M25 Clockwise Jct 3 exit slip road closure
PlannedM25 Clockwise Jct 3 exit slip road closure
- Start time
- Thu, Nov 6, 2025 10:00 PM
- Expected end
- Fri, Nov 7, 2025 5:30 AM
- Duration
- 7 hours 30 minutes
- Road
- M25 – M25 Clockwise Within J3 Before A20 Roundabout Access
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Reason
- Repair Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Oct 6, 2025 11:41 AM
- Last updated
- Thu, Nov 6, 2025 9:38 PM
- Cleared
- Fri, Nov 7, 2025 5:30 AM
- Latest update: M25 Clockwise Jct 3 exit slip road closure
- Coordinates
- 51.391398, 0.196056
- Latitude span
- 51.389297 – 51.393482
- Longitude span
- 0.194918 – 0.197530
- Bounding box centre
- 51.391390, 0.196224
- Location descriptions
-
- M25 clockwise within J3 before A20 roundabout access
- M25 J3 clockwise exit
- Feed validity status
- Planned
- Overall feed start
- Thu, Nov 6, 2025 10:00 PM
- Overall feed end
- Fri, Nov 7, 2025 5:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M25 clockwise within J3 before A20 roundabout access
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {803AE7D4-796A-4D8E-9FF4-BF1D4C06FEAB}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 7 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.391255 0.195844 51.391228 0.195825 51.39119 0.195798
Segment 2
10 coordinate pairs- Description
- M25 J3 clockwise exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {2BB7BE02-5DA4-4B99-B421-0BE5BCF966FF}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 221 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.39119 0.195798 51.391085 0.195818 51.391004 0.195832 51.390461 0.195505 51.390301 0.195396 51.389545 0.194972 51.389429 0.194923 51.389357 0.19492 51.389321 0.194918 51.389297 0.19492
Segment 3
13 coordinate pairs- Description
- M25 clockwise within J3 before A20 roundabout access
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {D4C5511D-3207-45A7-86A4-1F63583704CD}
- Linear Element Type
- A Carriageway
- From Distance
- 808 m
- To Distance
- 1,083 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.393482 0.19753 51.393448 0.197498 51.393446 0.197496 51.393304 0.197366 51.392711 0.196863 51.392685 0.196841 51.392392 0.196603 51.392312 0.196542 51.391882 0.196249 51.39188 0.196248 51.391584 0.196047 51.39129 0.195866 51.391255 0.195844
- Geometry type
- MultiLineString
- Geometry points
- 26
- First coordinate pair
- 0.195844, 51.391255
- Road section segments
- 1
- Road section points
- 26
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.195844,
51.391255
],
[
0.195825,
51.391228
],
[
0.195798,
51.39119
],
[
0.195798,
51.39119
],
[
0.195818,
51.391085
],
[
0.195832,
51.391004
],
[
0.195505,
51.390461
],
[
0.195396,
51.390301
],
[
0.194972,
51.389545
],
[
0.194923,
51.389429
],
[
0.19492,
51.389357
],
[
0.194918,
51.389321
],
[
0.19492,
51.389297
],
[
0.19753,
51.393482
],
[
0.197498,
51.393448
],
[
0.197496,
51.393446
],
[
0.197366,
51.393304
],
[
0.196863,
51.392711
],
[
0.196841,
51.392685
],
[
0.196603,
51.392392
],
[
0.196542,
51.392312
],
[
0.196249,
51.391882
],
[
0.196248,
51.39188
],
[
0.196047,
51.391584
],
[
0.195866,
51.39129
],
[
0.195844,
51.391255
]
]
]
}
View road section coordinates
[
[
[
0.195844,
51.391255
],
[
0.195825,
51.391228
],
[
0.195798,
51.39119
],
[
0.195798,
51.39119
],
[
0.195818,
51.391085
],
[
0.195832,
51.391004
],
[
0.195505,
51.390461
],
[
0.195396,
51.390301
],
[
0.194972,
51.389545
],
[
0.194923,
51.389429
],
[
0.19492,
51.389357
],
[
0.194918,
51.389321
],
[
0.19492,
51.389297
],
[
0.19753,
51.393482
],
[
0.197498,
51.393448
],
[
0.197496,
51.393446
],
[
0.197366,
51.393304
],
[
0.196863,
51.392711
],
[
0.196841,
51.392685
],
[
0.196603,
51.392392
],
[
0.196542,
51.392312
],
[
0.196249,
51.391882
],
[
0.196248,
51.39188
],
[
0.196047,
51.391584
],
[
0.195866,
51.39129
],
[
0.195844,
51.391255
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Repair Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Oct 6, 2025 11:41 AM
- Record versioned
- Thu, Nov 6, 2025 9:38 PM
- Coordinate source
- Geometry
Related incidents
M25 Anti-clockwise Jct 9 to Jct 8 lane 4,3 closure
Planned National HighwaysM25 Anti-clockwise Jct 9 to Jct 8 lane 4,3 closure
M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure
Planned National HighwaysM25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure
M25 clockwise Jct 23 to Jct 25 carriageway and slip road closure
Planned National HighwaysM25 clockwise Jct 23 to Jct 25 carriageway and slip road closure
M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure
Planned National HighwaysM25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure
M25 Anti-clockwise Jct 17 to Jct 16 lane 1,2 closure
Planned National HighwaysM25 Anti-clockwise Jct 17 to Jct 16 lane 1,2 closure
M25 Clockwise Jct 16 to Jct 17 Lane 1,2 closure
Planned National HighwaysM25 Clockwise Jct 16 to Jct 17 Lane 1,2 closure