M26 Eastbound M25 Jct 5 to Jct 2A hard shoulder closure
PlannedM26 Eastbound M25 Jct 5 to Jct 2A hard shoulder closure
- Start time
- Thu, Oct 29, 2026 10:00 PM
- Expected end
- Fri, Oct 30, 2026 5:30 AM
- Duration
- 7 hours 30 minutes
- Road
- M25 – M25 Anti-Clockwise Within J5
- Category
- Construction Work
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 29, 2026 12:11 PM
- Last updated
- Thu, Oct 29, 2026 11:58 PM
- Cleared
- Fri, Oct 30, 2026 5:30 AM
- Latest update: M26 Eastbound M25 Jct 5 to Jct 2A hard shoulder closure
- Coordinates
- 51.291156, 0.142066
- Latitude span
- 51.290917 – 51.291453
- Longitude span
- 0.141375 – 0.142909
- Bounding box centre
- 51.291185, 0.142142
- Location descriptions
-
- M25 anti-clockwise within J5
- Feed validity status
- Planned
- Overall feed start
- Thu, Oct 29, 2026 10:00 PM
- Overall feed end
- Fri, Oct 30, 2026 5:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M25 anti-clockwise within J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {DCB412B1-6860-4E5C-9D28-FD8EA23F5848}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 391 m
- To Distance
- 458 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.290917 0.141375 51.290934 0.141429 51.291207 0.142216
Segment 2
3 coordinate pairs- Description
- M25 anti-clockwise within J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {B1EDDFA4-7056-4018-892D-19C60F24B62A}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 55 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.291207 0.142216 51.291219 0.142249 51.291453 0.142909
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- 0.141375, 51.290917
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.141375,
51.290917
],
[
0.141429,
51.290934
],
[
0.142216,
51.291207
],
[
0.142216,
51.291207
],
[
0.142249,
51.291219
],
[
0.142909,
51.291453
]
]
]
}
View road section coordinates
[
[
[
0.141375,
51.290917
],
[
0.141429,
51.290934
],
[
0.142216,
51.291207
],
[
0.142216,
51.291207
],
[
0.142249,
51.291219
],
[
0.142909,
51.291453
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Oct 29, 2026 12:11 PM
- Record versioned
- Thu, Oct 29, 2026 11:58 PM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Clockwise Jct 26 to Jct 27 Lane 1,2 closure
Active Roadworks National HighwaysExpected to clear in 5 hours 28 minutes
M25 Clockwise Jct 26 to Jct 27 Lane 1,2 closure
M25 Anti-clockwise Jct 4 entry slip road lane 1 closure
Active Roadworks National HighwaysExpected to clear in 5 hours 28 minutes
M25 Anti-clockwise Jct 4 entry slip road lane 1 closure
M25 Anti-Clockwise Jct 20 Entry Slip Road Lane 1 Closure
Planned Roadworks National HighwaysStarts in 22 hours 58 minutes
M25 Anti-Clockwise Jct 20 Entry Slip Road Lane 1 Closure
A20 Eastbound Crittalls Corner to Swanley Interchange lane 3 closure
Planned Roadworks National HighwaysStarts in 22 hours 58 minutes
A20 Eastbound Crittalls Corner to Swanley Interchange lane 3 closure
M25 Anti-Clockwise Jct 9 to Jct 8 lane 4,3 closure
Planned Roadworks National HighwaysStarts in 22 hours 58 minutes
M25 Anti-Clockwise Jct 9 to Jct 8 lane 4,3 closure
M25 Anti-clockwise Jct 6 to Jct 5 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 22 hours 58 minutes
M25 Anti-clockwise Jct 6 to Jct 5 lane 1,2 closure