M25 Anti-clockwise Jct 4 to Jct 3 hard shoulder closure
PlannedM25 Anti-clockwise Jct 4 to Jct 3 hard shoulder closure
- Start time
- Sat, Oct 31, 2026 11:00 PM
- Expected end
- Sun, Nov 1, 2026 6:00 AM
- Duration
- 7 hours
- Road
- M25 – M25 Anti-Clockwise Between J4 And J3
- Category
- Road Maintenance
- Direction
- Anticlockwise
- Carriageway
- Dual Carriageway
- Reason
- Other
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Fri, Oct 23, 2026 3:10 PM
- Last updated
- Sat, Oct 31, 2026 12:21 AM
- Cleared
- Sun, Nov 1, 2026 6:00 AM
- Latest update: M25 Anti-clockwise Jct 4 to Jct 3 hard shoulder closure
- Coordinates
- 51.381084, 0.187941
- Latitude span
- 51.379098 – 51.384656
- Longitude span
- 0.186033 – 0.190865
- Bounding box centre
- 51.381877, 0.188449
- Location descriptions
-
- M25 anti-clockwise between J4 and J3
- M25 anti-clockwise within J3 before A20 roundabout access
- Feed validity status
- Planned
- Overall feed start
- Sat, Oct 31, 2026 11:00 PM
- Overall feed end
- Sun, Nov 1, 2026 6:00 AM
- Feed window length
- 7 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
5 coordinate pairs- Description
- M25 anti-clockwise between J4 and J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {C3DD8FD0-D6DF-4F92-B0C7-6949AC77AAD3}
- Linear Element Type
- B Carriageway
- From Distance
- 592 m
- To Distance
- 656 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.379098 0.186033 51.379388 0.186362 51.379432 0.186412 51.379562 0.186551 51.379573 0.186562
Segment 2
7 coordinate pairs- Description
- M25 anti-clockwise between J4 and J3
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {2FDFAC78-875E-400D-B96E-0B979C1611BE}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 319 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.379573 0.186562 51.380269 0.187314 51.380977 0.187963 51.38103 0.188011 51.38134 0.18827 51.381596 0.188498 51.382048 0.188881
Segment 3
4 coordinate pairs- Description
- M25 anti-clockwise within J3 before A20 roundabout access
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- Anticlockwise
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M25
- Linear Element Model
- The Network Model
- Linear Element Id
- {8995DCE5-1328-425D-9D75-DC487671FD6F}
- Linear Element Type
- B Carriageway
- From Distance
- 0 m
- To Distance
- 321 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.382048 0.188881 51.382924 0.189617 51.383834 0.190271 51.384656 0.190865
- Geometry type
- MultiLineString
- Geometry points
- 16
- First coordinate pair
- 0.186033, 51.379098
- Road section segments
- 1
- Road section points
- 16
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.186033,
51.379098
],
[
0.186362,
51.379388
],
[
0.186412,
51.379432
],
[
0.186551,
51.379562
],
[
0.186562,
51.379573
],
[
0.186562,
51.379573
],
[
0.187314,
51.380269
],
[
0.187963,
51.380977
],
[
0.188011,
51.38103
],
[
0.18827,
51.38134
],
[
0.188498,
51.381596
],
[
0.188881,
51.382048
],
[
0.188881,
51.382048
],
[
0.189617,
51.382924
],
[
0.190271,
51.383834
],
[
0.190865,
51.384656
]
]
]
}
View road section coordinates
[
[
[
0.186033,
51.379098
],
[
0.186362,
51.379388
],
[
0.186412,
51.379432
],
[
0.186551,
51.379562
],
[
0.186562,
51.379573
],
[
0.186562,
51.379573
],
[
0.187314,
51.380269
],
[
0.187963,
51.380977
],
[
0.188011,
51.38103
],
[
0.18827,
51.38134
],
[
0.188498,
51.381596
],
[
0.188881,
51.382048
],
[
0.188881,
51.382048
],
[
0.189617,
51.382924
],
[
0.190271,
51.383834
],
[
0.190865,
51.384656
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Other
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Fri, Oct 23, 2026 3:10 PM
- Record versioned
- Sat, Oct 31, 2026 12:21 AM
- Coordinate source
- Geometry
Driving on the M25? See every live closure, roadwork and planned restriction on this road.
M25 live closuresRelated incidents
M25 Anti-Clockwise Jct 20 Entry Slip Road Lane 1 Closure
Active Roadworks National HighwaysExpected to clear in 4 hours 3 minutes
M25 Anti-Clockwise Jct 20 Entry Slip Road Lane 1 Closure
A20 Eastbound Crittalls Corner to Swanley Interchange lane 3 closure
Active Roadworks National HighwaysExpected to clear in 4 hours 3 minutes
A20 Eastbound Crittalls Corner to Swanley Interchange lane 3 closure
M25 Anti-Clockwise Jct 9 to Jct 8 lane 4,3 closure
Active Roadworks National HighwaysExpected to clear in 4 hours 33 minutes
M25 Anti-Clockwise Jct 9 to Jct 8 lane 4,3 closure
M25 clockwise Jct 27 to Jct 28 lane 1,2 closure
Planned Roadworks National HighwaysExpected to clear in 4 hours 3 minutes
M25 clockwise Jct 27 to Jct 28 lane 1,2 closure
M25 Anti-clockwise Jct 16 to Jct 15 lane 4,3,2 closure
Planned Roadworks National HighwaysStarts in 18 hours 33 minutes
M25 Anti-clockwise Jct 16 to Jct 15 lane 4,3,2 closure
M25 Clockwise Jct 11 to Jct 12 Carriageway closure
Cleared Roadworks National HighwaysExpected to clear in 4 hours 33 minutes
M25 Clockwise Jct 11 to Jct 12 Carriageway closure