M25 Clockwise Jct 30 entry slip road closure
ClearedM25 Clockwise Jct 30 entry slip road closure
- Start time
- Thu, Nov 12, 2026 10:19 PM
- Expected end
- Fri, Nov 13, 2026 5:30 AM
- Duration
- 5 hours 51 minutes 1 second
- Road
- A13 – M25 Clockwise Distributor J30 To J31
- Category
- Construction Work
- Direction
- Southbound
- Carriageway
- Dual Carriageway
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Nov 12, 2026 10:20 PM
- Last updated
- Fri, Nov 13, 2026 3:56 AM
- Cleared
- Fri, Nov 13, 2026 4:10 AM
- Latest update: M25 Clockwise Jct 30 entry slip road closure
- Coordinates
- 51.494229, 0.269227
- Latitude span
- 51.491608 – 51.496597
- Longitude span
- 0.268437 – 0.269731
- Bounding box centre
- 51.494103, 0.269084
- Location descriptions
-
- M25 clockwise distributor J30 to J31
- M25 J30 clockwise access
- Feed validity status
- Active
- Overall feed start
- Thu, Nov 12, 2026 10:19 PM
- Overall feed end
- Fri, Nov 13, 2026 5:30 AM
- Feed window length
- 7 hours 11 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M25 clockwise distributor J30 to J31
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- South Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A13
- Linear Element Model
- The Network Model
- Linear Element Id
- {4185FFF5-600C-45DA-A3D1-7B635D636A45}
- Linear Element Type
- Other
- From Distance
- 32 m
- To Distance
- 91 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.496597 0.269731 51.496523 0.269683 51.496425 0.269635 51.496299 0.2696 51.496156 0.269579 51.496084 0.269564
Segment 2
7 coordinate pairs- Description
- M25 J30 clockwise access
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- A282
- Linear Element Model
- The Network Model
- Linear Element Id
- {3FB29A78-5775-41CA-B9B7-A662470CC253}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 153 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.492909 0.269171 51.492828 0.269125 51.492775 0.269065 51.492713 0.269019 51.492259 0.268794 51.491796 0.268541 51.491608 0.268437
- Geometry type
- MultiLineString
- Geometry points
- 13
- First coordinate pair
- 0.269731, 51.496597
- Road section segments
- 1
- Road section points
- 13
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.269731,
51.496597
],
[
0.269683,
51.496523
],
[
0.269635,
51.496425
],
[
0.2696,
51.496299
],
[
0.269579,
51.496156
],
[
0.269564,
51.496084
],
[
0.269171,
51.492909
],
[
0.269125,
51.492828
],
[
0.269065,
51.492775
],
[
0.269019,
51.492713
],
[
0.268794,
51.492259
],
[
0.268541,
51.491796
],
[
0.268437,
51.491608
]
]
]
}
View road section coordinates
[
[
[
0.269731,
51.496597
],
[
0.269683,
51.496523
],
[
0.269635,
51.496425
],
[
0.2696,
51.496299
],
[
0.269579,
51.496156
],
[
0.269564,
51.496084
],
[
0.269171,
51.492909
],
[
0.269125,
51.492828
],
[
0.269065,
51.492775
],
[
0.269019,
51.492713
],
[
0.268794,
51.492259
],
[
0.268541,
51.491796
],
[
0.268437,
51.491608
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Nov 12, 2026 10:20 PM
- Record versioned
- Fri, Nov 13, 2026 3:56 AM
- Coordinate source
- Geometry
Driving on the A13? See every live closure, roadwork and planned restriction on this road.
A13 live closuresRelated incidents
M25 Jct 30 entry slip closure
Planned Roadworks National HighwaysStarts in 12 hours 59 minutes
M25 Jct 30 entry slip closure
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 3,2 Closure
Cleared Roadworks National HighwaysCleared 1 day 3 hours ago
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 3,2 Closure
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 1,2 Closure
Cleared Roadworks National HighwaysCleared 1 day 3 hours ago
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 1,2 Closure
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 1,2 Closure
Cleared Roadworks National HighwaysCleared 2 days 5 hours ago
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 1,2 Closure
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 3,2 Closure
Cleared Roadworks National HighwaysCleared 2 days 9 hours ago
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 3,2 Closure
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 3,2 Closure
Cleared Roadworks National HighwaysCleared 3 days 7 hours ago
A13 Eastbound Stifford Interchange to A13 Eastbound Baker Street Lane 3,2 Closure