M20 eastbound hard shoulder closure (56/0 to MP 56/5)
ClearedM20 eastbound hard shoulder closure (56/0 to MP 56/5)
- Start time
- Thu, Oct 22, 2026 8:00 AM
- Expected end
- Thu, Oct 22, 2026 2:00 PM
- Duration
- 2 seconds
- Road
- M20 – M20 Eastbound Between J5 And J6
- Category
- Road Maintenance
- Direction
- Eastbound
- Carriageway
- Dual Carriageway
- Reason
- Maintenance Work
Move Insights
Thinking of moving to this area?
Check flood risk, planning history, EPC ratings and more with a Move Insights property report.
- First published
- Wed, Oct 14, 2026 8:03 AM
- Last updated
- Thu, Oct 22, 2026 6:52 AM
- Cleared
- Thu, Oct 22, 2026 8:00 AM
- Latest update: M20 eastbound hard shoulder closure (56/0 to MP 56/5)
- Coordinates
- 51.298611, 0.509417
- Latitude span
- 51.298472 – 51.298854
- Longitude span
- 0.507063 – 0.513426
- Bounding box centre
- 51.298663, 0.510245
- Location descriptions
-
- M20 eastbound between J5 and J6
- Feed validity status
- Planned
- Overall feed start
- Thu, Oct 22, 2026 8:00 AM
- Overall feed end
- Thu, Oct 22, 2026 2:00 PM
- Feed window length
- 6 hours
- Probability code (raw)
- probable
- Compliance option (raw)
- mandatory
- Source identification (raw)
- roadworks
- Management type value
- other
- Contra-flow flag (raw)
- false
- Width restriction flag (raw)
- false
- Height restriction flag (raw)
- false
- Weight restriction flag (raw)
- false
Segment 1
6 coordinate pairs- Description
- M20 eastbound between J5 and J6
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start1 End2
- Linear Element Road
- M20
- Linear Element Model
- The Network Model
- Linear Element Id
- {3E006EC5-B34D-446D-BF72-0C2A312942D6}
- Linear Element Type
- A Carriageway
- From Distance
- 0 m
- To Distance
- 398 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.298517 0.507739 51.298583 0.508847 51.298612 0.509594 51.298711 0.51125 51.298758 0.512027 51.298854 0.513426
Segment 2
3 coordinate pairs- Description
- M20 eastbound between J5 and J6
- Carriageway
- Dual Carriageway
- Lane Usage
- Lh
- Lane Number
- 0
- Lane Status
- Closed
- Lane Direction
- Aligned
- Lanes Restricted
- 0 lanes restricted
- Operational Lanes
- 4 operational lanes
- Direction On Section
- East Bound
- Direction Relative
- Aligned
- Height Grade
- Start2 End1
- Linear Element Road
- M20
- Linear Element Model
- The Network Model
- Linear Element Id
- {6DAA00C1-38F8-4260-A9FF-BC9F7FFA614D}
- Linear Element Type
- A Carriageway
- From Distance
- 592 m
- To Distance
- 640 m
- Gml Srs Name
- EPSG::4326
- Gml Srs Dimension
- 2
Raw coordinate list
51.298472 0.507063 51.298472 0.507066 51.298517 0.507739
- Geometry type
- MultiLineString
- Geometry points
- 9
- First coordinate pair
- 0.507739, 51.298517
- Road section segments
- 1
- Road section points
- 9
View geometry JSON
{
"type": "MultiLineString",
"coordinates": [
[
[
0.507739,
51.298517
],
[
0.508847,
51.298583
],
[
0.509594,
51.298612
],
[
0.51125,
51.298711
],
[
0.512027,
51.298758
],
[
0.513426,
51.298854
],
[
0.507063,
51.298472
],
[
0.507066,
51.298472
],
[
0.507739,
51.298517
]
]
]
}
View road section coordinates
[
[
[
0.507739,
51.298517
],
[
0.508847,
51.298583
],
[
0.509594,
51.298612
],
[
0.51125,
51.298711
],
[
0.512027,
51.298758
],
[
0.513426,
51.298854
],
[
0.507063,
51.298472
],
[
0.507066,
51.298472
],
[
0.507739,
51.298517
]
]
]
- Cause type
- Road Maintenance
- Detailed cause
- Maintenance Work
- Compliance
- Mandatory
- Probability
- Probable
- Validity status
- Planned
- Road management
- Other
- Feed provider
- National Highways
- Data source
- Roadworks
- Feed version
- 2
- Record created
- Wed, Oct 14, 2026 8:03 AM
- Record versioned
- Thu, Oct 22, 2026 6:52 AM
- Coordinate source
- Geometry
Driving on the M20? See every live closure, roadwork and planned restriction on this road.
M20 live closuresRelated incidents
M20 eastbound hard shoulder closure ( 77/3A to 78/0A)
Planned Roadworks National HighwaysExpected to clear in 3 hours 46 minutes
M20 eastbound hard shoulder closure ( 77/3A to 78/0A)
A20 Eastbound Crittalls Corner to M20 Eastbound Jct 2 lane 3 closure
Planned Roadworks National HighwaysStarts in 10 hours 46 minutes
A20 Eastbound Crittalls Corner to M20 Eastbound Jct 2 lane 3 closure
M20 westbound lane 1 closure on entry slip road Jct 7 towards Jct 6
Cleared Roadworks National HighwaysExpected to clear in 17 hours 46 minutes
M20 westbound lane 1 closure on entry slip road Jct 7 towards Jct 6
M20 eastbound lane 3 lane 2 closure ( 89/8A to 94/4A)
Planned Roadworks National HighwaysStarts in 8 hours 46 minutes
M20 eastbound lane 3 lane 2 closure ( 89/8A to 94/4A)
A20 Eastbound Crittalls Corner to M20 Eastbound Jct 2 lane 3 closure
Cleared Roadworks National HighwaysCleared 8 hours 18 minutes ago
A20 Eastbound Crittalls Corner to M20 Eastbound Jct 2 lane 3 closure
M20 eastbound lane 3 lane 2 closure ( 89/8A to 94/4A)
Cleared Roadworks National HighwaysCleared 6 hours 53 minutes ago
M20 eastbound lane 3 lane 2 closure ( 89/8A to 94/4A)