M27 westbound Jct 1 exit slip road closure
PlannedM27 westbound Jct 1 exit slip road closure
- Start time
- Wed, Oct 28, 2026 9:00 PM
- Expected end
- Thu, Oct 29, 2026 6:00 AM
- Duration
- 9 hours
- Road
- M27 – M27 J1 Westbound Exit
- Category
- Road Maintenance
- Direction
- Westbound
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 9, 2026 11:31 AM
- Last updated
- Wed, Oct 28, 2026 2:10 AM
- Cleared
- Thu, Oct 29, 2026 6:00 AM
- Latest update: M27 westbound Jct 1 exit slip road closure
- Coordinates
- 50.921386, -1.587293
- Latitude span
- 50.920627 – 50.922784
- Longitude span
- -1.588369 – -1.584820
- Bounding box centre
- 50.921706, -1.586595
- Location descriptions
-
- M27 J1 westbound exit
- Feed validity status
- Planned
- Overall feed start
- Wed, Oct 28, 2026 9:00 PM
- Overall feed end
- Thu, Oct 29, 2026 6:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M27 J1 westbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {AB7E08B0-9738-47D2-BD58-071F081A86B5}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 116 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.922784 -1.58482 50.922127 -1.586115
Segment 2
9 coordinate pairs- Description
- M27 J1 westbound exit
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- West Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {277C3DE6-E75A-45C0-BFAD-538634989344}
- Linear Element Type
- B Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 232 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.922127 -1.586115 50.922061 -1.586245 50.921447 -1.587314 50.920981 -1.588052 50.920846 -1.588227 50.9208 -1.588286 50.920771 -1.588318 50.920674 -1.588358 50.920627 -1.588369
- Geometry type
- MultiLineString
- Geometry points
- 11
- First coordinate pair
- -1.584820, 50.922784
- Road section segments
- 1
- Road section points
- 11
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.58482,
50.922784
],
[
-1.586115,
50.922127
],
[
-1.586115,
50.922127
],
[
-1.586245,
50.922061
],
[
-1.587314,
50.921447
],
[
-1.588052,
50.920981
],
[
-1.588227,
50.920846
],
[
-1.588286,
50.9208
],
[
-1.588318,
50.920771
],
[
-1.588358,
50.920674
],
[
-1.588369,
50.920627
]
]
]
}
View road section coordinates
[
[
[
-1.58482,
50.922784
],
[
-1.586115,
50.922127
],
[
-1.586115,
50.922127
],
[
-1.586245,
50.922061
],
[
-1.587314,
50.921447
],
[
-1.588052,
50.920981
],
[
-1.588227,
50.920846
],
[
-1.588286,
50.9208
],
[
-1.588318,
50.920771
],
[
-1.588358,
50.920674
],
[
-1.588369,
50.920627
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Oct 9, 2026 11:31 AM
- Record versioned
- Wed, Oct 28, 2026 2:10 AM
- Coordinate source
- Geometry
Driving on the M27? See every live closure, roadwork and planned restriction on this road.
M27 live closuresRelated incidents
A31 eastbound lane 1 closure (27/0 to 24/5)
Planned Roadworks National HighwaysExpected to clear in 3 hours 43 minutes
A31 eastbound lane 1 closure (27/0 to 24/5)
M27 eastbound lane 1, 2 and 3 closure (26/8 to 29/2)
Planned Roadworks National HighwaysStarts in 18 hours 43 minutes
M27 eastbound lane 1, 2 and 3 closure (26/8 to 29/2)
M27 eastbound to M3 northbound link road closure
Cleared Roadworks National HighwaysCleared 2 hours 46 minutes ago
M27 eastbound to M3 northbound link road closure
M27 eastbound Jct 7 to Jct 9 carriageway closure
Cleared Roadworks National HighwaysCleared 2 hours 16 minutes ago
M27 eastbound Jct 7 to Jct 9 carriageway closure
M27 eastbound to M3 northbound link road closure
Cleared Roadworks National HighwaysCleared 3 hours 51 minutes ago
M27 eastbound to M3 northbound link road closure
M27 eastbound lane 1 closure (42/8 to 43/8)
Cleared Roadworks National HighwaysCleared 2 hours 46 minutes ago
M27 eastbound lane 1 closure (42/8 to 43/8)