M25 Eastbound Hewitts Roundabout to Jct 4 hard shoulder closure
ClearedM25 Eastbound Hewitts Roundabout to Jct 4 hard shoulder closure
- Start time
- Mon, Oct 27, 2025 9:30 AM
- Expected end
- Mon, Oct 27, 2025 4:00 PM
- Duration
- 6 hours 30 minutes
- Road
- M25 – M25 Spur (Orpington) Eastbound Between A224 And M25
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 27, 2025 11:37 AM
- Last updated
- Mon, Oct 27, 2025 3:21 PM
- Cleared
- Mon, Oct 27, 2025 4:00 PM
- Latest update: M25 Eastbound Hewitts Roundabout to Jct 4 hard shoulder closure
- Coordinates
- 51.346619, 0.140534
- Latitude span
- 51.345937 – 51.346965
- Longitude span
- 0.137432 – 0.145813
- Bounding box centre
- 51.346451, 0.141623
- Location descriptions
-
- M25 spur (Orpington) eastbound between A224 and M25
- M25 spur (Orpington) westbound between M25 and A224
- Feed validity status
- Active
- Overall feed start
- Mon, Oct 27, 2025 9:30 AM
- Overall feed end
- Mon, Oct 27, 2025 4:00 PM
- Feed window length
- 6 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- M25 spur (Orpington) eastbound between A224 and M25
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {A399957D-2EDD-40F8-8961-1AED8938F212}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 171 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.346252 0.143403 51.346098 0.144444 51.345993 0.145258 51.345937 0.145813
Segment 2
6 coordinate pairs- Description
- M25 spur (Orpington) eastbound between A224 and M25
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {B3B769B3-FDA9-4A71-8AE6-1D4412E1FCAD}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 23 m
- To Distance
- 84 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.346965 0.137432 51.346954 0.137491 51.346924 0.137633 51.346883 0.137933 51.346881 0.138019 51.346876 0.138297
Segment 3
11 coordinate pairs- Description
- M25 spur (Orpington) westbound between M25 and A224
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {BC0C459A-47EE-4F4A-A787-B6ED623E3888}
- Linear Element Type
- B Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 363 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.346876 0.138297 51.346871 0.138578 51.346822 0.139294 51.346788 0.139651 51.346745 0.140052 51.346704 0.140337 51.346632 0.140836 51.346569 0.141336 51.346487 0.141835 51.346487 0.141863 51.346252 0.143403
- Geometry type
- MultiLineString
- Geometry points
- 21
- First coordinate pair
- 0.143403, 51.346252
- Road section segments
- 1
- Road section points
- 21
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.143403,
51.346252
],
[
0.144444,
51.346098
],
[
0.145258,
51.345993
],
[
0.145813,
51.345937
],
[
0.137432,
51.346965
],
[
0.137491,
51.346954
],
[
0.137633,
51.346924
],
[
0.137933,
51.346883
],
[
0.138019,
51.346881
],
[
0.138297,
51.346876
],
[
0.138297,
51.346876
],
[
0.138578,
51.346871
],
[
0.139294,
51.346822
],
[
0.139651,
51.346788
],
[
0.140052,
51.346745
],
[
0.140337,
51.346704
],
[
0.140836,
51.346632
],
[
0.141336,
51.346569
],
[
0.141835,
51.346487
],
[
0.141863,
51.346487
],
[
0.143403,
51.346252
]
]
]
}
View road section coordinates
[
[
[
0.143403,
51.346252
],
[
0.144444,
51.346098
],
[
0.145258,
51.345993
],
[
0.145813,
51.345937
],
[
0.137432,
51.346965
],
[
0.137491,
51.346954
],
[
0.137633,
51.346924
],
[
0.137933,
51.346883
],
[
0.138019,
51.346881
],
[
0.138297,
51.346876
],
[
0.138297,
51.346876
],
[
0.138578,
51.346871
],
[
0.139294,
51.346822
],
[
0.139651,
51.346788
],
[
0.140052,
51.346745
],
[
0.140337,
51.346704
],
[
0.140836,
51.346632
],
[
0.141336,
51.346569
],
[
0.141835,
51.346487
],
[
0.141863,
51.346487
],
[
0.143403,
51.346252
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 27, 2025 11:37 AM
- Record versioned
- Mon, Oct 27, 2025 3:21 PM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure
Planned Roadworks National HighwaysStarts in 16 hours 36 minutes
M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure
M25 Anti-clockwise Jct 5 to A21 Southbound Chipstead link road closure
Cleared Roadworks National HighwaysCleared 5 hours 28 minutes ago
M25 Anti-clockwise Jct 5 to A21 Southbound Chipstead link road closure
M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure
Cleared Roadworks National HighwaysCleared 1 day 6 hours ago
M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
Cleared Roadworks National HighwaysCleared 23 hours 53 minutes ago
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
M25 Anti-clockwise Jct 3 entry slip road closure
Cleared Roadworks National HighwaysCleared 1 day 6 hours ago
M25 Anti-clockwise Jct 3 entry slip road closure
M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure
Cleared Roadworks National HighwaysCleared 23 hours 53 minutes ago
M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure