M25 anticlockwise Jct 10 to Jct 9 hard shoulder closure
ClearedM25 anticlockwise Jct 10 to Jct 9 hard shoulder closure
- Start time
- Tue, Oct 7, 2025 8:30 AM
- Expected end
- Tue, Oct 7, 2025 3:00 PM
- Duration
- 6 hours 30 minutes
- Road
- M25 – M25 Anti-Clockwise Between J10 And J9
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Reason
- Tree And Vegetation Cutting Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Oct 7, 2025 8:17 AM
- Last updated
- Tue, Oct 7, 2025 8:36 AM
- Cleared
- Tue, Oct 7, 2025 3:00 PM
- Latest update: M25 anticlockwise Jct 10 to Jct 9 hard shoulder closure
- Coordinates
- 51.312034, -0.425543
- Latitude span
- 51.308071 – 51.316959
- Longitude span
- -0.437889 – -0.414704
- Bounding box centre
- 51.312515, -0.426297
- Location descriptions
-
- M25 anti-clockwise between J10 and J9
- Feed validity status
- Active
- Overall feed start
- Tue, Oct 7, 2025 8:30 AM
- Overall feed end
- Tue, Oct 7, 2025 3:00 PM
- Feed window length
- 6 hours 30 minutes
- Probability code (raw)
- certain
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
7 coordinate pairs- Description
- M25 anti-clockwise between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {C3E33ED2-CE8B-4F88-96B2-E02A2C4C51E1}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 825 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.315371 -0.43429 51.315074 -0.433583 51.313799 -0.430383 51.313184 -0.428797 51.312802 -0.427828 51.311918 -0.425583 51.311423 -0.424269
Segment 2
14 coordinate pairs- Description
- M25 anti-clockwise between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {200313D9-BC5A-4373-A62A-3028B48BAD13}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 764 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.311423 -0.424269 51.31102 -0.423199 51.310662 -0.422261 51.310415 -0.421598 51.310306 -0.421305 51.309974 -0.420369 51.309524 -0.419108 51.309272 -0.418384 51.308946 -0.417464 51.308738 -0.416884 51.308407 -0.415868 51.308179 -0.41508 51.308092 -0.414778 51.308071 -0.414704
Segment 3
6 coordinate pairs- Description
- M25 anti-clockwise between J10 and J9
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {09F87A5E-DFC2-08C3-D27F-0DDB31BDCB52}
- Linear Element Type
- B Carriageway
- From Distance
- 41 m
- To Distance
- 348 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.316959 -0.437889 51.316846 -0.437655 51.31679 -0.437528 51.316697 -0.437316 51.31565 -0.434969 51.315371 -0.43429
- Geometry type
- MultiLineString
- Geometry points
- 27
- First coordinate pair
- -0.434290, 51.315371
- Road section segments
- 1
- Road section points
- 27
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
-0.43429,
51.315371
],
[
-0.433583,
51.315074
],
[
-0.430383,
51.313799
],
[
-0.428797,
51.313184
],
[
-0.427828,
51.312802
],
[
-0.425583,
51.311918
],
[
-0.424269,
51.311423
],
[
-0.424269,
51.311423
],
[
-0.423199,
51.31102
],
[
-0.422261,
51.310662
],
[
-0.421598,
51.310415
],
[
-0.421305,
51.310306
],
[
-0.420369,
51.309974
],
[
-0.419108,
51.309524
],
[
-0.418384,
51.309272
],
[
-0.417464,
51.308946
],
[
-0.416884,
51.308738
],
[
-0.415868,
51.308407
],
[
-0.41508,
51.308179
],
[
-0.414778,
51.308092
],
[
-0.414704,
51.308071
],
[
-0.437889,
51.316959
],
[
-0.437655,
51.316846
],
[
-0.437528,
51.31679
],
[
-0.437316,
51.316697
],
[
-0.434969,
51.31565
],
[
-0.43429,
51.315371
]
]
]
}
View road section coordinates
[
[
[
-0.43429,
51.315371
],
[
-0.433583,
51.315074
],
[
-0.430383,
51.313799
],
[
-0.428797,
51.313184
],
[
-0.427828,
51.312802
],
[
-0.425583,
51.311918
],
[
-0.424269,
51.311423
],
[
-0.424269,
51.311423
],
[
-0.423199,
51.31102
],
[
-0.422261,
51.310662
],
[
-0.421598,
51.310415
],
[
-0.421305,
51.310306
],
[
-0.420369,
51.309974
],
[
-0.419108,
51.309524
],
[
-0.418384,
51.309272
],
[
-0.417464,
51.308946
],
[
-0.416884,
51.308738
],
[
-0.415868,
51.308407
],
[
-0.41508,
51.308179
],
[
-0.414778,
51.308092
],
[
-0.414704,
51.308071
],
[
-0.437889,
51.316959
],
[
-0.437655,
51.316846
],
[
-0.437528,
51.31679
],
[
-0.437316,
51.316697
],
[
-0.434969,
51.31565
],
[
-0.43429,
51.315371
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Tree And Vegetation Cutting Work
- Compliance
- Mandatory
- Probability
- Certain
- Validity status
- Active
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Oct 7, 2025 8:17 AM
- Record versioned
- Tue, Oct 7, 2025 8:36 AM
- Coordinate source
- Geometry
Related incidents
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
Planned National HighwaysM25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
Planned National HighwaysM25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
M25 Anti-clockwise Jct 4 to Jct 3 lane 3 closure
Cleared National HighwaysM25 Anti-clockwise Jct 4 to Jct 3 lane 3 closure
M25 Anti-clockwise Jct 4 to Jct 3 lane 3 closure
Cleared National HighwaysM25 Anti-clockwise Jct 4 to Jct 3 lane 3 closure
M25 Anti-clockwise Jct 4 to Jct 3 lane 3 closure
Cleared National HighwaysM25 Anti-clockwise Jct 4 to Jct 3 lane 3 closure
M25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures
Planned National HighwaysM25 Anti-Clockwise Jct 11 - Jct 10 Carriageway and Slip road closures