M25 clockwise Jct 13 exit slip road lane 2 closure
ClearedM25 clockwise Jct 13 exit slip road lane 2 closure
- Start time
- Thu, Apr 9, 2026 9:00 PM
- Expected end
- Fri, Apr 10, 2026 4:30 AM
- Duration
- 7 hours 30 minutes
- Road
- M25 – Carriageway Connector At A30 Northbound From M25 Clockwise Within J13
- Category
- Road Maintenance
- Direction
- Clockwise
- Carriageway
- Dual Carriageway
- Lanes affected
- Lane 2 closed, 1 of 1 lanes affected, 1 of 4 lanes affected
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Feb 16, 2026 4:07 PM
- Last updated
- Thu, Apr 9, 2026 11:44 PM
- Cleared
- Fri, Apr 10, 2026 4:30 AM
- Latest update: M25 clockwise Jct 13 exit slip road lane 2 closure
- Coordinates
- 51.440871, -0.531773
- Latitude span
- 51.440755 – 51.441193
- Longitude span
- -0.531832 – -0.531607
- Bounding box centre
- 51.440974, -0.531720
- Location descriptions
-
- Carriageway connector at A30 northbound from M25 clockwise within J13
- A30 northbound between M25 J12 and J13
- Feed validity status
- Planned
- Overall feed start
- Thu, Apr 9, 2026 9:00 PM
- Overall feed end
- Fri, Apr 10, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
2 coordinate pairs- Description
- Carriageway connector at A30 northbound from M25 clockwise within J13
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 1 operational lane
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {D1E326EB-6BB4-49C5-A51C-D55D37467C6F}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 188 m
- To Distance
- 189 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.440755 -0.531832 51.440767 -0.531826
Segment 2
2 coordinate pairs- Description
- A30 northbound between M25 J12 and J13
- Carriageway
- Dual Carriageway
- Lane Usage
- Cl2
- Lane Number
- 2
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 1 lane restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- A30
- Linear Element Model
- The Network Model
- Linear Element Id
- {450F9C3A-0945-4B9B-85D7-025FD2E1730A}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 49 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.440767 -0.531826 51.441193 -0.531607
- Geometry type
- MultiLineString
- Geometry points
- 4
- First coordinate pair
- -0.531832, 51.440755
- Road section segments
- 1
- Road section points
- 4
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.531832,
51.440755
],
[
-0.531826,
51.440767
],
[
-0.531826,
51.440767
],
[
-0.531607,
51.441193
]
]
]
}
View road section coordinates
[
[
[
-0.531832,
51.440755
],
[
-0.531826,
51.440767
],
[
-0.531826,
51.440767
],
[
-0.531607,
51.441193
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Feb 16, 2026 4:07 PM
- Record versioned
- Thu, Apr 9, 2026 11:44 PM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Clockwise Jct 20 to Jct 21 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 14 hours 55 minutes
M25 Clockwise Jct 20 to Jct 21 lane 1,2 closure
A21 Southbound Chipstead Eastbound exit slip road closure
Planned Roadworks National HighwaysStarts in 14 hours 25 minutes
A21 Southbound Chipstead Eastbound exit slip road closure
M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure
Planned Roadworks National HighwaysStarts in 14 hours 25 minutes
M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure
M25 Clockwise Jct 27 to Jct 28 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 14 hours 25 minutes
M25 Clockwise Jct 27 to Jct 28 lane 1,2 closure
M25 Clockwise Jct 23 exit slip road lane 1 closure
Planned Roadworks National HighwaysStarts in 14 hours 25 minutes
M25 Clockwise Jct 23 exit slip road lane 1 closure
M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure
Cleared Roadworks National HighwaysCleared 6 hours 53 minutes ago
M25 Anti-clockwise Jct 8 to Jct 7 lane 4,3 closure