M3 northbound Jct 4 Lane 1 closure on exit slip road
ActiveM3 northbound Jct 4 Lane 1 closure on exit slip road
- Start time
- Mon, Aug 3, 2026 9:15 PM
- Expected end
- Tue, Aug 4, 2026 5:00 AM
- Duration
- 7 hours 45 minutes
- Road
- M3 – M3 J4 Eastbound Exit
- Category
- Authority Operation
- Direction
- Eastbound
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Aug 3, 2026 9:15 PM
- Last updated
- Mon, Aug 3, 2026 11:11 PM
- Cleared
- Tue, Aug 4, 2026 5:00 AM
- Latest update: M3 northbound Jct 4 Lane 1 closure on exit slip road
- Coordinates
- 51.317063, -0.759798
- Latitude span
- 51.316398 – 51.317553
- Longitude span
- -0.760137 – -0.759528
- Bounding box centre
- 51.316976, -0.759833
- Location descriptions
-
- M3 J4 eastbound exit
- Feed validity status
- Active
- Overall feed start
- Mon, Aug 3, 2026 9:15 PM
- Overall feed end
- Tue, Aug 4, 2026 5:00 AM
- Feed window length
- 7 hours 45 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M3 J4 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {A92C027B-5CF9-4F2F-8ED4-DD430D876C3B}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 45 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.317174 -0.759762 51.317247 -0.759713 51.317372 -0.759595 51.317416 -0.759565 51.317553 -0.759528
Segment 2
5 coordinate pairs- Description
- M3 J4 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {625AD8A8-7B4A-44AB-BBAB-BC64125D284C}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 204 m
- To Distance
- 295 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.316398 -0.760137 51.316478 -0.760093 51.316791 -0.759961 51.317024 -0.759863 51.317174 -0.759762
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -0.759762, 51.317174
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.759762,
51.317174
],
[
-0.759713,
51.317247
],
[
-0.759595,
51.317372
],
[
-0.759565,
51.317416
],
[
-0.759528,
51.317553
],
[
-0.760137,
51.316398
],
[
-0.760093,
51.316478
],
[
-0.759961,
51.316791
],
[
-0.759863,
51.317024
],
[
-0.759762,
51.317174
]
]
]
}
View road section coordinates
[
[
[
-0.759762,
51.317174
],
[
-0.759713,
51.317247
],
[
-0.759595,
51.317372
],
[
-0.759565,
51.317416
],
[
-0.759528,
51.317553
],
[
-0.760137,
51.316398
],
[
-0.760093,
51.316478
],
[
-0.759961,
51.316791
],
[
-0.759863,
51.317024
],
[
-0.759762,
51.317174
]
]
]
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Aug 3, 2026 9:15 PM
- Record versioned
- Mon, Aug 3, 2026 11:11 PM
- Coordinate source
- Geometry
Driving on the M3? See every live closure, roadwork and planned restriction on this road.
M3 live closuresRelated incidents
M3 northbound Jct 4 Lane 1 closure on exit slip road
Cleared Roadworks National HighwaysCleared 1 hour 57 minutes ago
M3 northbound Jct 4 Lane 1 closure on exit slip road
M3 northbound lane 1 and lane 2 closure (43/0 to 41/1)
Cleared Roadworks National HighwaysCleared 2 days 18 hours ago
M3 northbound lane 1 and lane 2 closure (43/0 to 41/1)
M3 northbound lane 1 and 2 closure (50/0 to 46/3)
Cleared Roadworks National HighwaysCleared 4 days 20 hours ago
M3 northbound lane 1 and 2 closure (50/0 to 46/3)
M3 northbound lane 1 and 2 closure (50/0 to 46/3)
Cleared Roadworks National HighwaysCleared 4 days 23 hours ago
M3 northbound lane 1 and 2 closure (50/0 to 46/3)
M3 northbound lane 1 and 2 closure (50/0 to 46/3)
Cleared Roadworks National HighwaysCleared 5 days 1 hour ago
M3 northbound lane 1 and 2 closure (50/0 to 46/3)
M3 northbound lane 1 and 2 closure (73/0 to 70/8)
Cleared Roadworks National HighwaysCleared 4 days 21 hours ago
M3 northbound lane 1 and 2 closure (73/0 to 70/8)