M275 northbound lane 1 closure
ClearedM275 northbound lane 1 closure
- Start time
- Thu, Apr 23, 2026 7:00 PM
- Expected end
- Fri, Apr 24, 2026 5:00 AM
- Duration
- 10 hours
- Road
- M27 – M27 Westbound Within J12 After M275 Access
- Category
- Road Maintenance
- Direction
- Westbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 3 lanes affected, 1 of 1 lanes affected, 1 of 2 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Mar 16, 2026 2:32 PM
- Last updated
- Thu, Apr 23, 2026 6:31 PM
- Cleared
- Fri, Apr 24, 2026 5:00 AM
- Latest update: M275 northbound lane 1 closure
- Coordinates
- 50.836637, -1.086065
- Latitude span
- 50.831186 – 50.840215
- Longitude span
- -1.089030 – -1.084928
- Bounding box centre
- 50.835701, -1.086979
- Location descriptions
-
- M27 westbound within J12 after M275 access
- link road from M275 to M27 J12 westbound
- link road from M275 to A27 westbound
- M275 northbound between J1 and M27/A27
- Feed validity status
- Planned
- Overall feed start
- Thu, Apr 23, 2026 7:00 PM
- Overall feed end
- Fri, Apr 24, 2026 5:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M27 westbound within J12 after M275 access
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {BEBF9CF5-4BFF-4240-8F54-3711D8F3AE7C}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 150 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.839382 -1.087348 50.839419 -1.087418 50.839611 -1.087855 50.839794 -1.088206 50.840215 -1.08903
Segment 2
17 coordinate pairs- Description
- link road from M275 to M27 J12 westbound
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M275
- Linear Element Model
- The Network Model
- Linear Element Id
- {E3AE04F8-7542-4FEF-A8BB-4D0995856E38}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 419 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.83426 -1.085431 50.83451 -1.085299 50.834941 -1.08512 50.835228 -1.085043 50.835407 -1.084997 50.835481 -1.084985 50.835704 -1.084949 50.836045 -1.084928 50.836198 -1.084939 50.836432 -1.084963 50.836729 -1.085028 50.836901 -1.085096 50.837171 -1.085204 50.837442 -1.085341 50.837515 -1.085382 50.837759 -1.085562 50.837913 -1.085701
Segment 3
7 coordinate pairs- Description
- link road from M275 to A27 westbound
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M275
- Linear Element Model
- The Network Model
- Linear Element Id
- {53F05BE1-3637-4329-B55D-260A9771A9E4}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 201 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.837913 -1.085701 50.838084 -1.085825 50.838284 -1.086006 50.838566 -1.086307 50.838728 -1.08648 50.839046 -1.086886 50.839382 -1.087348
Segment 4
5 coordinate pairs- Description
- M275 northbound between J1 and M27/A27
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- North Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M275
- Linear Element Model
- The Network Model
- Linear Element Id
- {2DA49BEF-D02E-1620-FA82-8A6EA405CB68}
- Linear Element Type
- B Carriageway
- From Distance
- 288 m
- To Distance
- 661 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.831186 -1.087554 50.831515 -1.08732 50.832029 -1.086955 50.832617 -1.086555 50.83426 -1.085431
- Geometry type
- MultiLineString
- Geometry points
- 34
- First coordinate pair
- -1.087348, 50.839382
- Road section segments
- 1
- Road section points
- 34
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.087348,
50.839382
],
[
-1.087418,
50.839419
],
[
-1.087855,
50.839611
],
[
-1.088206,
50.839794
],
[
-1.08903,
50.840215
],
[
-1.085431,
50.83426
],
[
-1.085299,
50.83451
],
[
-1.08512,
50.834941
],
[
-1.085043,
50.835228
],
[
-1.084997,
50.835407
],
[
-1.084985,
50.835481
],
[
-1.084949,
50.835704
],
[
-1.084928,
50.836045
],
[
-1.084939,
50.836198
],
[
-1.084963,
50.836432
],
[
-1.085028,
50.836729
],
[
-1.085096,
50.836901
],
[
-1.085204,
50.837171
],
[
-1.085341,
50.837442
],
[
-1.085382,
50.837515
],
[
-1.085562,
50.837759
],
[
-1.085701,
50.837913
],
[
-1.085701,
50.837913
],
[
-1.085825,
50.838084
],
[
-1.086006,
50.838284
],
[
-1.086307,
50.838566
],
[
-1.08648,
50.838728
],
[
-1.086886,
50.839046
],
[
-1.087348,
50.839382
],
[
-1.087554,
50.831186
],
[
-1.08732,
50.831515
],
[
-1.086955,
50.832029
],
[
-1.086555,
50.832617
],
[
-1.085431,
50.83426
]
]
]
}
View road section coordinates
[
[
[
-1.087348,
50.839382
],
[
-1.087418,
50.839419
],
[
-1.087855,
50.839611
],
[
-1.088206,
50.839794
],
[
-1.08903,
50.840215
],
[
-1.085431,
50.83426
],
[
-1.085299,
50.83451
],
[
-1.08512,
50.834941
],
[
-1.085043,
50.835228
],
[
-1.084997,
50.835407
],
[
-1.084985,
50.835481
],
[
-1.084949,
50.835704
],
[
-1.084928,
50.836045
],
[
-1.084939,
50.836198
],
[
-1.084963,
50.836432
],
[
-1.085028,
50.836729
],
[
-1.085096,
50.836901
],
[
-1.085204,
50.837171
],
[
-1.085341,
50.837442
],
[
-1.085382,
50.837515
],
[
-1.085562,
50.837759
],
[
-1.085701,
50.837913
],
[
-1.085701,
50.837913
],
[
-1.085825,
50.838084
],
[
-1.086006,
50.838284
],
[
-1.086307,
50.838566
],
[
-1.08648,
50.838728
],
[
-1.086886,
50.839046
],
[
-1.087348,
50.839382
],
[
-1.087554,
50.831186
],
[
-1.08732,
50.831515
],
[
-1.086955,
50.832029
],
[
-1.086555,
50.832617
],
[
-1.085431,
50.83426
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Mar 16, 2026 2:32 PM
- Record versioned
- Thu, Apr 23, 2026 6:31 PM
- Coordinate source
- Geometry
Driving on the M27? See every live closure, roadwork and planned restriction on this road.
M27 live closuresRelated incidents
M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
Active Roadworks National HighwaysExpected to clear in 2 months 18 hours
M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
M275 Northbound Tipner to M27 Carriageway Closure
Cleared Roadworks National HighwaysExpected to clear in 17 hours 8 minutes
M275 Northbound Tipner to M27 Carriageway Closure
M27 eastbound Jct 3 exit slip lane closure
Cleared Roadworks National HighwaysCleared 1 day 14 hours ago
M27 eastbound Jct 3 exit slip lane closure
M27 eastbound Jct 3 exit slip lane closure
Cleared Roadworks National HighwaysCleared 2 days 14 hours ago
M27 eastbound Jct 3 exit slip lane closure
M27 eastbound Jct 3 exit slip lane closure
Cleared Roadworks National HighwaysCleared 3 days 14 hours ago
M27 eastbound Jct 3 exit slip lane closure
M27 eastbound lane 1 2 and 3 closure (13/0 to 14/3)
Cleared Roadworks National HighwaysCleared 4 days 5 hours ago
M27 eastbound lane 1 2 and 3 closure (13/0 to 14/3)