M27 eastbound Jct 3 exit slip lane closure
ClearedM27 eastbound Jct 3 exit slip lane closure
- Start time
- Mon, Aug 10, 2026 8:00 PM
- Expected end
- Tue, Aug 11, 2026 5:00 AM
- Duration
- 2 hours 5 minutes 2 seconds
- Road
- M27 – M27 J3 Eastbound Exit
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 1 closed, 1 of 2 lanes affected, 1 of 3 lanes affected
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jun 16, 2026 2:14 PM
- Last updated
- Mon, Aug 10, 2026 9:40 PM
- Cleared
- Mon, Aug 10, 2026 10:05 PM
- Latest update: M27 eastbound Jct 3 exit slip lane closure
- Coordinates
- 50.945614, -1.480040
- Latitude span
- 50.945100 – 50.946256
- Longitude span
- -1.483854 – -1.477422
- Bounding box centre
- 50.945678, -1.480638
- Location descriptions
-
- M27 J3 eastbound exit
- M27 eastbound between J2 and J3
- Feed validity status
- Planned
- Overall feed start
- Mon, Aug 10, 2026 8:00 PM
- Overall feed end
- Tue, Aug 11, 2026 5:00 AM
- Feed window length
- 9 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
17 coordinate pairs- Description
- M27 J3 eastbound exit
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 2 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {961C8060-70D5-46C5-AAFE-914D03455A40}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 463 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.945106 -1.48364 50.945162 -1.48255 50.945228 -1.481859 50.945348 -1.480993 50.945455 -1.480241 50.94555 -1.479677 50.945564 -1.479592 50.945654 -1.479121 50.945686 -1.478978 50.945804 -1.47845 50.945861 -1.478255 50.945928 -1.478022 50.945981 -1.477879 50.946035 -1.477764 50.94616 -1.477549 50.946195 -1.477492 50.946256 -1.477422
Segment 2
3 coordinate pairs- Description
- M27 eastbound between J2 and J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl1
- Lane Number
- 1
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M27
- Linear Element Model
- The Network Model
- Linear Element Id
- {AD7957AA-2AF5-48AD-9D7C-DBCABDA1F19E}
- Linear Element Type
- A Carriageway
- From Distance
- 6 m
- To Distance
- 21 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
50.9451 -1.483854 50.9451 -1.483824 50.945106 -1.48364
- Geometry type
- MultiLineString
- Geometry points
- 20
- First coordinate pair
- -1.483640, 50.945106
- Road section segments
- 1
- Road section points
- 20
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-1.48364,
50.945106
],
[
-1.48255,
50.945162
],
[
-1.481859,
50.945228
],
[
-1.480993,
50.945348
],
[
-1.480241,
50.945455
],
[
-1.479677,
50.94555
],
[
-1.479592,
50.945564
],
[
-1.479121,
50.945654
],
[
-1.478978,
50.945686
],
[
-1.47845,
50.945804
],
[
-1.478255,
50.945861
],
[
-1.478022,
50.945928
],
[
-1.477879,
50.945981
],
[
-1.477764,
50.946035
],
[
-1.477549,
50.94616
],
[
-1.477492,
50.946195
],
[
-1.477422,
50.946256
],
[
-1.483854,
50.9451
],
[
-1.483824,
50.9451
],
[
-1.48364,
50.945106
]
]
]
}
View road section coordinates
[
[
[
-1.48364,
50.945106
],
[
-1.48255,
50.945162
],
[
-1.481859,
50.945228
],
[
-1.480993,
50.945348
],
[
-1.480241,
50.945455
],
[
-1.479677,
50.94555
],
[
-1.479592,
50.945564
],
[
-1.479121,
50.945654
],
[
-1.478978,
50.945686
],
[
-1.47845,
50.945804
],
[
-1.478255,
50.945861
],
[
-1.478022,
50.945928
],
[
-1.477879,
50.945981
],
[
-1.477764,
50.946035
],
[
-1.477549,
50.94616
],
[
-1.477492,
50.946195
],
[
-1.477422,
50.946256
],
[
-1.483854,
50.9451
],
[
-1.483824,
50.9451
],
[
-1.48364,
50.945106
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 3
- Record created
- Tue, Jun 16, 2026 2:14 PM
- Record versioned
- Mon, Aug 10, 2026 9:40 PM
- Coordinate source
- Geometry
Driving on the M27? See every live closure, roadwork and planned restriction on this road.
M27 live closuresRelated incidents
M27 eastbound lane 1 and 2 closure (28.7 to 30.4 - )
Active Roadworks National HighwaysExpected to clear in 5 hours 23 minutes
M27 eastbound lane 1 and 2 closure (28.7 to 30.4 - )
M27 eastbound lane 1 and 2 closure (41/3 to 43/2)
Active Roadworks National HighwaysExpected to clear in 5 hours 23 minutes
M27 eastbound lane 1 and 2 closure (41/3 to 43/2)
M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
Active Roadworks National HighwaysExpected to clear in 1 month 2 weeks
M27 eastbound narrow lanes and lane 1 closure (34/7 to 39/7)
M27 eastbound lane 1 and 2 closure (28.7 to 30.4 - )
Cleared Roadworks National HighwaysCleared 3 hours 36 minutes ago
M27 eastbound lane 1 and 2 closure (28.7 to 30.4 - )
M27 eastbound Jct 1 entry slip road closure
Cleared Roadworks National HighwaysCleared 2 hours 36 minutes ago
M27 eastbound Jct 1 entry slip road closure
M27 eastbound lane 1 closure (1/9 to 2/7)
Cleared Roadworks National HighwaysCleared 6 minutes 26 seconds ago
M27 eastbound lane 1 closure (1/9 to 2/7)