M27 eastbound Jct 8 exit slip road closure
ClearedM27 eastbound Jct 8 exit slip road closure
- Start time
- Sat, Apr 18, 2026 8:00 PM
- Expected end
- Sun, Apr 19, 2026 5:00 AM
- Duration
- 9 hours
- Road
- M27 – M27 J8 Eastbound Exit
- Category
- Road Maintenance
- Direction
- Eastbound
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Apr 2, 2026 2:32 PM
- Last updated
- Sat, Apr 18, 2026 4:54 AM
- Cleared
- Sun, Apr 19, 2026 5:00 AM
- Latest update: M27 eastbound Jct 8 exit slip road closure
- Coordinates
- 50.902118, -1.313938
- Latitude span
- 50.899010 – 50.904260
- Longitude span
- -1.315496 – -1.311784
- Bounding box centre
- 50.901635, -1.313640
- Location descriptions
-
- M27 J8 eastbound exit
- Feed validity status
- Planned
- Overall feed start
- Sat, Apr 18, 2026 8:00 PM
- Overall feed end
- Sun, Apr 19, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M27 J8 eastbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {ABD320F2-710C-49A6-9A86-7A8C652CE145}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 60 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.90426 -1.315496 50.903911 -1.315174 50.90379 -1.315062
Segment 2
11 coordinate pairs- Description
- M27 J8 eastbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {286278E7-9536-41DC-BAF8-142160643AC5}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 580 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.90379 -1.315062 50.903736 -1.31502 50.903275 -1.314657 50.903203 -1.314608 50.902571 -1.314184 50.902011 -1.313836 50.900946 -1.313169 50.900817 -1.313086 50.899222 -1.312057 50.899104 -1.311931 50.89901 -1.311784
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -1.315496, 50.904260
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.315496,
50.90426
],
[
-1.315174,
50.903911
],
[
-1.315062,
50.90379
],
[
-1.315062,
50.90379
],
[
-1.31502,
50.903736
],
[
-1.314657,
50.903275
],
[
-1.314608,
50.903203
],
[
-1.314184,
50.902571
],
[
-1.313836,
50.902011
],
[
-1.313169,
50.900946
],
[
-1.313086,
50.900817
],
[
-1.312057,
50.899222
],
[
-1.311931,
50.899104
],
[
-1.311784,
50.89901
]
]
]
}
View road section coordinates
[
[
[
-1.315496,
50.90426
],
[
-1.315174,
50.903911
],
[
-1.315062,
50.90379
],
[
-1.315062,
50.90379
],
[
-1.31502,
50.903736
],
[
-1.314657,
50.903275
],
[
-1.314608,
50.903203
],
[
-1.314184,
50.902571
],
[
-1.313836,
50.902011
],
[
-1.313169,
50.900946
],
[
-1.313086,
50.900817
],
[
-1.312057,
50.899222
],
[
-1.311931,
50.899104
],
[
-1.311784,
50.89901
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 80
- Record created
- Thu, Apr 2, 2026 2:32 PM
- Record versioned
- Sat, Apr 18, 2026 4:54 AM
- Coordinate source
- Geometry
Driving on the M27? See every live closure, roadwork and planned restriction on this road.
M27 live closuresRelated incidents
M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
Active Roadworks National HighwaysExpected to clear in 2 months 16 hours
M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
M27 eastbound Jct 3 exit slip lane closure
Cleared Roadworks National HighwaysCleared 1 day 16 hours ago
M27 eastbound Jct 3 exit slip lane closure
M27 eastbound Jct 3 exit slip lane closure
Cleared Roadworks National HighwaysCleared 2 days 16 hours ago
M27 eastbound Jct 3 exit slip lane closure
M27 eastbound Jct 3 exit slip lane closure
Cleared Roadworks National HighwaysCleared 3 days 16 hours ago
M27 eastbound Jct 3 exit slip lane closure
M27 eastbound lane 1 2 and 3 closure (13/0 to 14/3)
Cleared Roadworks National HighwaysCleared 4 days 7 hours ago
M27 eastbound lane 1 2 and 3 closure (13/0 to 14/3)
M3 southbound to M27 eastbound link road lane closure (117/4k to 118/3k)
Cleared Roadworks National HighwaysCleared 4 days 7 hours ago
M3 southbound to M27 eastbound link road lane closure (117/4k to 118/3k)