M25 Anti-clockwise Jct 25 exit slip road lane 2 closure

Cleared

M25 Anti-clockwise Jct 25 exit slip road lane 2 closure

Start time
Sat, Oct 10, 2026 9:00 PM
Expected end
Sun, Oct 11, 2026 5:00 AM
Duration
8 hours
Road
M25 – M25 Anti-Clockwise Between J26 And J25
Category
Road Maintenance
Direction
Anticlockwise
Carriageway
Dual Carriageway
Lanes affected
Lane 2 closed, 1 of 3 lanes affected, 1 of 1 lanes affected
Reason
Roadworks
Live incident
Active roadworks
Planned
Cleared
Hover or tap markers for full details

Move Insights

Thinking of moving to this area?

Check flood risk, planning history, EPC ratings and more with a Move Insights property report.

Flood risk assessment
Planning history
EPC ratings & more
First published
Fri, Sep 18, 2026 1:22 PM
Last updated
Sun, Oct 11, 2026 4:50 AM
Cleared
Sun, Oct 11, 2026 5:00 AM
  • Latest update: M25 Anti-clockwise Jct 25 exit slip road lane 2 closure
Coordinates
51.682679, -0.043649
Latitude span
51.682647 – 51.682730
Longitude span
-0.044909 – -0.042705
Bounding box centre
51.682689, -0.043807
Location descriptions
  • M25 anti-clockwise between J26 and J25
  • M25 J25 anti-clockwise exit
Feed validity status
Planned
Overall feed start
Sat, Oct 10, 2026 9:00 PM
Overall feed end
Sun, Oct 11, 2026 5:00 AM
Feed window length
8 hours
Probability code (raw)
probable
Compliance option (raw)
mandatory
Source identification (raw)
roadworks
Management type value
other
Contra-flow flag (raw)
false
Width restriction flag (raw)
false
Height restriction flag (raw)
false
Weight restriction flag (raw)
false

Segment 1

2 coordinate pairs
Description
M25 anti-clockwise between J26 and J25
Carriageway
Dual Carriageway
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
3 operational lanes
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M25
Linear Element Model
The Network Model
Linear Element Id
{E2B28D69-9623-437E-A12B-6C3094B83494}
Linear Element Type
B Carriageway
From Distance
6 m
To Distance
30 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.682711 -0.042705
51.68273 -0.043052

Segment 2

6 coordinate pairs
Description
M25 J25 anti-clockwise exit
Lane Usage
Cl2
Lane Number
2
Lane Status
Closed
Lane Direction
Aligned
Lanes Restricted
1 lane restricted
Operational Lanes
1 operational lane
Direction On Section
Anticlockwise
Direction Relative
Aligned
Height Grade
Start1 End1
Linear Element Road
M25
Linear Element Model
The Network Model
Linear Element Id
{6C033BFA-0DC8-4110-819C-C6ADB4F10E89}
Linear Element Type
B Carriageway Exit Slip
From Distance
0 m
To Distance
129 m
Gml Srs Name
EPSG::4326
Gml Srs Dimension
2
Raw coordinate list
51.68273 -0.043052
51.682657 -0.043533
51.682651 -0.043663
51.682651 -0.043744
51.682647 -0.044532
51.682657 -0.044909
Geometry type
MultiLineString
Geometry points
8
First coordinate pair
-0.042705, 51.682711
Road section segments
1
Road section points
8
View geometry JSON
{
    "type": "MultiLineString",
    "coordinates": [
        [
            [
                -0.042705,
                51.682711
            ],
            [
                -0.043052,
                51.68273
            ],
            [
                -0.043052,
                51.68273
            ],
            [
                -0.043533,
                51.682657
            ],
            [
                -0.043663,
                51.682651
            ],
            [
                -0.043744,
                51.682651
            ],
            [
                -0.044532,
                51.682647
            ],
            [
                -0.044909,
                51.682657
            ]
        ]
    ]
}
View road section coordinates
[
    [
        [
            -0.042705,
            51.682711
        ],
        [
            -0.043052,
            51.68273
        ],
        [
            -0.043052,
            51.68273
        ],
        [
            -0.043533,
            51.682657
        ],
        [
            -0.043663,
            51.682651
        ],
        [
            -0.043744,
            51.682651
        ],
        [
            -0.044532,
            51.682647
        ],
        [
            -0.044909,
            51.682657
        ]
    ]
]
Cause type
Road Maintenance
Detailed cause
Roadworks
Compliance
Mandatory
Probability
Probable
Validity status
Planned
Road management
Other
Feed provider
National Highways
Data source
Roadworks
Feed version
1
Record created
Fri, Sep 18, 2026 1:22 PM
Record versioned
Sun, Oct 11, 2026 4:50 AM
Coordinate source
Geometry

Driving on the M25? See every live closure, roadwork and planned restriction on this road.

M25 live closures

Related incidents

M25 Clockwise Jct 30 exit slip lane 1 closure

Planned Roadworks National Highways
Havering M25 · M25 J30 Clockwise Exit

Starts in 8 hours 2 minutes

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:30

M25 Clockwise Jct 30 exit slip lane 1 closure

Category: Road Maintenance
View update

M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure

Planned Roadworks National Highways
Hersham M25 · M25 Anti-Clockwise At The Cobham Services Between J10 And J9

Starts in 8 hours 2 minutes

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:30

M25 Anti-clockwise Jct 10 to Jct 9 carriageway closure

Category: Road Maintenance
View update

M25 Clockwise Jct 4 to Jct 5 carriageway closure

Cleared Roadworks National Highways
Dunton Green M25 · M25 Clockwise Between J4 And J5

Expected to clear in 15 hours 32 minutes

Started 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:30

M25 Clockwise Jct 4 to Jct 5 carriageway closure

Category: Road Maintenance
View update

M25 Clockwise Jct 4 to Jct 5 lane 1 closure

Planned Roadworks National Highways
Dunton Green M25 · M25 Clockwise Within J5

Starts in 8 hours 2 minutes

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:30

M25 Clockwise Jct 4 to Jct 5 lane 1 closure

Category: Road Maintenance
View update

M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure

Planned Roadworks National Highways
Buckinghamshire M25 · M25 Anti-Clockwise Between J18 And J17

Starts in 8 hours 2 minutes

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:30

M25 Anti-Clockwise Jct 17 Exit Slip Road Lane 1 Closure

Category: Road Maintenance
View update

M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure

Planned Roadworks National Highways
St Albans M25 · M25 Clockwise Within J21

Starts in 8 hours 2 minutes

Starts 12 Oct 2026, 21:00 Expected clear 13 Oct 2026, 04:30

M25 Clockwise jct 21 to Jct 21A Lane 4,3 closure

Category: Road Maintenance
View update