M25 Jct 2 entry slip road closure
PlannedM25 Jct 2 entry slip road closure
- Start time
- Mon, Aug 17, 2026 9:00 PM
- Expected end
- Tue, Aug 18, 2026 4:30 AM
- Duration
- 7 hours 30 minutes
- Road
- M25 – M25 J2 Clockwise Access
- Category
- Road Maintenance
- Direction
- Clockwise
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, May 1, 2026 9:25 AM
- Last updated
- Mon, Aug 17, 2026 2:35 AM
- Cleared
- Tue, Aug 18, 2026 4:30 AM
- Latest update: M25 Jct 2 entry slip road closure
- Coordinates
- 51.424517, 0.237852
- Latitude span
- 51.423257 – 51.425366
- Longitude span
- 0.236510 – 0.238698
- Bounding box centre
- 51.424312, 0.237604
- Location descriptions
-
- M25 J2 clockwise access
- Feed validity status
- Planned
- Overall feed start
- Mon, Aug 17, 2026 9:00 PM
- Overall feed end
- Tue, Aug 18, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M25 J2 clockwise access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {EB0020C6-A7F1-4746-BA79-DB474800CDEA}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 180 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.424606 0.23794 51.424153 0.237498 51.42388 0.237263 51.423486 0.236866 51.423257 0.23651
Segment 2
5 coordinate pairs- Description
- M25 J2 clockwise access
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {2E33EAA2-4D52-4D07-94AB-A627BFC6B53F}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 27 m
- To Distance
- 126 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.425366 0.238698 51.425362 0.238694 51.42534 0.23867 51.425116 0.238437 51.424606 0.23794
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- 0.237940, 51.424606
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.23794,
51.424606
],
[
0.237498,
51.424153
],
[
0.237263,
51.42388
],
[
0.236866,
51.423486
],
[
0.23651,
51.423257
],
[
0.238698,
51.425366
],
[
0.238694,
51.425362
],
[
0.23867,
51.42534
],
[
0.238437,
51.425116
],
[
0.23794,
51.424606
]
]
]
}
View road section coordinates
[
[
[
0.23794,
51.424606
],
[
0.237498,
51.424153
],
[
0.237263,
51.42388
],
[
0.236866,
51.423486
],
[
0.23651,
51.423257
],
[
0.238698,
51.425366
],
[
0.238694,
51.425362
],
[
0.23867,
51.42534
],
[
0.238437,
51.425116
],
[
0.23794,
51.424606
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, May 1, 2026 9:25 AM
- Record versioned
- Mon, Aug 17, 2026 2:35 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-clockwise Jct 30 to Jct 29 Hard shoulder closure
Planned Roadworks National HighwaysExpected to clear in 7 months 2 weeks
M25 Anti-clockwise Jct 30 to Jct 29 Hard shoulder closure
M25 Anticlockwise Jct 13 to Jct 11 Carriageway Closure
Planned Roadworks National HighwaysStarts in 18 hours 9 minutes
M25 Anticlockwise Jct 13 to Jct 11 Carriageway Closure
M25 Clockwise Jct 2 to Jct 3 carriageway closure
Planned Roadworks National HighwaysStarts in 18 hours 9 minutes
M25 Clockwise Jct 2 to Jct 3 carriageway closure
M25 Clockwise Jct 24 to Jct 25 lane closure
Planned Roadworks National HighwaysStarts in 18 hours 9 minutes
M25 Clockwise Jct 24 to Jct 25 lane closure
A2 Westbound Darenth Interchange to M25 Clockwise Jct 2 link road closure
Planned Roadworks National HighwaysStarts in 18 hours 9 minutes
A2 Westbound Darenth Interchange to M25 Clockwise Jct 2 link road closure
M25 Anti-clockwise Jct 9 to Jct 8 Lane 1,2 closure
Planned Roadworks National HighwaysStarts in 18 hours 9 minutes
M25 Anti-clockwise Jct 9 to Jct 8 Lane 1,2 closure