M25 Clockwise Jct 19 Exit Slip Road Hardshoulder closure

Cleared

M25 Clockwise Jct 19 Exit Slip Road Hardshoulder closure

Start time
Fri, Oct 3, 2025 8:30 AM
Expected end
Fri, Oct 3, 2025 3:00 PM
Duration
6 hours 30 minutes
Road
M25 – Link Road From M25 J19 Clockwise Exit To A41 Roundabout
Category
Road Maintenance
Direction
Clockwise
Carriageway
Dual Carriageway
Reason
Tree And Vegetation Cutting Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Aug 29, 2025 2:14 PM
Last updated
Fri, Oct 3, 2025 10:48 AM
Cleared
Fri, Oct 3, 2025 3:00 PM
  • Latest update: M25 Clockwise Jct 19 Exit Slip Road Hardshoulder closure
Coordinates
51.682537, -0.441837
Latitude span
51.681805 – 51.683061
Longitude span
-0.445257 – -0.439058
Bounding box centre
51.682433, -0.442158
Location descriptions
  • link road from M25 J19 clockwise exit to A41 roundabout
Feed validity status
Planned
Overall feed start
Fri, Oct 3, 2025 8:30 AM
Overall feed end
Fri, Oct 3, 2025 3:00 PM
Feed window length
6 hours 30 minutes
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

6 coordinate pairs
Description
link road from M25 J19 clockwise exit to A41 roundabout
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
3 operational lanes
Direction On Section
Clockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M25
Linear Element Model
The Network Model
Linear Element Id
{CB9C7EE4-9F13-47B2-ABE3-155ECDDDC494}
Linear Element Type
A Carriageway
From Distance
0 m
To Distance
217 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.682508 -0.442068
51.68255 -0.441867
51.682762 -0.440905
51.682896 -0.440133
51.683045 -0.439203
51.683061 -0.439058

Segment 2

4 coordinate pairs
Description
link road from M25 J19 clockwise exit to A41 roundabout
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
3 operational lanes
Direction On Section
Clockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M25
Linear Element Model
The Network Model
Linear Element Id
{3DC64FA2-D87E-442F-A029-8D7F839B44A7}
Linear Element Type
A Carriageway
From Distance
416 m
To Distance
650 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.681805 -0.445257
51.681991 -0.44449
51.682246 -0.443324
51.682508 -0.442068
Geometry type
MultiLineString
Geometry points
10
First coordinate pair
-0.442068, 51.682508
Road section segments
1
Road section points
10
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.442068,
                51.682508
            ],
            [
                -0.441867,
                51.68255
            ],
            [
                -0.440905,
                51.682762
            ],
            [
                -0.440133,
                51.682896
            ],
            [
                -0.439203,
                51.683045
            ],
            [
                -0.439058,
                51.683061
            ],
            [
                -0.445257,
                51.681805
            ],
            [
                -0.44449,
                51.681991
            ],
            [
                -0.443324,
                51.682246
            ],
            [
                -0.442068,
                51.682508
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.442068,
            51.682508
        ],
        [
            -0.441867,
            51.68255
        ],
        [
            -0.440905,
            51.682762
        ],
        [
            -0.440133,
            51.682896
        ],
        [
            -0.439203,
            51.683045
        ],
        [
            -0.439058,
            51.683061
        ],
        [
            -0.445257,
            51.681805
        ],
        [
            -0.44449,
            51.681991
        ],
        [
            -0.443324,
            51.682246
        ],
        [
            -0.442068,
            51.682508
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Tree And Vegetation Cutting Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Fri, Aug 29, 2025 2:14 PM
Record versioned
Fri, Oct 3, 2025 10:48 AM
Coordinate source
Geometry

Driving on the M25? See every live closure, roadwork and planned restriction on this road.

M25 live closures

Related incidents

M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure

Planned Roadworks National Highways
Redhill M25 · M25 Anti-Clockwise Between J9 And J8

Starts in 3 hours 45 minutes

Starts 14 Jun 2026, 21:30 Expected clear 15 Jun 2026, 04:30

M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure

Category: Road Maintenance
View update

M25 Anti-clockwise Jct 5 to A21 Southbound Chipstead link road closure

Cleared Roadworks National Highways
Bromley M25 · M25 Clockwise Within J5

Cleared 18 hours 19 minutes ago

Started 13 Jun 2026, 21:00 Ended 13 Jun 2026, 23:25

M25 Anti-clockwise Jct 5 to A21 Southbound Chipstead link road closure

Category: Road Maintenance
View update

M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure

Cleared Roadworks National Highways
Borehamwood M25 · M25 Clockwise Between J22 And J23

Cleared 1 day 19 hours ago

Started 12 Jun 2026, 22:00 Ended 12 Jun 2026, 22:00

M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure

Category: Road Maintenance
View update

M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures

Cleared Roadworks National Highways
Thorpe Green M25 · M25 J11 Anti-Clockwise Access

Cleared 1 day 12 hours ago

Started 12 Jun 2026, 22:00 Ended 13 Jun 2026, 05:00

M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures

Category: Road Maintenance
View update

M25 Anti-clockwise Jct 3 entry slip road closure

Cleared Roadworks National Highways
Dunton Green M25 · M25 Anti-Clockwise Within J3 After A20 Roundabout Access

Cleared 1 day 19 hours ago

Started 12 Jun 2026, 22:00 Ended 12 Jun 2026, 22:00

M25 Anti-clockwise Jct 3 entry slip road closure

Category: Road Maintenance
View update

M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure

Cleared Roadworks National Highways
Slough M25 · M25 Anti-Clockwise Between J16 And J15

Cleared 1 day 12 hours ago

Started 12 Jun 2026, 22:00 Ended 13 Jun 2026, 05:00

M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure

Category: Construction Work
View update