M25 Anti-clockwise Jct 27 exit slip road hard shoulder closure

Cleared

M25 Anti-clockwise Jct 27 exit slip road hard shoulder closure

Start time
Tue, Nov 11, 2025 10:00 PM
Expected end
Wed, Nov 12, 2025 5:00 AM
Duration
7 hours
Road
M25 – Link Road From M25 J27 Anti-Clockwise To M11 J6
Category
Road Maintenance
Direction
Anticlockwise
Carriageway
Dual Carriageway
Lanes affected
1 of 2 lanes affected
Reason
Maintenance Work
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Tue, Nov 4, 2025 11:43 AM
Last updated
Tue, Nov 11, 2025 9:33 PM
Cleared
Wed, Nov 12, 2025 5:00 AM
  • Latest update: M25 Anti-clockwise Jct 27 exit slip road hard shoulder closure
Coordinates
51.676480, 0.135750
Latitude span
51.675603 – 51.677105
Longitude span
0.134106 – 0.137831
Bounding box centre
51.676354, 0.135969
Location descriptions
  • link road from M25 J27 anti-clockwise to M11 J6
  • M25 anti-clockwise between J28 and J27
Feed validity status
Planned
Overall feed start
Tue, Nov 11, 2025 10:00 PM
Overall feed end
Wed, Nov 12, 2025 5:00 AM
Feed window length
7 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
link road from M25 J27 anti-clockwise to M11 J6
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
2 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M25
Linear Element Model
The Network Model
Linear Element Id
{20676B4E-9636-4B71-AB7A-A8BA83130D5E}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
27 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.677005 0.134467
51.677105 0.134106

Segment 2

6 coordinate pairs
Description
M25 anti-clockwise between J28 and J27
Carriageway
Dual Carriageway
Lane Usage
Lh
Lane Number
0
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
0 lanes restricted
Operational Lanes
5 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start2 End1
Linear Element Road
M25
Linear Element Model
The Network Model
Linear Element Id
{D19470AA-887E-45F4-86EC-86A342AC28D1}
Linear Element Type
B Carriageway
From Distance
48 m
To Distance
328 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.675603 0.137831
51.675922 0.137136
51.676006 0.136952
51.676457 0.135874
51.67674 0.135164
51.677005 0.134467
Geometry type
MultiLineString
Geometry points
8
First coordinate pair
0.134467, 51.677005
Road section segments
1
Road section points
8
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                0.134467,
                51.677005
            ],
            [
                0.134106,
                51.677105
            ],
            [
                0.137831,
                51.675603
            ],
            [
                0.137136,
                51.675922
            ],
            [
                0.136952,
                51.676006
            ],
            [
                0.135874,
                51.676457
            ],
            [
                0.135164,
                51.67674
            ],
            [
                0.134467,
                51.677005
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            0.134467,
            51.677005
        ],
        [
            0.134106,
            51.677105
        ],
        [
            0.137831,
            51.675603
        ],
        [
            0.137136,
            51.675922
        ],
        [
            0.136952,
            51.676006
        ],
        [
            0.135874,
            51.676457
        ],
        [
            0.135164,
            51.67674
        ],
        [
            0.134467,
            51.677005
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Maintenance Work
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Tue, Nov 4, 2025 11:43 AM
Record versioned
Tue, Nov 11, 2025 9:33 PM
Coordinate source
Geometry

Driving on the M25? See every live closure, roadwork and planned restriction on this road.

M25 live closures

Related incidents

M25 Clockwise Jct 20 to Jct 21 lane 1,2 closure

Planned Roadworks National Highways
Borehamwood M25 · M25 Clockwise Within J21A

Starts in 14 hours 55 minutes

Starts 15 Jun 2026, 21:30 Expected clear 16 Jun 2026, 04:30

M25 Clockwise Jct 20 to Jct 21 lane 1,2 closure

Category: Road Maintenance
View update

A21 Southbound Chipstead Eastbound exit slip road closure

Planned Roadworks National Highways
Dunton Green M25 · M25 Clockwise Exit For A25 (East)

Starts in 14 hours 25 minutes

Starts 15 Jun 2026, 21:00 Expected clear 16 Jun 2026, 04:30

A21 Southbound Chipstead Eastbound exit slip road closure

Category: Road Maintenance
View update

M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure

Planned Roadworks National Highways
Slough M25 · M25 Anti-Clockwise Between J16 And J15

Starts in 14 hours 25 minutes

Starts 15 Jun 2026, 21:00 Expected clear 16 Jun 2026, 04:30

M25 Anti-Clockwise Jct 15 to Jct 14 Lane 4,3,2 closure

Category: Construction Work
View update

M25 Clockwise Jct 27 to Jct 28 lane 1,2 closure

Planned Roadworks National Highways
Brentwood M25 · M25 Clockwise Between J27 And J28

Starts in 14 hours 25 minutes

Starts 15 Jun 2026, 21:00 Expected clear 16 Jun 2026, 04:00

M25 Clockwise Jct 27 to Jct 28 lane 1,2 closure

Category: Road Maintenance
View update

M25 Clockwise Jct 23 exit slip road lane 1 closure

Planned Roadworks National Highways
Borehamwood M25 · M25 J23 Clockwise Exit

Starts in 14 hours 25 minutes

Starts 15 Jun 2026, 21:00 Expected clear 16 Jun 2026, 04:30

M25 Clockwise Jct 23 exit slip road lane 1 closure

Category: Road Maintenance
View update

M11 northbound Jct 6 to Jct 8 mobile hard shoulder closure (MP 24/6 to 45/7)

Planned Roadworks National Highways
Epping Forest M11 · M11 Northbound Between J6 And J7

Starts in 1 hour 55 minutes

Starts 15 Jun 2026, 08:30 Expected clear 15 Jun 2026, 14:30

M11 northbound Jct 6 to Jct 8 mobile hard shoulder closure (MP 24/6 to 45/7)

Category: Road Maintenance
View update