M20 eastbound Jct 11A exit slip (Euro Tunnel) carriageway closure
ClearedM20 eastbound Jct 11A exit slip (Euro Tunnel) carriageway closure
- Start time
- Sat, Jan 24, 2026 6:00 PM
- Expected end
- Sun, Jan 25, 2026 4:00 AM
- Duration
- 10 hours
- Road
- M20 – M20 J11A Eastbound Exit
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Roadworks
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Tue, Jan 13, 2026 5:09 PM
- Last updated
- Sat, Jan 24, 2026 5:34 PM
- Cleared
- Sun, Jan 25, 2026 4:00 AM
- Latest update: M20 eastbound Jct 11A exit slip (Euro Tunnel) carriageway closure
- Coordinates
- 51.092504, 1.091166
- Latitude span
- 51.092052 – 51.092993
- Longitude span
- 1.087221 – 1.094732
- Bounding box centre
- 51.092523, 1.090977
- Location descriptions
-
- M20 J11A eastbound exit
- M20 eastbound between J11 and J11A
- Feed validity status
- Planned
- Overall feed start
- Sat, Jan 24, 2026 6:00 PM
- Overall feed end
- Sun, Jan 25, 2026 4:00 AM
- Feed window length
- 10 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- carriagewayClosures (Carriageway Closures)
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
3 coordinate pairs- Description
- M20 J11A eastbound exit
- Lanes Restricted
- 2 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M20
- Linear Element Model
- The Network Model
- Linear Element Id
- {18E34921-2844-4289-AEC9-62BDFD8D075E}
- Linear Element Type
- A Carriageway Exit Slip
- From Distance
- 0 m
- To Distance
- 148 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.092647 1.092679 51.092871 1.094008 51.092993 1.094732
Segment 2
6 coordinate pairs- Description
- M20 eastbound between J11 and J11A
- Carriageway
- Dual Carriageway
- Lanes Restricted
- 4 lanes restricted
- Operational Lanes
- 0 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End1
- Linear Element Road
- M20
- Linear Element Model
- The Network Model
- Linear Element Id
- {E229EDC5-C448-4535-A956-EA7E5F0339D0}
- Linear Element Type
- A Carriageway
- From Distance
- 1,891 m
- To Distance
- 2,279 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.092052 1.087221 51.092073 1.087527 51.092258 1.089053 51.092402 1.090405 51.092597 1.09219 51.092647 1.092679
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- 1.092679, 51.092647
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
1.092679,
51.092647
],
[
1.094008,
51.092871
],
[
1.094732,
51.092993
],
[
1.087221,
51.092052
],
[
1.087527,
51.092073
],
[
1.089053,
51.092258
],
[
1.090405,
51.092402
],
[
1.09219,
51.092597
],
[
1.092679,
51.092647
]
]
]
}
View road section coordinates
[
[
[
1.092679,
51.092647
],
[
1.094008,
51.092871
],
[
1.094732,
51.092993
],
[
1.087221,
51.092052
],
[
1.087527,
51.092073
],
[
1.089053,
51.092258
],
[
1.090405,
51.092402
],
[
1.09219,
51.092597
],
[
1.092679,
51.092647
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Roadworks
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Carriageway Closures
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 1
- Record created
- Tue, Jan 13, 2026 5:09 PM
- Record versioned
- Sat, Jan 24, 2026 5:34 PM
- Coordinate source
- Geometry
Driving on the M20? See every live closure, roadwork and planned restriction on this road.
M20 live closuresRelated incidents
M20 Eastbound Jct 1 entry slip road closure
Planned Roadworks National HighwaysStarts in 17 hours 32 minutes
M20 Eastbound Jct 1 entry slip road closure
M20 Eastbound Jct 1 to Jct 2 lane 1,2 closure
Planned Roadworks National HighwaysStarts in 17 hours 32 minutes
M20 Eastbound Jct 1 to Jct 2 lane 1,2 closure
M20 eastbound lane 3 closure (57/7A to 61/7A)
Planned Roadworks National HighwaysStarts in 15 hours 32 minutes
M20 eastbound lane 3 closure (57/7A to 61/7A)
M20 eastbound lane 4 lane 3 closure (94/5a to 98/9a)
Cleared Roadworks National HighwaysCleared 2 days 8 hours ago
M20 eastbound lane 4 lane 3 closure (94/5a to 98/9a)
M20 eastbound lane 4 lane 3 closure (94/5a to 98/9a)
Cleared Roadworks National HighwaysCleared 2 days 3 hours ago
M20 eastbound lane 4 lane 3 closure (94/5a to 98/9a)
M20 eastbound hard shoulder closure entry slip road
Cleared Roadworks National HighwaysCleared 2 days 12 hours ago
M20 eastbound hard shoulder closure entry slip road