M25 Clockwise Jct 28 exit slip road hard shoulder closure
ClearedM25 Clockwise Jct 28 exit slip road hard shoulder closure
- Start time
- Fri, Oct 31, 2025 9:30 AM
- Expected end
- Fri, Oct 31, 2025 4:00 PM
- Duration
- 6 hours 30 minutes
- Road
- M25 – M25 J28 Clockwise Exit
- Category
- Construction Work
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- 1 of 1 lanes affected
- Reason
- Road Improvement Or Upgrading
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Thu, Oct 30, 2025 3:47 PM
- Last updated
- Fri, Oct 31, 2025 1:08 AM
- Cleared
- Fri, Oct 31, 2025 4:00 PM
- Latest update: M25 Clockwise Jct 28 exit slip road hard shoulder closure
- Coordinates
- 51.613994, 0.256772
- Latitude span
- 51.612354 – 51.614730
- Longitude span
- 0.256035 – 0.258384
- Bounding box centre
- 51.613542, 0.257210
- Location descriptions
-
- M25 J28 clockwise exit
- M25 clockwise between J27 and J28
- Feed validity status
- Planned
- Overall feed start
- Fri, Oct 31, 2025 9:30 AM
- Overall feed end
- Fri, Oct 31, 2025 4:00 PM
- Feed window length
- 6 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- M25 J28 clockwise exit
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {EB3ABC2F-6FFF-411B-B33F-FEBF58831E9B}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 156 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.613552 0.257196 51.612354 0.258384
Segment 2
6 coordinate pairs- Description
- M25 clockwise between J27 and J28
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {1519D89C-D492-4C1D-9FDB-F6BD6D868B39}
- Linear Element Type
- A Carriageway
- From Distance
- 2,069 m
- To Distance
- 2,223 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.61473 0.256035 51.614685 0.256086 51.614575 0.256196 51.614382 0.256403 51.614125 0.256679 51.613552 0.257196
- Geometry type
- MultiLineString
- Geometry points
- 8
- First coordinate pair
- 0.257196, 51.613552
- Road section segments
- 1
- Road section points
- 8
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.257196,
51.613552
],
[
0.258384,
51.612354
],
[
0.256035,
51.61473
],
[
0.256086,
51.614685
],
[
0.256196,
51.614575
],
[
0.256403,
51.614382
],
[
0.256679,
51.614125
],
[
0.257196,
51.613552
]
]
]
}
View road section coordinates
[
[
[
0.257196,
51.613552
],
[
0.258384,
51.612354
],
[
0.256035,
51.61473
],
[
0.256086,
51.614685
],
[
0.256196,
51.614575
],
[
0.256403,
51.614382
],
[
0.256679,
51.614125
],
[
0.257196,
51.613552
]
]
]
- Cause type
- Construction Work
- Detailed cause
- Road Improvement Or Upgrading
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Thu, Oct 30, 2025 3:47 PM
- Record versioned
- Fri, Oct 31, 2025 1:08 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure
Active Roadworks National HighwaysExpected to clear in 6 hours 8 minutes
M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure
M25 Anti-clockwise Jct 5 to A21 Southbound Chipstead link road closure
Cleared Roadworks National HighwaysCleared 22 hours 56 minutes ago
M25 Anti-clockwise Jct 5 to A21 Southbound Chipstead link road closure
A12 northbound Jct 11 to Jct 12 lane 2 closure
Cleared Roadworks National HighwaysCleared 18 hours 21 minutes ago
A12 northbound Jct 11 to Jct 12 lane 2 closure
M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure
Cleared Roadworks National HighwaysCleared 2 days 21 minutes ago
M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
Cleared Roadworks National HighwaysCleared 1 day 17 hours ago
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
M25 Anti-clockwise Jct 3 entry slip road closure
Cleared Roadworks National HighwaysCleared 2 days 21 minutes ago
M25 Anti-clockwise Jct 3 entry slip road closure