M25 Clockwise Jct 19 Exit Slip Road Hardshoulder closure
ClearedM25 Clockwise Jct 19 Exit Slip Road Hardshoulder closure
- Start time
- Thu, Oct 2, 2025 8:30 AM
- Expected end
- Thu, Oct 2, 2025 3:00 PM
- Duration
- 6 hours 30 minutes
- Road
- M25 – Link Road From M25 J19 Clockwise Exit To A41 Roundabout
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 29, 2025 2:14 PM
- Last updated
- Thu, Oct 2, 2025 10:14 AM
- Cleared
- Thu, Oct 2, 2025 3:00 PM
- Latest update: M25 Clockwise Jct 19 Exit Slip Road Hardshoulder closure
- Coordinates
- 51.682537, -0.441837
- Latitude span
- 51.681805 – 51.683061
- Longitude span
- -0.445257 – -0.439058
- Bounding box centre
- 51.682433, -0.442158
- Location descriptions
-
- link road from M25 J19 clockwise exit to A41 roundabout
- Feed validity status
- Planned
- Overall feed start
- Thu, Oct 2, 2025 8:30 AM
- Overall feed end
- Thu, Oct 2, 2025 3:00 PM
- Feed window length
- 6 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- link road from M25 J19 clockwise exit to A41 roundabout
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {CB9C7EE4-9F13-47B2-ABE3-155ECDDDC494}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 217 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.682508 -0.442068 51.68255 -0.441867 51.682762 -0.440905 51.682896 -0.440133 51.683045 -0.439203 51.683061 -0.439058
Segment 2
4 coordinate pairs- Description
- link road from M25 J19 clockwise exit to A41 roundabout
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {3DC64FA2-D87E-442F-A029-8D7F839B44A7}
- Linear Element Type
- A Carriageway
- From Distance
- 416 m
- To Distance
- 650 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.681805 -0.445257 51.681991 -0.44449 51.682246 -0.443324 51.682508 -0.442068
- Geometry type
- MultiLineString
- Geometry points
- 10
- First coordinate pair
- -0.442068, 51.682508
- Road section segments
- 1
- Road section points
- 10
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.442068,
51.682508
],
[
-0.441867,
51.68255
],
[
-0.440905,
51.682762
],
[
-0.440133,
51.682896
],
[
-0.439203,
51.683045
],
[
-0.439058,
51.683061
],
[
-0.445257,
51.681805
],
[
-0.44449,
51.681991
],
[
-0.443324,
51.682246
],
[
-0.442068,
51.682508
]
]
]
}
View road section coordinates
[
[
[
-0.442068,
51.682508
],
[
-0.441867,
51.68255
],
[
-0.440905,
51.682762
],
[
-0.440133,
51.682896
],
[
-0.439203,
51.683045
],
[
-0.439058,
51.683061
],
[
-0.445257,
51.681805
],
[
-0.44449,
51.681991
],
[
-0.443324,
51.682246
],
[
-0.442068,
51.682508
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 29, 2025 2:14 PM
- Record versioned
- Thu, Oct 2, 2025 10:14 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure
Planned Roadworks National HighwaysStarts in 3 hours 45 minutes
M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure
M25 Anti-clockwise Jct 5 to A21 Southbound Chipstead link road closure
Cleared Roadworks National HighwaysCleared 18 hours 19 minutes ago
M25 Anti-clockwise Jct 5 to A21 Southbound Chipstead link road closure
M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure
Cleared Roadworks National HighwaysCleared 1 day 19 hours ago
M25 clockwise Jct 22 to Jct 23 lane 4,3,2 closure
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
Cleared Roadworks National HighwaysCleared 1 day 12 hours ago
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
M25 Anti-clockwise Jct 3 entry slip road closure
Cleared Roadworks National HighwaysCleared 1 day 19 hours ago
M25 Anti-clockwise Jct 3 entry slip road closure
M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure
Cleared Roadworks National HighwaysCleared 1 day 12 hours ago
M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure