 to 15 Eastbound 181/0b to 124/0b lane 3 closure
Planned Roadworks National HighwaysStarts in 10 hours 35 minutes
M4 jct 19 to 15 Eastbound 181/0b to 124/0b lane 3 closure
M4 eastbound Jct 19 to Jct 18 lane closure 180/3-179/4
Planned Roadworks National HighwaysStarts in 10 hours 35 minutes
M4 eastbound Jct 19 to Jct 18 lane closure 180/3-179/4