M3 northbound entry slip road closure
ClearedM3 northbound entry slip road closure
- Start time
- Tue, Aug 11, 2026 7:00 PM
- Expected end
- Wed, Aug 12, 2026 4:00 AM
- Duration
- 7 hours 40 minutes 1 second
- Category
- Authority Operation
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, May 28, 2026 2:08 PM
- Last updated
- Wed, Aug 12, 2026 2:26 AM
- Cleared
- Wed, Aug 12, 2026 2:40 AM
- Latest update: M3 northbound entry slip road closure
- Feed validity status
- Planned
- Overall feed start
- Tue, Aug 11, 2026 7:00 PM
- Overall feed end
- Wed, Aug 12, 2026 4:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, May 28, 2026 2:08 PM
- Record versioned
- Wed, Aug 12, 2026 2:26 AM
Related incidents
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
Planned Roadworks National HighwaysExpected to clear in 1 hour 25 minutes
M60 anticlockwise lane 1 closure (MP 5/8 to 4/3)
M40 Southbound Jct 9, carriageway closure between exit and entry slips.
Planned Roadworks National HighwaysExpected to clear in 1 hour 25 minutes
M40 Southbound Jct 9, carriageway closure between exit and entry slips.
M3 northbound Jct 10 to Jct 8 carriageway closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 25 minutes
M3 northbound Jct 10 to Jct 8 carriageway closure
A12 southbound Jct 25 lane closure (MP 156/2 to 154/8)
Planned Roadworks National HighwaysExpected to clear in 25 minutes 11 seconds
A12 southbound Jct 25 lane closure (MP 156/2 to 154/8)
Whole network mobile lane closure
Planned Roadworks National HighwaysExpected to clear in 1 hour 25 minutes
Whole network mobile lane closure
M1 southbound Jct 45 exit slip road closure
Active Roadworks National HighwaysExpected to clear in 1 hour 25 minutes
M1 southbound Jct 45 exit slip road closure