M3 northbound Winchester Services exit slip road closure
ClearedM3 northbound Winchester Services exit slip road closure
- Start time
- Wed, May 6, 2026 8:00 PM
- Expected end
- Thu, May 7, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M3 – M3 Eastbound At The Winchester Services Slip Road Between J9 And J8
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 7, 2026 2:15 AM
- Last updated
- Thu, May 7, 2026 4:43 AM
- Cleared
- Thu, May 7, 2026 5:00 AM
- Latest update: M3 northbound Winchester Services exit slip road closure
- Coordinates
- 51.117022, -1.255200
- Latitude span
- 51.115273 – 51.118458
- Longitude span
- -1.256443 – -1.254291
- Bounding box centre
- 51.116866, -1.255367
- Location descriptions
-
- M3 eastbound at the Winchester services slip road between J9 and J8
- M3 eastbound between J9 and J8
- Feed validity status
- Planned
- Overall feed start
- Wed, May 6, 2026 8:00 PM
- Overall feed end
- Thu, May 7, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M3 eastbound at the Winchester services slip road between J9 and J8
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {B3A2DACC-F639-4E17-88B6-6A57BD909DBD}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 276 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.116137 -1.255721 51.116718 -1.255348 51.117309 -1.255006 51.118054 -1.254518 51.118188 -1.25443 51.11843 -1.254297 51.118458 -1.254291
Segment 2
3 coordinate pairs- Description
- M3 eastbound between J9 and J8
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {DF58CD1A-5745-4031-8ED7-39450CE79A59}
- Linear Element Type
- B Carriageway
- From Distance
- 178 m
- To Distance
- 286 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.115273 -1.256443 51.115519 -1.256224 51.116137 -1.255721
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -1.255721, 51.116137
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.255721,
51.116137
],
[
-1.255348,
51.116718
],
[
-1.255006,
51.117309
],
[
-1.254518,
51.118054
],
[
-1.25443,
51.118188
],
[
-1.254297,
51.11843
],
[
-1.254291,
51.118458
],
[
-1.256443,
51.115273
],
[
-1.256224,
51.115519
],
[
-1.255721,
51.116137
]
]
]
}
View road section coordinates
[
[
[
-1.255721,
51.116137
],
[
-1.255348,
51.116718
],
[
-1.255006,
51.117309
],
[
-1.254518,
51.118054
],
[
-1.25443,
51.118188
],
[
-1.254297,
51.11843
],
[
-1.254291,
51.118458
],
[
-1.256443,
51.115273
],
[
-1.256224,
51.115519
],
[
-1.255721,
51.116137
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, May 7, 2026 2:15 AM
- Record versioned
- Thu, May 7, 2026 4:43 AM
- Coordinate source
- Geometry
Driving on the M3? See every live closure, roadwork and planned restriction on this road.
M3 live closuresRelated incidents
M3 northbound lane 1 and 2 closure (56/9 to 53/2)
Cleared Roadworks National HighwaysCleared 2 days 1 hour ago
M3 northbound lane 1 and 2 closure (56/9 to 53/2)
M3 northbound lane 1 and 2 closure (56/9 to 53/2)
Cleared Roadworks National HighwaysCleared 1 day 20 hours ago
M3 northbound lane 1 and 2 closure (56/9 to 53/2)
M3 northbound lane 1 and 2 closure (56/9 to 53/2)
Cleared Roadworks National HighwaysCleared 3 days 40 minutes ago
M3 northbound lane 1 and 2 closure (56/9 to 53/2)
M3 northbound lane 1 and 2 closure (56/9 to 53/2)
Cleared Roadworks National HighwaysCleared 2 days 19 hours ago
M3 northbound lane 1 and 2 closure (56/9 to 53/2)
M3 northbound lane 1, 2 and 3 closure (50/5 to 46/5)
Cleared Roadworks National HighwaysCleared 4 days 45 minutes ago
M3 northbound lane 1, 2 and 3 closure (50/5 to 46/5)
M3 northbound lane 3 closure (80/1 to 79/3)
Cleared Roadworks National HighwaysCleared 4 days 45 minutes ago
M3 northbound lane 3 closure (80/1 to 79/3)