M25 Anti-clockwise Jct 5 Hard shoulder closure

Planned

M25 Anti-clockwise Jct 5 Hard shoulder closure

Start time
Fri, Oct 16, 2026 10:00 PM
Expected end
Sat, Oct 17, 2026 4:30 AM
Duration
6 hours 30 minutes
Road
M25 – M25 Anti-Clockwise Within J5
Category
Road Maintenance
Direction
Anticlockwise
Carriageway
Dual Carriageway
Reason
Maintenance Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Oct 16, 2026 1:13 AM
Last updated
Fri, Oct 16, 2026 2:35 AM
Cleared
Sat, Oct 17, 2026 4:30 AM
  • Latest update: M25 Anti-clockwise Jct 5 Hard shoulder closure
Coordinates
51.291156, 0.142066
Latitude span
51.290917 – 51.291453
Longitude span
0.141375 – 0.142909
Bounding box centre
51.291185, 0.142142
Location descriptions
  • M25 anti-clockwise within J5
Feed validity status
Planned
Overall feed start
Fri, Oct 16, 2026 10:00 PM
Overall feed end
Sat, Oct 17, 2026 4:30 AM
Feed window length
6 hours 30 minutes
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

3 coordinate pairs
Description
M25 anti-clockwise within J5
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
5 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M25
Linear Element Model
The Network Model
Linear Element Id
{B1EDDFA4-7056-4018-892D-19C60F24B62A}
Linear Element Type
A Carriageway Entry Slip
From Distance
0 m
To Distance
55 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.291207 0.142216
51.291219 0.142249
51.291453 0.142909

Segment 2

3 coordinate pairs
Description
M25 anti-clockwise within J5
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
3 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M25
Linear Element Model
The Network Model
Linear Element Id
{DCB412B1-6860-4E5C-9D28-FD8EA23F5848}
Linear Element Type
A Carriageway Entry Slip
From Distance
391 m
To Distance
458 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.290917 0.141375
51.290934 0.141429
51.291207 0.142216
Geometry type
MultiLineString
Geometry points
6
First coordinate pair
0.142216, 51.291207
Road section segments
1
Road section points
6
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                0.142216,
                51.291207
            ],
            [
                0.142249,
                51.291219
            ],
            [
                0.142909,
                51.291453
            ],
            [
                0.141375,
                51.290917
            ],
            [
                0.141429,
                51.290934
            ],
            [
                0.142216,
                51.291207
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            0.142216,
            51.291207
        ],
        [
            0.142249,
            51.291219
        ],
        [
            0.142909,
            51.291453
        ],
        [
            0.141375,
            51.290917
        ],
        [
            0.141429,
            51.290934
        ],
        [
            0.142216,
            51.291207
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Maintenance Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Fri, Oct 16, 2026 1:13 AM
Record versioned
Fri, Oct 16, 2026 2:35 AM
Coordinate source
Geometry

Driving on the M25? See every live closure, roadwork and planned restriction on this road.

M25 live closures

Related incidents

M25 Anti-clockwise Jct 2 carriageway closure between the exit and entry slip roads

Planned Roadworks National Highways
Dartford M25 · M25 Anti-Clockwise Within J2

Starts in 17 hours 20 minutes

Starts 16 Oct 2026, 23:00 Expected clear 17 Oct 2026, 06:00

M25 Anti-clockwise Jct 2 carriageway closure between the exit and entry slip roads

Category: Road Maintenance
View update

M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure

Planned Roadworks National Highways
Hersham M25 · M25 Anti-Clockwise At The Cobham Services Between J10 And J9

Starts in 17 hours 20 minutes

Starts 16 Oct 2026, 23:00 Expected clear 17 Oct 2026, 06:00

M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure

Category: Road Maintenance
View update

M25 clockwise Jct 14 exit slip road lane 1 closure

Planned Roadworks National Highways
Littleton M25 · M25 Clockwise Within J14

Starts in 17 hours 20 minutes

Starts 16 Oct 2026, 23:00 Expected clear 17 Oct 2026, 05:30

M25 clockwise Jct 14 exit slip road lane 1 closure

Category: Road Maintenance
View update

M25 Clockwise Jct 17 to Jct 18 Lane 4 Closure

Planned Roadworks National Highways
Buckinghamshire M25 · M25 Clockwise Between J17 And J18

Starts in 17 hours 20 minutes

Starts 16 Oct 2026, 23:00 Expected clear 17 Oct 2026, 05:30

M25 Clockwise Jct 17 to Jct 18 Lane 4 Closure

Category: Road Maintenance
View update

A21 southbound Pembury to Cryals road carriageway closure

Planned Roadworks National Highways
Dunton Green A21 · A21 Southbound Between A26 Near Tonbridge (East) And A228

Starts in 14 hours 20 minutes

Starts 16 Oct 2026, 20:00 Expected clear 17 Oct 2026, 06:00

A21 southbound Pembury to Cryals road carriageway closure

Category: Road Maintenance
View update

M25 Clockwise Jct 24 to Jct 25 lane 1,2 closure

Cleared Roadworks National Highways
Cheshunt M25 · M25 Clockwise Between J24 And J25

Cleared 24 minutes 39 seconds ago

Started 16 Oct 2026, 00:41 Ended 16 Oct 2026, 05:15

M25 Clockwise Jct 24 to Jct 25 lane 1,2 closure

Category: Road Maintenance
View update