M25 Jct 13 roundabout lane 1 closure
ClearedM25 Jct 13 roundabout lane 1 closure
- Start time
- Fri, Jul 31, 2026 10:00 PM
- Expected end
- Sat, Aug 1, 2026 4:30 AM
- Duration
- 4 hours 15 minutes 2 seconds
- Road
- A30 – Roundabout At M25 J13/A30
- Category
- Road Maintenance
- Direction
- Clockwise
- Lanes affected
- 2 of 1 lanes affected
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Jul 31, 2026 9:46 PM
- Last updated
- Sat, Aug 1, 2026 2:02 AM
- Cleared
- Sat, Aug 1, 2026 2:15 AM
- Latest update: M25 Jct 13 roundabout lane 1 closure
- Coordinates
- 51.444578, -0.530573
- Latitude span
- 51.444192 – 51.444916
- Longitude span
- -0.530669 – -0.530368
- Bounding box centre
- 51.444554, -0.530519
- Location descriptions
-
- roundabout at M25 J13/A30
- Feed validity status
- Active
- Overall feed start
- Fri, Jul 31, 2026 10:00 PM
- Overall feed end
- Sat, Aug 1, 2026 4:30 AM
- Feed window length
- 6 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- roundabout at M25 J13/A30
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {247B9409-48F8-489D-A2AE-7598F334FEAB}
- Linear Element Type
- Other
- From Distance
- 24 m
- To Distance
- 45 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.444192 -0.530623 51.444258 -0.530647 51.444384 -0.530657
Segment 2
9 coordinate pairs- Description
- roundabout at M25 J13/A30
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {2EBB97B9-F2D2-4ED8-BAFC-30CE225F8308}
- Linear Element Type
- Other
- From Distance
- 0 m
- To Distance
- 64 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.444384 -0.530657 51.444465 -0.530669 51.444528 -0.530653 51.444617 -0.530621 51.444707 -0.530575 51.444778 -0.530515 51.444822 -0.530485 51.444884 -0.530411 51.444916 -0.530368
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- -0.530623, 51.444192
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.530623,
51.444192
],
[
-0.530647,
51.444258
],
[
-0.530657,
51.444384
],
[
-0.530657,
51.444384
],
[
-0.530669,
51.444465
],
[
-0.530653,
51.444528
],
[
-0.530621,
51.444617
],
[
-0.530575,
51.444707
],
[
-0.530515,
51.444778
],
[
-0.530485,
51.444822
],
[
-0.530411,
51.444884
],
[
-0.530368,
51.444916
]
]
]
}
View road section coordinates
[
[
[
-0.530623,
51.444192
],
[
-0.530647,
51.444258
],
[
-0.530657,
51.444384
],
[
-0.530657,
51.444384
],
[
-0.530669,
51.444465
],
[
-0.530653,
51.444528
],
[
-0.530621,
51.444617
],
[
-0.530575,
51.444707
],
[
-0.530515,
51.444778
],
[
-0.530485,
51.444822
],
[
-0.530411,
51.444884
],
[
-0.530368,
51.444916
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Jul 31, 2026 9:46 PM
- Record versioned
- Sat, Aug 1, 2026 2:02 AM
- Coordinate source
- Geometry
Driving on the A30? See every live closure, roadwork and planned restriction on this road.
A30 live closuresRelated incidents
A30 Marwood Cross EB 2 VRS repair
Active Roadworks National HighwaysExpected to clear in 9 minutes 32 seconds
A30 Marwood Cross EB 2 VRS repair
M25 Anti-Clockwise Jct 12 to Jct 11 lane 4,3,2 closure
Planned Roadworks National HighwaysStarts in 6 hours 9 minutes
M25 Anti-Clockwise Jct 12 to Jct 11 lane 4,3,2 closure
Eastbound lane 2 closed 45/6B to 46/4B
Planned Roadworks National HighwaysStarts in 4 hours 9 minutes
Eastbound lane 2 closed 45/6B to 46/4B
A30 eastbound Avers to Chiverton Cross carriageway closure
Planned Roadworks National HighwaysStarts in 4 hours 9 minutes
A30 eastbound Avers to Chiverton Cross carriageway closure
A30 westbound Sourton Down to Lifton Down lane closure 144/6-144/0
Planned Roadworks National HighwaysStarts in 3 hours 9 minutes
A30 westbound Sourton Down to Lifton Down lane closure 144/6-144/0
A30 eastbound Stowford Cross to Sourton Cross lane closure 149/4-151/9
Planned Roadworks National HighwaysStarts in 3 hours 9 minutes
A30 eastbound Stowford Cross to Sourton Cross lane closure 149/4-151/9