M3 northbound lane 3 closure (79/6 to 77/3)
ClearedM3 northbound lane 3 closure (79/6 to 77/3)
- Start time
- Mon, Jun 29, 2026 7:00 PM
- Expected end
- Tue, Jun 30, 2026 5:00 AM
- Duration
- 1 second
- Road
- M3 – M3 Eastbound Between J7 And J6
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jun 12, 2026 3:16 PM
- Last updated
- Mon, Jun 29, 2026 6:35 PM
- Cleared
- Mon, Jun 29, 2026 7:00 PM
- Latest update: M3 northbound lane 3 closure (79/6 to 77/3)
- Coordinates
- 51.240866, -1.102800
- Latitude span
- 51.234852 – 51.246880
- Longitude span
- -1.115461 – -1.089755
- Bounding box centre
- 51.240866, -1.102608
- Location descriptions
-
- M3 eastbound between J7 and J6
- Feed validity status
- Planned
- Overall feed start
- Mon, Jun 29, 2026 7:00 PM
- Overall feed end
- Tue, Jun 30, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
14 coordinate pairs- Description
- M3 eastbound between J7 and J6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {83D060E5-12FB-4851-BC71-2E843691600E}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 1,694 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.23788 -1.109336 51.239437 -1.106069 51.239588 -1.105751 51.241233 -1.102137 51.242533 -1.09929 51.242736 -1.098842 51.243193 -1.09783 51.243956 -1.096139 51.244379 -1.095228 51.244708 -1.094519 51.245468 -1.092828 51.245654 -1.092438 51.246034 -1.091614 51.24688 -1.089755
Segment 2
7 coordinate pairs- Description
- M3 eastbound between J7 and J6
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {5A2483EF-EB1B-4C0D-B769-199B2FFD5F3A}
- Linear Element Type
- B Carriageway
- From Distance
- 262 m
- To Distance
- 807 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.234852 -1.115461 51.235436 -1.114311 51.235949 -1.113298 51.236534 -1.112069 51.236808 -1.111505 51.237038 -1.111043 51.23788 -1.109336
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- -1.109336, 51.237880
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.109336,
51.23788
],
[
-1.106069,
51.239437
],
[
-1.105751,
51.239588
],
[
-1.102137,
51.241233
],
[
-1.09929,
51.242533
],
[
-1.098842,
51.242736
],
[
-1.09783,
51.243193
],
[
-1.096139,
51.243956
],
[
-1.095228,
51.244379
],
[
-1.094519,
51.244708
],
[
-1.092828,
51.245468
],
[
-1.092438,
51.245654
],
[
-1.091614,
51.246034
],
[
-1.089755,
51.24688
],
[
-1.115461,
51.234852
],
[
-1.114311,
51.235436
],
[
-1.113298,
51.235949
],
[
-1.112069,
51.236534
],
[
-1.111505,
51.236808
],
[
-1.111043,
51.237038
],
[
-1.109336,
51.23788
]
]
]
}
View road section coordinates
[
[
[
-1.109336,
51.23788
],
[
-1.106069,
51.239437
],
[
-1.105751,
51.239588
],
[
-1.102137,
51.241233
],
[
-1.09929,
51.242533
],
[
-1.098842,
51.242736
],
[
-1.09783,
51.243193
],
[
-1.096139,
51.243956
],
[
-1.095228,
51.244379
],
[
-1.094519,
51.244708
],
[
-1.092828,
51.245468
],
[
-1.092438,
51.245654
],
[
-1.091614,
51.246034
],
[
-1.089755,
51.24688
],
[
-1.115461,
51.234852
],
[
-1.114311,
51.235436
],
[
-1.113298,
51.235949
],
[
-1.112069,
51.236534
],
[
-1.111505,
51.236808
],
[
-1.111043,
51.237038
],
[
-1.109336,
51.23788
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Jun 12, 2026 3:16 PM
- Record versioned
- Mon, Jun 29, 2026 6:35 PM
- Coordinate source
- Geometry
Driving on the M3? See every live closure, roadwork and planned restriction on this road.
M3 live closuresRelated incidents
A303 eastbound Bullington to Popham carriageway closure
Active Roadworks National HighwaysExpected to clear in 7 hours 37 minutes
A303 eastbound Bullington to Popham carriageway closure
A303 eastbound Bullington to Popham carriageway closure
Cleared Roadworks National HighwaysCleared 12 minutes 55 seconds ago
A303 eastbound Bullington to Popham carriageway closure
M3 northbound lane 1 and 2 closure (50/2 to 47/1)
Cleared Roadworks National HighwaysCleared 57 minutes 55 seconds ago
M3 northbound lane 1 and 2 closure (50/2 to 47/1)
M3 northbound hard shouder closure (62/3 to 60/0)
Cleared Roadworks National HighwaysCleared 13 hours 22 minutes ago
M3 northbound hard shouder closure (62/3 to 60/0)
M3 northbound hard shouder closure (62/3 to 60/0)
Cleared Roadworks National HighwaysCleared 7 hours 52 minutes ago
M3 northbound hard shouder closure (62/3 to 60/0)
A303 eastbound Bullington to Popham carriageway closure
Cleared Roadworks National HighwaysCleared 17 hours 42 minutes ago
A303 eastbound Bullington to Popham carriageway closure