M25 Clockwise Jct 31 entry slip road closure
ClearedM25 Clockwise Jct 31 entry slip road closure
- Start time
- Sat, Nov 21, 2026 10:30 PM
- Expected end
- Sun, Nov 22, 2026 5:30 AM
- Duration
- 7 hours
- Road
- A282 – A282 Southbound Dartford Crossing
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Feb 26, 2026 8:41 AM
- Last updated
- Sun, Nov 22, 2026 5:24 AM
- Cleared
- Sun, Nov 22, 2026 5:30 AM
- Latest update: M25 Clockwise Jct 31 entry slip road closure
- Coordinates
- 51.484904, 0.267629
- Latitude span
- 51.483482 – 51.486809
- Longitude span
- 0.267264 – 0.268146
- Bounding box centre
- 51.485146, 0.267705
- Location descriptions
-
- A282 southbound Dartford Crossing
- M25 J31 clockwise access
- Feed validity status
- Planned
- Overall feed start
- Sat, Nov 21, 2026 10:30 PM
- Overall feed end
- Sun, Nov 22, 2026 5:30 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A282 southbound Dartford Crossing
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A282
- Linear Element Model
- The Network Model
- Linear Element Id
- {F791E0CE-431B-4455-8941-E4B1EEE53E95}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 67 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.484085 0.26738 51.483851 0.26734 51.48377 0.267327 51.483482 0.267264
Segment 2
8 coordinate pairs- Description
- M25 J31 clockwise access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A282
- Linear Element Model
- The Network Model
- Linear Element Id
- {D5000AC5-A071-49BD-98C7-015D01A20D83}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 18 m
- To Distance
- 327 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.486809 0.268146 51.486509 0.268019 51.486304 0.267951 51.485936 0.267878 51.485121 0.267715 51.484485 0.267587 51.484405 0.267555 51.484085 0.26738
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- 0.267380, 51.484085
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.26738,
51.484085
],
[
0.26734,
51.483851
],
[
0.267327,
51.48377
],
[
0.267264,
51.483482
],
[
0.268146,
51.486809
],
[
0.268019,
51.486509
],
[
0.267951,
51.486304
],
[
0.267878,
51.485936
],
[
0.267715,
51.485121
],
[
0.267587,
51.484485
],
[
0.267555,
51.484405
],
[
0.26738,
51.484085
]
]
]
}
View road section coordinates
[
[
[
0.26738,
51.484085
],
[
0.26734,
51.483851
],
[
0.267327,
51.48377
],
[
0.267264,
51.483482
],
[
0.268146,
51.486809
],
[
0.268019,
51.486509
],
[
0.267951,
51.486304
],
[
0.267878,
51.485936
],
[
0.267715,
51.485121
],
[
0.267587,
51.484485
],
[
0.267555,
51.484405
],
[
0.26738,
51.484085
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Thu, Feb 26, 2026 8:41 AM
- Record versioned
- Sun, Nov 22, 2026 5:24 AM
- Coordinate source
- Geometry
Driving on the A282? See every live closure, roadwork and planned restriction on this road.
A282 live closuresRelated incidents
M25 Jct 30 entry slip closure
Planned Roadworks National HighwaysStarts in 13 hours 27 minutes
M25 Jct 30 entry slip closure
A282 Jct 1A Carriageway, entry and exit slip road closure
Cleared Roadworks National HighwaysCleared 4 hours 7 minutes ago
A282 Jct 1A Carriageway, entry and exit slip road closure
A282 Southbound Jct 1B to Jct 2 link road closure
Cleared Roadworks National HighwaysCleared 1 day 3 hours ago
A282 Southbound Jct 1B to Jct 2 link road closure
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 3,2 Closure
Cleared Roadworks National HighwaysCleared 1 day 3 hours ago
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 3,2 Closure
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 1,2 Closure
Cleared Roadworks National HighwaysCleared 1 day 3 hours ago
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 1,2 Closure
A282 Northbound Dartford Crossing West Tunnel closure
Cleared Roadworks National HighwaysCleared 1 day 5 hours ago
A282 Northbound Dartford Crossing West Tunnel closure