M3 northbound hard shoulder closure (76/1 to 75/5)
PlannedM3 northbound hard shoulder closure (76/1 to 75/5)
- Start time
- Tue, May 26, 2026 8:00 PM
- Expected end
- Wed, May 27, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M3 – M3 Eastbound Between J7 And J6
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jan 26, 2026 1:55 PM
- Last updated
- Tue, May 26, 2026 6:20 AM
- Cleared
- Wed, May 27, 2026 5:00 AM
- Latest update: M3 northbound hard shoulder closure (76/1 to 75/5)
- Coordinates
- 51.255310, -1.071221
- Latitude span
- 51.253488 – 51.256667
- Longitude span
- -1.075242 – -1.068249
- Bounding box centre
- 51.255078, -1.071746
- Location descriptions
-
- M3 eastbound between J7 and J6
- M3 eastbound within J6
- Feed validity status
- Planned
- Overall feed start
- Tue, May 26, 2026 8:00 PM
- Overall feed end
- Wed, May 27, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M3 eastbound between J7 and J6
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {81F635D7-CBD2-4F17-85B0-CCBBA783339E}
- Linear Element Type
- B Carriageway
- From Distance
- 292 m
- To Distance
- 731 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.253488 -1.075242 51.2543 -1.073452 51.254494 -1.073004 51.25483 -1.072281 51.255793 -1.070141
Segment 2
4 coordinate pairs- Description
- M3 eastbound within J6
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M3
- Linear Element Model
- The Network Model
- Linear Element Id
- {E6BC5CF7-4636-44D8-9B01-32742AA43FF4}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 163 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.255793 -1.070141 51.255899 -1.069924 51.256527 -1.068554 51.256667 -1.068249
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- -1.075242, 51.253488
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.075242,
51.253488
],
[
-1.073452,
51.2543
],
[
-1.073004,
51.254494
],
[
-1.072281,
51.25483
],
[
-1.070141,
51.255793
],
[
-1.070141,
51.255793
],
[
-1.069924,
51.255899
],
[
-1.068554,
51.256527
],
[
-1.068249,
51.256667
]
]
]
}
View road section coordinates
[
[
[
-1.075242,
51.253488
],
[
-1.073452,
51.2543
],
[
-1.073004,
51.254494
],
[
-1.072281,
51.25483
],
[
-1.070141,
51.255793
],
[
-1.070141,
51.255793
],
[
-1.069924,
51.255899
],
[
-1.068554,
51.256527
],
[
-1.068249,
51.256667
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jan 26, 2026 1:55 PM
- Record versioned
- Tue, May 26, 2026 6:20 AM
- Coordinate source
- Geometry
Related incidents
A303 eastbound Bullington to M3 carriageway closure
Planned National HighwaysA303 eastbound Bullington to M3 carriageway closure
M3 southbound Jct 13 entry slip road closure
Active National HighwaysM3 southbound Jct 13 entry slip road closure
M3 Eastbound Jct 2 to Jct 1 lane 3,2 closure
Planned National HighwaysM3 Eastbound Jct 2 to Jct 1 lane 3,2 closure
M3 Eastbound Jct 2 to Jct 1 lane 3,2 closure
Planned National HighwaysM3 Eastbound Jct 2 to Jct 1 lane 3,2 closure
M3 Eastbound Jct 2 to Jct 1 lane 3,2 closure
Planned National HighwaysM3 Eastbound Jct 2 to Jct 1 lane 3,2 closure
M3 southbound Jct 13 entry slip road closure
Planned National HighwaysM3 southbound Jct 13 entry slip road closure