M27 westbound Jct 12 to M275 southbound link road closure
ClearedM27 westbound Jct 12 to M275 southbound link road closure
- Start time
- Wed, Aug 12, 2026 8:00 PM
- Expected end
- Thu, Aug 13, 2026 4:00 AM
- Duration
- 25 minutes 1 second
- Road
- M27 – M27 Eastbound Within J12 Before M275 Access
- Category
- Authority Operation
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Aug 12, 2026 7:01 PM
- Last updated
- Wed, Aug 12, 2026 7:59 PM
- Cleared
- Wed, Aug 12, 2026 8:25 PM
- Latest update: M27 westbound Jct 12 to M275 southbound link road closure
- Coordinates
- 50.841300, -1.090751
- Latitude span
- 50.840388 – 50.842094
- Longitude span
- -1.092284 – -1.088982
- Bounding box centre
- 50.841241, -1.090633
- Location descriptions
-
- M27 eastbound within J12 before M275 access
- Feed validity status
- Planned
- Overall feed start
- Wed, Aug 12, 2026 8:00 PM
- Overall feed end
- Thu, Aug 13, 2026 4:00 AM
- Feed window length
- 8 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M27 eastbound within J12 before M275 access
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {1AF0EF49-1CFC-58B0-3AD7-DD2EC94E88EC}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 146 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.841218 -1.090594 50.840968 -1.090115 50.840388 -1.088982
Segment 2
5 coordinate pairs- Description
- M27 eastbound within J12 before M275 access
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {D50516BE-52A8-4893-9AA6-A6FD864551A6}
- Linear Element Type
- A Carriageway
- From Distance
- 24 m
- To Distance
- 178 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.842094 -1.092284 50.841516 -1.091169 50.841502 -1.091138 50.841497 -1.091129 50.841218 -1.090594
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- -1.090594, 50.841218
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.090594,
50.841218
],
[
-1.090115,
50.840968
],
[
-1.088982,
50.840388
],
[
-1.092284,
50.842094
],
[
-1.091169,
50.841516
],
[
-1.091138,
50.841502
],
[
-1.091129,
50.841497
],
[
-1.090594,
50.841218
]
]
]
}
View road section coordinates
[
[
[
-1.090594,
50.841218
],
[
-1.090115,
50.840968
],
[
-1.088982,
50.840388
],
[
-1.092284,
50.842094
],
[
-1.091169,
50.841516
],
[
-1.091138,
50.841502
],
[
-1.091129,
50.841497
],
[
-1.090594,
50.841218
]
]
]
- Cause type
- Authority Operation
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Aug 12, 2026 7:01 PM
- Record versioned
- Wed, Aug 12, 2026 7:59 PM
- Coordinate source
- Geometry
Driving on the M27? See every live closure, roadwork and planned restriction on this road.
M27 live closuresRelated incidents
M27 westbound Jct 12 to M275 southbound link road closure
Active Roadworks National HighwaysExpected to clear in 6 hours 4 minutes
M27 westbound Jct 12 to M275 southbound link road closure
M27 westbound Jct 3 entry slip road closure
Cleared Roadworks National HighwaysCleared 1 hour 5 minutes ago
M27 westbound Jct 3 entry slip road closure
M3 southbound to M27 eastbound link road lane 2 closure (116/4 to 118/4)
Cleared Roadworks National HighwaysCleared 25 minutes 3 seconds ago
M3 southbound to M27 eastbound link road lane 2 closure (116/4 to 118/4)
M27 westbound Jct 3 entry slip road closure
Cleared Roadworks National HighwaysCleared 19 hours 40 minutes ago
M27 westbound Jct 3 entry slip road closure
M275 northbound Rudmore to M27 both directions Carriageway closure
Cleared Roadworks National HighwaysCleared 19 hours 3 seconds ago
M275 northbound Rudmore to M27 both directions Carriageway closure
M27 eastbound lane 1 closure (9/1 to 12/2)
Cleared Roadworks National HighwaysCleared 17 hours 50 minutes ago
M27 eastbound lane 1 closure (9/1 to 12/2)