M25 Jct 2 entry slip road closure
ClearedM25 Jct 2 entry slip road closure
- Start time
- Wed, Aug 19, 2026 9:05 PM
- Expected end
- Thu, Aug 20, 2026 4:30 AM
- Duration
- 2 hours 50 minutes 1 second
- Road
- M25 – M25 J2 Clockwise Access
- Category
- Road Maintenance
- Direction
- Clockwise
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Aug 19, 2026 9:08 PM
- Last updated
- Wed, Aug 19, 2026 11:19 PM
- Cleared
- Wed, Aug 19, 2026 11:55 PM
- Latest update: M25 Jct 2 entry slip road closure
- Coordinates
- 51.424517, 0.237852
- Latitude span
- 51.423257 – 51.425366
- Longitude span
- 0.236510 – 0.238698
- Bounding box centre
- 51.424312, 0.237604
- Location descriptions
-
- M25 J2 clockwise access
- Feed validity status
- Active
- Overall feed start
- Wed, Aug 19, 2026 9:05 PM
- Overall feed end
- Thu, Aug 20, 2026 4:30 AM
- Feed window length
- 7 hours 25 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M25 J2 clockwise access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {EB0020C6-A7F1-4746-BA79-DB474800CDEA}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 180 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.424606 0.23794 51.424153 0.237498 51.42388 0.237263 51.423486 0.236866 51.423257 0.23651
Segment 2
5 coordinate pairs- Description
- M25 J2 clockwise access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E33EAA2-4D52-4D07-94AB-A627BFC6B53F}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 27 m
- To Distance
- 126 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.425366 0.238698 51.425362 0.238694 51.42534 0.23867 51.425116 0.238437 51.424606 0.23794
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- 0.237940, 51.424606
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.23794,
51.424606
],
[
0.237498,
51.424153
],
[
0.237263,
51.42388
],
[
0.236866,
51.423486
],
[
0.23651,
51.423257
],
[
0.238698,
51.425366
],
[
0.238694,
51.425362
],
[
0.23867,
51.42534
],
[
0.238437,
51.425116
],
[
0.23794,
51.424606
]
]
]
}
View road section coordinates
[
[
[
0.23794,
51.424606
],
[
0.237498,
51.424153
],
[
0.237263,
51.42388
],
[
0.236866,
51.423486
],
[
0.23651,
51.423257
],
[
0.238698,
51.425366
],
[
0.238694,
51.425362
],
[
0.23867,
51.42534
],
[
0.238437,
51.425116
],
[
0.23794,
51.424606
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Wed, Aug 19, 2026 9:08 PM
- Record versioned
- Wed, Aug 19, 2026 11:19 PM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-clockwise Jct 3 to Jct 2 lane 1,2 closure
Active Roadworks National HighwaysExpected to clear in 3 hours 57 minutes
M25 Anti-clockwise Jct 3 to Jct 2 lane 1,2 closure
A2 Eastbound Bexley Heath to Darenth Interchange lane 1,2 closure
Planned Roadworks National HighwaysStarts in 20 hours 27 minutes
A2 Eastbound Bexley Heath to Darenth Interchange lane 1,2 closure
M25 Anti-Clockwise Jct 16 to Jct 15 Lane 4 Closure
Cleared Roadworks National HighwaysCleared 12 minutes 17 seconds ago
M25 Anti-Clockwise Jct 16 to Jct 15 Lane 4 Closure
M25 Clockwise Jct 2 to Jct 3 carriageway closure
Cleared Roadworks National HighwaysCleared 12 minutes 17 seconds ago
M25 Clockwise Jct 2 to Jct 3 carriageway closure
A2 Westbound Darenth Interchange to M25 Clockwise Jct 2 link road closure
Cleared Roadworks National HighwaysCleared 3 hours 32 minutes ago
A2 Westbound Darenth Interchange to M25 Clockwise Jct 2 link road closure
M25 Clockwise Jct 24 to Jct 25 lane closure
Cleared Roadworks National HighwaysCleared 1 hour 12 minutes ago
M25 Clockwise Jct 24 to Jct 25 lane closure