M27 eastbound lane 3 closure (8/5 to 9/3)
ClearedM27 eastbound lane 3 closure (8/5 to 9/3)
- Start time
- Tue, Feb 10, 2026 8:00 PM
- Expected end
- Wed, Feb 11, 2026 6:00 AM
- Duration
- 10 hours
- Road
- M27 – M27 Eastbound Between J2 And J3
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 3 closed, 1 of 3 lanes affected
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jan 26, 2026 9:42 AM
- Last updated
- Mon, Feb 9, 2026 11:48 PM
- Cleared
- Wed, Feb 11, 2026 6:00 AM
- Latest update: M27 eastbound lane 3 closure (8/5 to 9/3)
- Coordinates
- 50.946023, -1.503152
- Latitude span
- 50.945720 – 50.946264
- Longitude span
- -1.508676 – -1.496924
- Bounding box centre
- 50.945992, -1.502800
- Location descriptions
-
- M27 eastbound between J2 and J3
- Feed validity status
- Planned
- Overall feed start
- Tue, Feb 10, 2026 8:00 PM
- Overall feed end
- Wed, Feb 11, 2026 6:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M27 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {8F3EBB66-8665-4336-B69A-7E21CD1850AA}
- Linear Element Type
- A Carriageway
- From Distance
- 395 m
- To Distance
- 993 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.946264 -1.508676 50.946235 -1.507801 50.946129 -1.505127 50.94604 -1.503163 50.945888 -1.500186
Segment 2
2 coordinate pairs- Description
- M27 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl3
- Lane Number
- 3
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End2
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {AD8DD772-A547-4518-B768-EA30E2BC22AC}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 229 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.945888 -1.500186 50.94572 -1.496924
- Geometry type
- MultiLineString
- Geometry points
- 7
- First coordinate pair
- -1.508676, 50.946264
- Road section segments
- 1
- Road section points
- 7
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.508676,
50.946264
],
[
-1.507801,
50.946235
],
[
-1.505127,
50.946129
],
[
-1.503163,
50.94604
],
[
-1.500186,
50.945888
],
[
-1.500186,
50.945888
],
[
-1.496924,
50.94572
]
]
]
}
View road section coordinates
[
[
[
-1.508676,
50.946264
],
[
-1.507801,
50.946235
],
[
-1.505127,
50.946129
],
[
-1.503163,
50.94604
],
[
-1.500186,
50.945888
],
[
-1.500186,
50.945888
],
[
-1.496924,
50.94572
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jan 26, 2026 9:42 AM
- Record versioned
- Mon, Feb 9, 2026 11:48 PM
- Coordinate source
- Geometry
Driving on the M27? See every live closure, roadwork and planned restriction on this road.
M27 live closuresRelated incidents
M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
Active Roadworks National HighwaysExpected to clear in 2 months 8 hours
M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
A303 eastbound lane 2 closure (121/9 to 120/6)
Cleared Roadworks National HighwaysCleared 1 day 15 hours ago
A303 eastbound lane 2 closure (121/9 to 120/6)
M27 eastbound Jct 3 exit slip lane closure
Cleared Roadworks National HighwaysCleared 2 days 14 minutes ago
M27 eastbound Jct 3 exit slip lane closure
M27 east/south/west Jct 3 partial roundabout closure
Cleared Roadworks National HighwaysCleared 1 day 21 hours ago
M27 east/south/west Jct 3 partial roundabout closure
A303 eastbound lane 2 closure (121/9 to 120/6)
Cleared Roadworks National HighwaysCleared 2 days 54 minutes ago
A303 eastbound lane 2 closure (121/9 to 120/6)
M20 eastbound Jct 13 to A20 Courtwood Interchange carriageway closure
Cleared Roadworks National HighwaysCleared 2 days 54 minutes ago
M20 eastbound Jct 13 to A20 Courtwood Interchange carriageway closure