M25 Clockwise Jct 11 exit slip road closure
ClearedM25 Clockwise Jct 11 exit slip road closure
- Start time
- Mon, Sep 14, 2026 9:00 PM
- Expected end
- Tue, Sep 15, 2026 4:00 AM
- Duration
- 7 hours
- Road
- M25 – M25 J11 Clockwise Exit
- Category
- Road Maintenance
- Direction
- Clockwise
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Aug 14, 2026 12:52 PM
- Last updated
- Tue, Sep 15, 2026 3:45 AM
- Cleared
- Tue, Sep 15, 2026 4:00 AM
- Latest update: M25 Clockwise Jct 11 exit slip road closure
- Coordinates
- 51.373440, -0.508967
- Latitude span
- 51.371126 – 51.374353
- Longitude span
- -0.509611 – -0.507445
- Bounding box centre
- 51.372740, -0.508528
- Location descriptions
-
- M25 J11 clockwise exit
- Feed validity status
- Planned
- Overall feed start
- Mon, Sep 14, 2026 9:00 PM
- Overall feed end
- Tue, Sep 15, 2026 4:00 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
8 coordinate pairs- Description
- M25 J11 clockwise exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {019E8EDA-DEAA-45C7-AE03-1165F48975B8}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 371 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.371126 -0.507445 51.371507 -0.507706 51.372065 -0.508084 51.372378 -0.508295 51.373266 -0.508855 51.373746 -0.509141 51.374163 -0.509413 51.374212 -0.509468
Segment 2
6 coordinate pairs- Description
- M25 J11 clockwise exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- Clockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {136952C3-EE8C-499E-A4C9-172F6F66C23D}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 18 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.374212 -0.509468 51.374258 -0.50949 51.37427 -0.5095 51.374282 -0.509512 51.374318 -0.509554 51.374353 -0.509611
- Geometry type
- MultiLineString
- Geometry points
- 14
- First coordinate pair
- -0.507445, 51.371126
- Road section segments
- 1
- Road section points
- 14
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.507445,
51.371126
],
[
-0.507706,
51.371507
],
[
-0.508084,
51.372065
],
[
-0.508295,
51.372378
],
[
-0.508855,
51.373266
],
[
-0.509141,
51.373746
],
[
-0.509413,
51.374163
],
[
-0.509468,
51.374212
],
[
-0.509468,
51.374212
],
[
-0.50949,
51.374258
],
[
-0.5095,
51.37427
],
[
-0.509512,
51.374282
],
[
-0.509554,
51.374318
],
[
-0.509611,
51.374353
]
]
]
}
View road section coordinates
[
[
[
-0.507445,
51.371126
],
[
-0.507706,
51.371507
],
[
-0.508084,
51.372065
],
[
-0.508295,
51.372378
],
[
-0.508855,
51.373266
],
[
-0.509141,
51.373746
],
[
-0.509413,
51.374163
],
[
-0.509468,
51.374212
],
[
-0.509468,
51.374212
],
[
-0.50949,
51.374258
],
[
-0.5095,
51.37427
],
[
-0.509512,
51.374282
],
[
-0.509554,
51.374318
],
[
-0.509611,
51.374353
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Aug 14, 2026 12:52 PM
- Record versioned
- Tue, Sep 15, 2026 3:45 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Clockwise Jct 30 exit slip lane 1 closure
Planned Roadworks National HighwaysStarts in 1 hour 3 minutes
M25 Clockwise Jct 30 exit slip lane 1 closure
M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure
Planned Roadworks National HighwaysStarts in 1 hour 3 minutes
M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure
M25 Clockwise Jct 4 to Jct 5 carriageway closure
Cleared Roadworks National HighwaysExpected to clear in 8 hours 33 minutes
M25 Clockwise Jct 4 to Jct 5 carriageway closure
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
Planned Roadworks National HighwaysStarts in 1 hour 3 minutes
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure
Planned Roadworks National HighwaysStarts in 1 hour 3 minutes
M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
Planned Roadworks National HighwaysStarts in 1 hour 3 minutes
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure