M25 Anti-clockwise Jct 5 Hard shoulder closure
PlannedM25 Anti-clockwise Jct 5 Hard shoulder closure
- Start time
- Tue, Oct 13, 2026 9:00 PM
- Expected end
- Wed, Oct 14, 2026 4:30 AM
- Duration
- 7 hours 30 minutes
- Road
- M25 – M25 Anti-Clockwise Within J5
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Mon, Jul 13, 2026 11:00 AM
- Last updated
- Tue, Oct 13, 2026 2:44 AM
- Cleared
- Wed, Oct 14, 2026 4:30 AM
- Latest update: M25 Anti-clockwise Jct 5 Hard shoulder closure
- Coordinates
- 51.291156, 0.142066
- Latitude span
- 51.290917 – 51.291453
- Longitude span
- 0.141375 – 0.142909
- Bounding box centre
- 51.291185, 0.142142
- Location descriptions
-
- M25 anti-clockwise within J5
- Feed validity status
- Planned
- Overall feed start
- Tue, Oct 13, 2026 9:00 PM
- Overall feed end
- Wed, Oct 14, 2026 4:30 AM
- Feed window length
- 7 hours 30 minutes
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M25 anti-clockwise within J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 5 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {B1EDDFA4-7056-4018-892D-19C60F24B62A}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 0 m
- To Distance
- 55 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.291207 0.142216 51.291219 0.142249 51.291453 0.142909
Segment 2
3 coordinate pairs- Description
- M25 anti-clockwise within J5
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 3 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {DCB412B1-6860-4E5C-9D28-FD8EA23F5848}
- Linear Element Type
- A Carriageway Entry Slip
- From Distance
- 391 m
- To Distance
- 458 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.290917 0.141375 51.290934 0.141429 51.291207 0.142216
- Geometry type
- MultiLineString
- Geometry points
- 6
- First coordinate pair
- 0.142216, 51.291207
- Road section segments
- 1
- Road section points
- 6
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.142216,
51.291207
],
[
0.142249,
51.291219
],
[
0.142909,
51.291453
],
[
0.141375,
51.290917
],
[
0.141429,
51.290934
],
[
0.142216,
51.291207
]
]
]
}
View road section coordinates
[
[
[
0.142216,
51.291207
],
[
0.142249,
51.291219
],
[
0.142909,
51.291453
],
[
0.141375,
51.290917
],
[
0.141429,
51.290934
],
[
0.142216,
51.291207
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Mon, Jul 13, 2026 11:00 AM
- Record versioned
- Tue, Oct 13, 2026 2:44 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
Planned Roadworks National HighwaysStarts in 17 hours 14 minutes
M25 Clockwise Jct 4 to Jct 5 lane 1 closure
M25 Anti-clockwise Jct 16 to Jct 15 Lane 1,2 closure
Planned Roadworks National HighwaysStarts in 17 hours 14 minutes
M25 Anti-clockwise Jct 16 to Jct 15 Lane 1,2 closure
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
Planned Roadworks National HighwaysStarts in 17 hours 14 minutes
M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure
M25 Anti-clockwise Jct 6 to Jct 5 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 17 hours 14 minutes
M25 Anti-clockwise Jct 6 to Jct 5 lane 1,2 closure
A12 northbound Jct 11 entry slip road closure from M25 exit
Planned Roadworks National HighwaysStarts in 16 hours 14 minutes
A12 northbound Jct 11 entry slip road closure from M25 exit
A21 southbound Pembury to Cryals road carriageway closure
Planned Roadworks National HighwaysStarts in 15 hours 14 minutes
A21 southbound Pembury to Cryals road carriageway closure