M25 Clockwise Jct 31 entry slip road closure
ClearedM25 Clockwise Jct 31 entry slip road closure
- Start time
- Sun, Oct 19, 2025 9:30 PM
- Expected end
- Mon, Oct 20, 2025 4:30 AM
- Duration
- 7 hours
- Road
- A282 – A282 Southbound Dartford Crossing
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Sun, Oct 19, 2025 9:26 PM
- Last updated
- Mon, Oct 20, 2025 1:46 AM
- Cleared
- Mon, Oct 20, 2025 4:30 AM
- Latest update: M25 Clockwise Jct 31 entry slip road closure
- Coordinates
- 51.484904, 0.267629
- Latitude span
- 51.483482 – 51.486809
- Longitude span
- 0.267264 – 0.268146
- Bounding box centre
- 51.485146, 0.267705
- Location descriptions
-
- A282 southbound Dartford Crossing
- M25 J31 clockwise access
- Feed validity status
- Active
- Overall feed start
- Sun, Oct 19, 2025 9:30 PM
- Overall feed end
- Mon, Oct 20, 2025 4:30 AM
- Feed window length
- 7 hours
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
4 coordinate pairs- Description
- A282 southbound Dartford Crossing
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A282
- Linear Element Model
- The Network Model
- Linear Element Id
- {F791E0CE-431B-4455-8941-E4B1EEE53E95}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 67 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.484085 0.26738 51.483851 0.26734 51.48377 0.267327 51.483482 0.267264
Segment 2
8 coordinate pairs- Description
- M25 J31 clockwise access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A282
- Linear Element Model
- The Network Model
- Linear Element Id
- {D5000AC5-A071-49BD-98C7-015D01A20D83}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 18 m
- To Distance
- 327 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.486809 0.268146 51.486509 0.268019 51.486304 0.267951 51.485936 0.267878 51.485121 0.267715 51.484485 0.267587 51.484405 0.267555 51.484085 0.26738
- Geometry type
- MultiLineString
- Geometry points
- 12
- First coordinate pair
- 0.267380, 51.484085
- Road section segments
- 1
- Road section points
- 12
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.26738,
51.484085
],
[
0.26734,
51.483851
],
[
0.267327,
51.48377
],
[
0.267264,
51.483482
],
[
0.268146,
51.486809
],
[
0.268019,
51.486509
],
[
0.267951,
51.486304
],
[
0.267878,
51.485936
],
[
0.267715,
51.485121
],
[
0.267587,
51.484485
],
[
0.267555,
51.484405
],
[
0.26738,
51.484085
]
]
]
}
View road section coordinates
[
[
[
0.26738,
51.484085
],
[
0.26734,
51.483851
],
[
0.267327,
51.48377
],
[
0.267264,
51.483482
],
[
0.268146,
51.486809
],
[
0.268019,
51.486509
],
[
0.267951,
51.486304
],
[
0.267878,
51.485936
],
[
0.267715,
51.485121
],
[
0.267587,
51.484485
],
[
0.267555,
51.484405
],
[
0.26738,
51.484085
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Sun, Oct 19, 2025 9:26 PM
- Record versioned
- Mon, Oct 20, 2025 1:46 AM
- Coordinate source
- Geometry
Driving on the A282? See every live closure, roadwork and planned restriction on this road.
A282 live closuresRelated incidents
A282 Northbound Dartford Crossing West Tunnel closure
Cleared Roadworks National HighwaysCleared 9 hours 13 minutes ago
A282 Northbound Dartford Crossing West Tunnel closure
A282 Northbound Dartford Crossing West Tunnel closure
Cleared Roadworks National HighwaysCleared 1 day 10 hours ago
A282 Northbound Dartford Crossing West Tunnel closure
A282 Northbound Dartford Crossing West Tunnel closure
Cleared Roadworks National HighwaysCleared 2 days 10 hours ago
A282 Northbound Dartford Crossing West Tunnel closure
A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m
Cleared Roadworks National HighwaysCleared 3 days 9 hours ago
A282 Northbound Dartford Crossing East Tunnel closure No access over Dartford Crossing for vehicles over 4.8m
A13 Eastbound Stifford Interchange to A1089 Southbound Baker Street link road closure
Cleared Roadworks National HighwaysCleared 3 days 8 hours ago
A13 Eastbound Stifford Interchange to A1089 Southbound Baker Street link road closure
A13 Eastbound Stifford Interchange to Baker Street lane 1,2 closure
Cleared Roadworks National HighwaysCleared 3 days 11 hours ago
A13 Eastbound Stifford Interchange to Baker Street lane 1,2 closure