M26 Eastbound M25 Jct 5 to Jct 2A carriageway closure
ClearedM26 Eastbound M25 Jct 5 to Jct 2A carriageway closure
- Start time
- Tue, Jul 14, 2026 9:25 PM
- Expected end
- Wed, Jul 15, 2026 4:30 AM
- Duration
- 5 hours 15 minutes 1 second
- Road
- M25 – M25 Anti-Clockwise Between J6 And J5
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jul 14, 2026 9:28 PM
- Last updated
- Wed, Jul 15, 2026 2:24 AM
- Cleared
- Wed, Jul 15, 2026 2:40 AM
- Latest update: M26 Eastbound M25 Jct 5 to Jct 2A carriageway closure
- Coordinates
- 51.290196, 0.138851
- Latitude span
- 51.289224 – 51.291467
- Longitude span
- 0.135312 – 0.142949
- Bounding box centre
- 51.290346, 0.139131
- Location descriptions
-
- M25 anti-clockwise between J6 and J5
- M25 anti-clockwise within J5
- Feed validity status
- Active
- Overall feed start
- Tue, Jul 14, 2026 9:25 PM
- Overall feed end
- Wed, Jul 15, 2026 4:30 AM
- Feed window length
- 7 hours 5 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M25 anti-clockwise between J6 and J5
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {8EEA69A0-4A7B-421E-8E4C-F76BC16ABDC0}
- Linear Element Type
- B Carriageway
- From Distance
- 339 m
- To Distance
- 412 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.289224 0.135312 51.289254 0.135428 51.289464 0.136255 51.289463 0.136283
Segment 2
10 coordinate pairs- Description
- M25 anti-clockwise within J5
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 3 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {DCB412B1-6860-4E5C-9D28-FD8EA23F5848}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 458 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.289463 0.136283 51.289477 0.136514 51.289485 0.136571 51.289755 0.137545 51.290034 0.138519 51.290322 0.139458 51.29062 0.140425 51.290738 0.140818 51.290934 0.141429 51.291207 0.142216
Segment 3
3 coordinate pairs- Description
- M25 anti-clockwise within J5
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 5 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {B1EDDFA4-7056-4018-892D-19C60F24B62A}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 58 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.291207 0.142216 51.291219 0.142249 51.291467 0.142949
- Geometry type
- MultiLineString
- Geometry points
- 17
- First coordinate pair
- 0.135312, 51.289224
- Road section segments
- 1
- Road section points
- 17
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.135312,
51.289224
],
[
0.135428,
51.289254
],
[
0.136255,
51.289464
],
[
0.136283,
51.289463
],
[
0.136283,
51.289463
],
[
0.136514,
51.289477
],
[
0.136571,
51.289485
],
[
0.137545,
51.289755
],
[
0.138519,
51.290034
],
[
0.139458,
51.290322
],
[
0.140425,
51.29062
],
[
0.140818,
51.290738
],
[
0.141429,
51.290934
],
[
0.142216,
51.291207
],
[
0.142216,
51.291207
],
[
0.142249,
51.291219
],
[
0.142949,
51.291467
]
]
]
}
View road section coordinates
[
[
[
0.135312,
51.289224
],
[
0.135428,
51.289254
],
[
0.136255,
51.289464
],
[
0.136283,
51.289463
],
[
0.136283,
51.289463
],
[
0.136514,
51.289477
],
[
0.136571,
51.289485
],
[
0.137545,
51.289755
],
[
0.138519,
51.290034
],
[
0.139458,
51.290322
],
[
0.140425,
51.29062
],
[
0.140818,
51.290738
],
[
0.141429,
51.290934
],
[
0.142216,
51.291207
],
[
0.142216,
51.291207
],
[
0.142249,
51.291219
],
[
0.142949,
51.291467
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jul 14, 2026 9:28 PM
- Record versioned
- Wed, Jul 15, 2026 2:24 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-clockwise Jct 10 exit slip road closure
Planned Roadworks National HighwaysStarts in 3 hours 29 minutes
M25 Anti-clockwise Jct 10 exit slip road closure
M25 Anti-Clockwise Jct 11 Entry Slip Road lane 2 closure
Planned Roadworks National HighwaysStarts in 3 hours 29 minutes
M25 Anti-Clockwise Jct 11 Entry Slip Road lane 2 closure
M25 anti clockwise Jct 20 entry slip road closure
Cleared Roadworks National HighwaysExpected to clear in 10 hours 59 minutes
M25 anti clockwise Jct 20 entry slip road closure
M25 Clockwise Jct 4 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 3 hours 29 minutes
M25 Clockwise Jct 4 exit slip road lane 1 closure
M25 Anti-clockwise Jct 7 to Jct 6 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 3 hours 29 minutes
M25 Anti-clockwise Jct 7 to Jct 6 lane 1,2 closure
M25 Clockwise Jct 24 to Jct 25 lane 2,3,4 closure
Planned Roadworks National HighwaysStarts in 3 hours 29 minutes
M25 Clockwise Jct 24 to Jct 25 lane 2,3,4 closure